Example: marketing

MECHANICAL SYMBOLS AND ABBREVIATIONS - …

NOTE: ALL SYMBOLS AND ABBREVIATIONS SHOWN. MECHANICAL SYMBOLS AND ABBREVIATIONS ARE NOT NECESSARILY USED ON THE DRAWINGS. GENERAL NOTES SYMBOLS DRAWING/DETAIL REFERENCE. SYMBOL DESCRIPTION REFER TO. 1. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIES DRAWING/DETAIL NUMBER. HAVING JURISDICTION. PROVIDE ALL PERMITS, INSPECTIONS, LICENSES AND FEES. FURNISH ACOUSTICAL DUCT LINING (FIGURES. 20X20 RE: 2 ALL LABOR, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO PROVIDE COMPLETE AND SHOWN ARE INSIDE DUCT DIMENSIONS. OPERATIONAL SYSTEMS. SHEET NUMBER. 2. THE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL DESIGN AND ARRANGEMENT 20X20 SUPPLY AIR DUCT UP (POSITIVE PRESSURE). 10X10 NECK SIZE OR WIDTH X HEIGHT. OF PIPES, FIXTURES, EQUIPMENT, SYSTEMS, ETC. INFORMATION SHOWN IS DIAGRAMMATIC IN A 250. (FOR LOUVERS). CHARACTER AND DOES NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. RETURN, EXHAUST OR OUTSIDE AIR INTAKE AMOUNT OF AIR.)

18"x14" ¡ ahu-1 ef-3 a6 40 b10 260 a6 35 a6 40 a10 210 a12 430 a10 365 a12 430 g22/22 g22/22 b10 360 g22/22 b10 250 e8 250 m8 m8 e8 …

Tags:

  Mechanical, Abbreviations, Symbols, Mechanical symbols and abbreviations

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of MECHANICAL SYMBOLS AND ABBREVIATIONS - …

1 NOTE: ALL SYMBOLS AND ABBREVIATIONS SHOWN. MECHANICAL SYMBOLS AND ABBREVIATIONS ARE NOT NECESSARILY USED ON THE DRAWINGS. GENERAL NOTES SYMBOLS DRAWING/DETAIL REFERENCE. SYMBOL DESCRIPTION REFER TO. 1. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIES DRAWING/DETAIL NUMBER. HAVING JURISDICTION. PROVIDE ALL PERMITS, INSPECTIONS, LICENSES AND FEES. FURNISH ACOUSTICAL DUCT LINING (FIGURES. 20X20 RE: 2 ALL LABOR, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO PROVIDE COMPLETE AND SHOWN ARE INSIDE DUCT DIMENSIONS. OPERATIONAL SYSTEMS. SHEET NUMBER. 2. THE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL DESIGN AND ARRANGEMENT 20X20 SUPPLY AIR DUCT UP (POSITIVE PRESSURE). 10X10 NECK SIZE OR WIDTH X HEIGHT. OF PIPES, FIXTURES, EQUIPMENT, SYSTEMS, ETC. INFORMATION SHOWN IS DIAGRAMMATIC IN A 250. (FOR LOUVERS). CHARACTER AND DOES NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. RETURN, EXHAUST OR OUTSIDE AIR INTAKE AMOUNT OF AIR.)

2 DO NOT SCALE THE DRAWINGS FOR DIMENSIONS. TAKE ALL DIMENSIONS, MEASUREMENTS, 20X20 DIFFUSER, GRILLE DESIGNATION. DUCT UP (NEGATIVE PRESSURE). EQUIPMENT LOCATIONS, LEVELS, ETC FROM THE ARCHITECTURAL DRAWINGS AND FROM THE. EQUIPMENT TO BE FURNISHED. PIPING MAY BE RELOCATED OR OFFSET FOR PROPER. CLEARANCES OR TO AVOID CONFLICTS WITH OTHER TRADES. THE DESIGN INTENT ( 20X20 SUPPLY AIR DUCT DOWN (POSITIVE PRESSURE). 1 ELEVATION NUMBER. PITCHES, VELOCITIES, PRESSURE DROPS, VOLTAGE DROPS, ETC) CANNOT BE GREATLY. M301. ALTERED WITHOUT THE APPROVAL OF THE ARCHITECT. THE COST OF THESE DEVIATIONS TO. AVOID INTERFERENCE'S SHALL BE PART OF THE ORIGINAL CONTRACT BID. RETURN, EXHAUST OR OUTSIDE AIR INTAKE SHEET NUMBER. 20X20. DUCT DOWN (NEGATIVE PRESSURE). 3. EACH SUBCONTRACTOR SHALL CONFER AND COOPERATE WITH ALL OTHER TRADES TO. COORDINATE THEIR WORK. COORDINATION SHALL INCLUDE, BUT SHALL NOT BE LIMITED TO. MATERIALS AND EQUIPMENT ROUTED IN CEILING AND WALL CAVITIES, EQUIPMENT ROUND DUCT UP.

3 ARRANGEMENT IN MECHANICAL SPACES, INCLUDING EQUIPMENT CLEARANCE. 2570 RIVER PARK PLAZA SUITE 100. EMAIL: REQUIREMENTS, ELEVATIONS AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS, FORT WORTH, TEXAS 76116. ETC. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY CONFLICTS. ROUND DUCT DOWN MISCELLANEOUS. PHONE: 817-377-3600. 4. BASE FINAL INSTALLATION OF MATERIALS AND EQUIPMENT ON ACTUAL DIMENSIONS AND. FAX: 817-377-3612. CONDITIONS AT THE PROJECT SITE. FIELD MEASURE FOR MATERIALS AND EQUIPMENT. 1 DRAWING NOTE REFERENCE ( , NOTES BY SYMBOL). REQUIRING EXACT FIT. NO EXTRAS WILL BE GIVEN FOR THE CONTRACTORS FAILURE TO. FIELD COORDINATE. RECTANGULAR DUCT SQUARE ELBOW WITH. TURNING VANES CONNECTION INTO EXISTING. 5. THE OWNER OR ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY. PRECAUTIONS OR FOR MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR. PROCEDURES REQUIRED TO PERFORM THE WORK. W. RECTANGULAR DUCT RADIUS ELBOW. ABBREVIATIONS . 6. THE CONTRACTOR SHALL LOCATE ALL EQUIPMENT THAT MUST BE SERVICED, OPERATED, OR.

4 MAINTAINED IN FULLY ACCESSIBLE POSITIONS. EQUIPMENT SHALL INCLUDE (BUT NOT. LIMITED TO) VALVES, MOTORS, CONTROLLERS, SWITCHGEAR, AND DRAIN POINTS IF R=3W/2 AD ACCESS DOOR L LENGTH. REQUIRED FOR BETTER ACCESSIBILITY. FURNISH ACCESS DOORS FOR THIS PURPOSE. A/C AIR CONDITIONING UNIT LAT LEAVING AIR TEMPERATURE. MINOR DEVIATIONS FROM THE DRAWINGS MAY BE ALLOWED TO PROVIDE FOR BETTER A/E ARCHITECT/ENGINEER LPC LOW PRESSURE CONDENSATE. D ROUND DUCT RADIUS ELBOW. ACCESSIBILITY. ANY CHANGES SHALL BE APPROVED BY THE ARCHITECT AND CONSTRUCTION AFF ABOVE FINISHED FLOOR LPS LOW PRESSURE STEAM. MANAGER/GENERAL CONTRACTOR PRIOR TO MAKING THE CHANGE. AFS AIR FLOW SWITCH LB POUNDS. R=3D/2 AHU AIR HANDLING UNIT LRA LOCKED ROTOR AMPS. 7. THE CONTRACTOR SHALL PROVIDE ACCESS DOORS, WALL OPENINGS, ROOF OPENINGS OR APPROX APPROXIMATE LWT LEAVING WATER TEMPERATURE. 16X20 BAS BUILDING AUTOMATION SYSTEM MAX MAXIMUM. ANY OTHER CONSTRUCTION REQUIREMENT NEEDED TO ACCOMMODATE THE MECHANICAL .

5 EQUIPMENT. LOCATIONS OF THESE OPENINGS SHALL BE SUBMITTED IN SUFFICIENT TIME TO TRANSITION CONCENTRIC UNLESS TOP LEVEL(TOP LVL) BHP BRAKE HORSE POWER MBH 1000 BRITISH THERMAL UNITS / HOUR. 20X20. BE INSTALLED IN THE NORMAL COURSE OF WORK. OR BOTTOM LEVEL(BOT LVL) IS NOTED BTU BRITISH THERMAL UNIT PER HOUR MCA MINIMUM CIRCUIT AMPACITY. C/A COMBUSTION AIR MFR MANUFACTURER. TRANSITION, RECTANGULAR TO ROUND CONCENTRIC CC COOLING COIL MIN MINIMUM. 8. THE CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS OF APPROVED UNLESS TOP LEVEL (TOP LVL) OR BOTTOM LEVEL. 20X20 CFH CUBIC FEET PER HOUR (N) NEW EQUIPMENT. EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO THE PURCHASE AND (BOT LVL) IS NOTED. INSTALLATION OF ANY ELECTRICAL GEAR OR CONDUIT. CFM CUBIC FEET PER MINUTE N/A NOT APPLICABLE. CLG CEILING N/O,N/C NORMALLY OPEN, NORMALLY CLOSED. C. CONNELLY SURVEY ABSTRACT No. 319 TARRANT CO., TX. SQUARE CEILING DIFFUSER (SUPPLY) CU CONDENSING UNIT O/A OUTSIDE AIR/FRESH AIR.

6 9. GENERAL CONTROL WIRING, THERMOSTATS, MOTORIZED DAMPERS AND CONDUIT ASSOCIATE (4-WAY UNLESS OTHERWISE INDICATED). WITH HVAC EQUIPMENT IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR D EQUIPMENT DRAIN OBD OPPOSED BLADE DAMPER. SQUARE CEILING GRILLE (D) EQUIPMENT TO BE REMOVED O/C ON CENTER. SHALL COORDINATE THE LOCATION OF ALL THERMOSTATS, ROOM SENSORS, ETC WITH THE. (RETURN OR EXHAUST) DEG DEGREES PEF PURGE EXHAUST FAN. ARCHITECT AND ALL OTHER TRADES PRIOR TO INSTALLATION. IF A CONFLICT WITH. MILLWORK, LIGHT SWITCHES, WINDOWS, ETC EXISTS, THE CONTRACTOR SHALL NOTIFY THE DB DRY BULB PH PHASE. A NEW LEASE FACILITY FOR. T THERMOSTAT (OR) TEMP SENSOR. CITY OF WESTWORTH VILLAGE, TEXAS. ARCHITECT OF THE POTENTIAL INTERFERENCE PRIOR TO INSTALLATION. INSTALL DN DOWN PROVIDE FURNISH AND INSTALL. THERMOSTATS WITH PROTECTIVE LOCKING COVER, CENTERED AT 4'-0" ABOVE FINISHED (E) EXISTING PRV PRESSURE REDUCING VALVE. FLOOR, UNLESS OTHERWISE INDICATED. COMPLY WITH THE PROVISIONS OF THE AMERICANS EAT ENTERING AIR TEMPERATURE PSI POUNDS PER SQUARE INCH.

7 DUCT SPLITTER WITH DAMPER E/A EXHAUST AIR (R) EQUIPMENT TO BE RELOCATED. WITH DISABILITIES ACT (ADA) AND THE TEXAS ACCESSIBILITY'S STANDARD (TAS). EDH ELECTRIC DUCT HEATER R/A RETURN AIR. EF EXHAUST FAN RE: REFERENCE, REFER. 10. ALL DIMENSIONS SHOWN ON THE DRAWINGS FOR DUCTWORK ARE NET INSIDE CLEAR. M MOTORIZED DAMPER EQUIP EQUIPMENT RL REFRIGERANT LIQUID. DIMENSIONS. FOR RECTANGULAR DUCT, THE FIRST FIGURE OF THE DUCT SIZE INDICATES. EWT ENTERING WATER TEMPERATURE RLA RUNNING LOAD AMPS. THE DIMENSION OF THE FACE SHOWN. VERIFY THAT THE DUCTWORK SPECIFIED WILL FIT IN or MANUAL VOLUME DAMPER. DEGREES FAHRENHEIT RM ROOM. THE SPACE AVAILABLE USING THE ARCHITECTURAL, STRUCTURAL AND ELECTRICAL. FD FIRE DAMPER FCU FAN COIL UNIT RPM REVOLUTIONS PER MINUTE. DRAWINGS AS REFERENCE PRIOR TO FABRICATION AND INSTALLATION. ROUND DUCT OF. FSD FIRE SMOKE DAMPER FD FIRE DAMPER RS REFRIGERANT SUCTION. EQUAL NET INSIDE CLEAR AREA MAY BE USED IN LIEU OF RECTANGULAR DUCT.

8 FLA FULL LOAD AMPS S/A SUPPLY AIR. 11. FLR FLOOR SD SMOKE DETECTOR. PROVIDE TURNING VANES ON ALL RECTANGULAR SUPPLY, EXHAUST AND RETURN. FPVAV FAN POWERED VAV SF SQUARE FOOT, SUPPLY FAN. DUCTWORK INCLUDING THE TOP AND BOTTOM OF VERTICAL DUCTS. FSD FIRE SMOKE DAMPER SPECS SPECIFICATIONS. 12. FT. FOOT, FEET T, TSTAT THERMOSTAT, ROOM SENSOR. PROVIDE A LOCKING QUADRANT VOLUME DAMPER AT THE TAP OF EACH RUN-OUT TO. FT. WG FEET WATER GAUGE T/A TRANSFER AIR. DIFFUSERS FOR BALANCING PURPOSES, UNLESS OTHERWISE INDICATED. THE RUN-OUT PRIMARY MECHANICAL CODES : GA GAUGE THRU THROUGH. DUCT SIZE IS THE SAME SIZE AS THE DIFFUSER OR GRILLE NECK SIZE UNLESS OTHERWISE MECHANICAL : 2003 INTERNATIONAL MECHANICAL CODE (WITH CITY AMENDMENTS). GPM GALLONS PER MINUTE TSP TOTAL STATIC PRESSURE. INDICATED. ENERGY: 2003 INTERNATIONAL ENERGY CODE (WITH CITY AMENDMENTS). H HEIGHT TSTAT THERMOSTAT OR ROOM SENSOR. HP HORSEPOWER TYP TYPICAL. 13. CEILING SPACE IS NEEDED AS A RETURN AIR PLENUM IN CERTAIN AREAS.

9 FOLLOW ALL PROJECT DESIGN VALUES: HPC HIGH PRESSURE CONDENSATE UL UNDERWRITERS LABORATORIES, INC. APPLICABLE CODES AS TO MATERIALS ALLOWED FOR USE IN AIR PLENUMS. COORDINATE OUTDOOR DESIGN TEMPERATURE (SUMMER): HPS HIGH PRESSURE STEAM UH UNIT HEATER. WITH THE GENERAL CONTRACTOR TO PROVIDE FREE RETURN OF AIR FROM ALL LOCATIONS. AMBIENT TEMPERATURE AT CONDENSING UNITS: HWR HEATING WATER RETURN V VOLTS. OUTDOOR DESIGN TEMPERATURE (WINTER): HWS HEATING WATER SUPPLY VAV VARIABLE AIR VOLUME. 14. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION OF ALL FIRE RATED WALLS AND INDOOR DESIGN TEMPERATURE (SUMMER): HZ HERTZ VEL VELOCITY. CEILINGS. PROVIDE FIRE DAMPERS AND/OR COMBINATION FIRE/SMOKE DAMPERS IN INDOOR DESIGN TEMPERATURE (WINTER): IN. INCH, INCHES VFD VARIABLE FREQUENCY DRIVE. DUCTWORK AT ALL LOCATIONS WHERE DUCTS PASS THROUGH FIRE RATED ASSEMBLY. OUTSIDE AIR REQUIREMENTS: PER IMC TABLE INCHES WATER GAUGE W/ WITH. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING FIRE.

10 J-BOX JUNCTION BOX WB WET BULB. AND SMOKE DAMPERS. COORDINATE CONSTRUCTION REQUIREMENTS WITH GENERAL. kW KILOWATT W/O WITHOUT. CONTRACTOR. 15. LOCATION OF ALL GRILLES, REGISTERS, DIFFUSERS AND CEILING DEVICES SHALL BE. DETERMINED FROM THE ARCHITECTURAL REFLECTED CEILING PLANS AND WALL SECTIONS. COORDINATE ALL CEILING DIFFUSERS AND GRILLE LOCATIONS WITH LOCATION OF LIGHTS. 16. ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH SMACNA. STANDARDS. ALL DUCT WORK FROM AHU TO TERMINAL UNIT SHALL BE CONSTRUCTED TO 1". AND SEALED TO SMACNA CLASS A. DUCT WORK DOWN STREAM OF TERMINAL UNITS. SHALL BE CONSTRUCTED TO 1/2" AND SEALED TO SMACNA CLASS C. SEAL ALL SEAMS. WITH UL 181 MASTIC RATED FOR APPLICATION. 17. INSTALL DX PIPING AS SPECIFIED, INCLUDING FILTER/DRYER, SIGHT GLASS, ISOLATION/CHARGING VALVES AND ALL APPURTENANCES PER MANUFACTURER'S. RECOMMENDATIONS. INSTALLATION SHALL BE ACCOMPLISHED IN A NEAT AND ORDERLY. FASHION, AS APPROVED BY THE ENGINEER.


Related search queries