Example: tourism industry

MODEL J Electric Booster Heater - Hubbell Heaters

The Hubbell Booster : A Leap AheadA Long Lasting Booster HeaterThe Hubbell J MODEL is the longest lasting Booster Heater available because it utilizes a heavy duty ASME Section VIII designed, constructed and stamped all stainless steel tank which does not require an internal tank lining. Other manufacturers use a non ASME steel tank with an internal lining which is easily eroded in high temperature water and eventually leaves the bare steel tank exposed to the corrosive effects of water. Once this occurs it is only a short time before a steel tank will begin to rust, leak, and need replacement. Hubbell did not stop at improving just the tank design. For improved appearance and longevity the Hubbell Booster comes standard with a brushed stainless steel outer jacket and base which is impervious to the corrosive effects of water and looks great in your kitchen.

The Hubbell Booster: A Leap Ahead. A Long Lasting Booster Heater. The Hubbell J Model is the longest lasting booster heater . available …

Tags:

  Model, Electric, Heaters, Booster, Hubbell, Model j electric booster heater

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of MODEL J Electric Booster Heater - Hubbell Heaters

1 The Hubbell Booster : A Leap AheadA Long Lasting Booster HeaterThe Hubbell J MODEL is the longest lasting Booster Heater available because it utilizes a heavy duty ASME Section VIII designed, constructed and stamped all stainless steel tank which does not require an internal tank lining. Other manufacturers use a non ASME steel tank with an internal lining which is easily eroded in high temperature water and eventually leaves the bare steel tank exposed to the corrosive effects of water. Once this occurs it is only a short time before a steel tank will begin to rust, leak, and need replacement. Hubbell did not stop at improving just the tank design. For improved appearance and longevity the Hubbell Booster comes standard with a brushed stainless steel outer jacket and base which is impervious to the corrosive effects of water and looks great in your kitchen.

2 The Hubbell Booster is also equipped as standard with the advanced functionality of an electronic temperature controller to provide accurate, reliable and energy efficient operation while simplifying service work. The Hubbell Booster s closed cell foam insulation also improves operating efficiency and reduces the cost of operation. When you specify and install a Hubbell Booster Heater , you will have confidence in knowing that the owner will be provided with a long lasting and trouble-free source for 180 F 9001:2008 ISOF eatures Heavy Duty Construction All stainless steel tank construction does not require an internal lining ASME Section VIII stamped construction provides for extended tank life Exterior surfaces including the jacket, base and front cover are all brushed stainless steel for improved appearance and longevity Advanced Design Advanced electronic temperature control with digital display confirms at a glance proper operation and temperature setting Visual indication of exact set point temperature as well as fault conditions provides instant feedback Electronic leak detection system notifies user in the event of an internal water leak Factory packaged resettable circuit breakers for internal over current protection save time and money compared to one shot fuses A bronze body (not cast iron)

3 Pressure reducing valve is factory supplied with each Booster . Designed for ease of service, no electrical component needs to be removed to replace any other part Screw plug elements with O-ring gasket reduce leakage problems associated with less reliable and more difficult to service flange type heating elements. Reliable Overall dimensions and connection locations are compatiblewith other popular brands to facilitate direct replacement without modification to the existing plumbing. Environmentally friendly CFC/HCFC free closed cell foaminsulation minimizes tank heat loss for maximum operating efficiency and reduced operating costs Full ten (10) year (non pro-rated) tank warrantyMODEL JModel JANSI/NSF 5 Electric Booster HeaterFor Use In Commercial Kitchens And Restaurants To Supply 180 F Sanitizing Rinse Water2 Why Install AHubbell Booster Water Heater ?

4 Resettable circuit breakers (on units over 120 amps) replace one-shot fusesBrushed stainless steel exterior increases life and looks greatElectronic control module integrates all control functions into one componentASME stamped all stainless steel tank for extended lifeOperator controls are easily accessible including ON/OFF, Reset, and Temperature AdjustmentDigital display provides visual set point and fault conditionsScrew plug elements simplify serviceLeak detection system notifies the user if water is detected inside the control areaAll sensing functions are integrated into one probeNote: All components are removable without disturbing any other component1 Improved LongevityThe Hubbell Booster Heater is designed to provide many years of operation. The tank is all stainless steel construction and is designed, constructed and stamped in strict conformance to ASME Section Lower Operating CostsThe Hubbell Booster tank is encapsulated in environmentally friendly CFC/HCFC free closed cell foam insulation to minimize stand-by heat loss.

5 This high quality insulation reduces heat loss compared to fiberglass type insulation found in other brands. 3 Reduced Service and Maintenance CostsHubbell has greatly simplified Booster Heater service and maintenance through numerous advancements in Booster design and controls. The Hubbell controller is a major step forward with improved ease of use and service. The digital display provides the owner and technician with an exact set point temperature as well as visual error indication. Because the controller can be set to the exact desired temperature in degrees there is no more hotter/colder calibration. It alsoincludes a leak detection system to notify the user in the event of an internal leak. For further ease of service and maintenance, all controls are mounted such that when a component is removed for service no other component needs to be removed, and all sensing functions have been consolidated into one probe, which can be replaced without draining the tank.

6 The heating element and sensing probe are straight thread screw types that utilize an O-ring to minimize leakage problems as is common with flat gaskets and NPT cell foam insulation lowers operating costsSingle point power connectionModel J6 Shown3 MODEL Number Selection Chart With 6, 7, and 9KW models in 208 and 240 volt can be field converted from either 1 phase to 3 phase or from 3 phase to 1 3 phase units are factory wired as a balanced 3 phase are also available in 380, 415, 440 and 575 volt. Please consult factory for exact KW selection in these ModelKW RatingStorage CapacityFull MODEL Number Listed by Voltage and PhaseAmperage Draw by Voltage and Phase120 V208 V240 V480 V480 V600 V120 V208 V240 V480 V600 V1 1 3 1 3 3 1 3 1 1 3 1 3 3 3 24 48 4828 5029 Gallons J411R 31 27 J427R J427T 75 65 J616 GallonsJ61A 8 13 2J62A 17 3J63A 25 4 J64RS J64S J64T4S 19 17 5 J65RS J65S J65T4S 24 21 6 J66 RSJ66RJ66SJ66TJ66T4 J66T6 29172514767 J67 RSJ67RJ67SJ67TJ67T4 J67T6 34192917879 J69 RSJ69RJ69SJ69TJ69T4 J69T6 J610 RSJ610RJ610SJ610TJ610T4 J610T6 50294425131012 J612 RSJ612RJ612SJ612TJ612T4 J612T6 J613 RSJ613RJ613SJ613TJ613T4 J613T6 65385633161315

7 J615 RSJ615RJ615SJ615TJ615T4 J615T6 72426336181418 J618 RSJ618RJ618SJ618TJ618T4 J618T6 87507543221724 J624 RSJ624RJ624SJ624TJ624T4 J624T6 1156710058292327 J627 RSJ627RJ627SJ627TJ627T4 J627T6 1307511365332630 J630 RSJ630RJ630SJ630TJ630T4 J630T6 1448312572362936 J636 RSJ636RJ636SJ636TJ636T4 J636T6 17310015087433539 J639 RSJ639RJ639SJ639TJ639T4 J639T6 J640 RSJ640RJ6040SJ640TJ640T6 J640T6 19511316998493945 J645RJ645SJ645TJ645T4 J645T6 125188108544354 J654R J654TJ654T4 J654T6 150 J658R J658TJ658T4 J658T6 163 1417056J16116 GallonsJ161A 8 13 2J162A 17 3J163A 25 4 J164RS J164S J164T4S 19 17 5 J165RS J165S J165T4S 24 21 6 J166 RSJ166RJ166SJ166TJ166T4 J166T6 29172514767 J167 RSJ167RJ167SJ167TJ167T4 J167T6 34192917879 J169 RSJ169RJ169SJ169TJ169T4 J169T6 J1610 RSJ1610RJ1610SJ1610TJ1610T4 J1610T6 50294425131012 J1612 RSJ1612RJ1612SJ1612TJ1612T4 J1612T6 J1613 RSJ1613RJ1613SJ1613TJ1613T4 J1613T6 65385633161315 J1615 RSJ1615RJ1615SJ1615TJ1615T4 J1615T6 72426336181418 J1618 RSJ1618RJ1618SJ1618TJ1618T4 J1618T6 87507543221724 J1624 RSJ1624RJ1624SJ1624TJ1624T4 J1624T6 1156710058292327 J1627 RSJ1627RJ1627SJ1627TJ1627T4 J1627T6 1307511365332630 J1630 RSJ1630RJ1630SJ1630TJ1630T4 J1630T6 1448312572362936 J1636 RSJ1636RJ1636SJ1636TJ1636T4 J1636T6 17310015087433539 J1639 RSJ1639RJ1639SJ1639TJ1639T4 J1639T6 J1640 RSJ1640RJ1640SJ1640TJ1640T4 J1640T6 19511316998493945 J1645RJ1645SJ1645TJ1645T4 J1645T6 125188108544354 J1654R J1654TJ1654T4 J1654T6 150 J1658R J1658TJ1658T4 J1658T6 163 1417056J16with 1-1/2 inlet

8 Outlet6416 Gallons J1664R 178 68 J1668TJ1668T4 J1668T6 164826681 J1681R J1681TJ1681T4 225 19598 86 J1686R J1686T6 239 8388 J1688TJ1688T4 212106 4 Recovery Ratings 64-88 kW64131087365543737432823818768139292869 6464398348253199811658110582955347441530 1237861761117488058750344032025288180212 01901601515450328257 Rated VoltageApplied VoltageKW De-Rating Factor60057592%60055084%48046092%4804408 4%24023092%24022084%Voltage De-Rating FactorsRecovery Ratings kWKW RatingRecovery Rate in GPH at F Temperature Rise ( T)20 T30 T40 T60 T70 T80 T110 T140 To Solve For:recoveryGPH x OF T x = KWKW x 410 GPH = OF TKW x 410 OF T = GPHNote: 1 KW will heat GPH at a 100OF TelectricalKW x 1000 = Amps 3 Phase VoltsKW x 1000 = Amps 1 Phase VoltsApplied Votage2 x Rated KW = KW output at applied voltage Rated Voltage2 Metric conversionLiters x = GallonsGallons x = LitersGallons x = m3m3 x = Gallons1 F T = F T F = ( C x ) + 32 C = ( F - 32) x x = BarBar x = psipsi x = kPakPa x = psiLbs x = KgKg x = x = x = the actual supply voltage (applied voltage) is different than the Booster design voltage (rate voltage) the resulting KW output will be affected.

9 Please see the chart for typical voltage de-rating factors, or use the following formula:5 Knockouts: Left Side And Bottom3/4" X 1" X 1-1/4" MODEL J6 - (1 to 18 kW) DimensionsShipping Weight: 95 J6 - (24 to kW) DimensionsShipping Weight: 110 J16 - (1 to kW) DimensionsShipping Weight: 160 "23 1/2"2"2"23"2 5/8"3 1/2"Front9 3/4"9 3/4"3/4" MNPTO utlet Nipple3/4" MNPTI nletBottom ViewRight Side ViewKnockouts: Left Side - 1-1/2" X 2"Bottom - 1-1/2" X 2" and 3/4" X 1" X 1-1/4"Relief Valve2"2 5/8"6"16 1/2"25 3/8"Inlet3/4" MNPT6"15"1 1/2"7 7/8"2"2"3"11 1/2"18"12"Outlet3/4" MNPTRear View24"29 1/8" Side ViewBottom ViewRelief Valve17"5 5/8"3 1/4"3 1/4"3 1/4"1 1/2"2 1/2"Knockouts: Left Side - (1) 1-1/2" X 2"Bottom - (2) 1/2" and (1) 1-1/2" x 2"Rear ViewLeft Side ViewBottom ViewInlet 3/4" MNPT10"1 1/2"13 3/4"13"2 1/4"2"7 7/8"6"6 1/2"Outlet 3/4" MNPT21"25" 1/2"5 3/8"14 1/8"Relief Valve2 1/2"3"9 1/2"6 MODEL J3 - ( to kW) DimensionsShipping Weight: 46 : Shown with optional legsModel J16 - (64 to 88 kW) DimensionsShipping Weight: 195 "23 1/2"23"2 5/8"3 1/2"Front9 3/4"9 3/4"1 1/2" MNPT Inlet1 1/2" MNPT InletBottom ViewRight Side ViewKnockouts.

10 Left Side - 1-1/2" X 2"Bottom - 1-1/2" X 2" and 3/4" X 1" X 1-1/4"1" NPT Relief Valve2"2 5/8"6"16 1/2"25 3/8"1 1/2" MNPT Outlet12 1/2"6"Front ViewRelief Valve9"13 1/4"11 3/4"5 1/2"3/8"3/8"3"5 7/8"13"4 7/8"4 1/2"3/4" FNPT OutletTop View 5/16" MountingHoles (4 Places)Bottom View3/4" FNPT Inlet1/2" ( ) KO4 1/4"1 1/4"1 1/2"1/2"1" x 3/4" x 1/2" knockoutModel J4 - ( to 27 kW) DimensionsShipping Weight: 80 : Shown with optional legs1 9/16"3 17/32"1 1/2" x 1" x 3/4" Knockout 1 1/2" x 1" x 3/4" Knockout Right Side ViewRear ViewBottom View3 3/4"3 17/32"Relief Valve3/4"26 3/4" (Approx.)20 5/8"23 1/16"7"6"2 15/16"2 3/4"11 7/16"1 1/8"10 13/16"5 13/32"2 1/4"Outlet 3/4" MNPTI nlet 3/4" MNPT(4) 3/8" Holes(Both Sides)for LH or RHMounting7 Typical Installation DiagramsTypical J6 Plumbing Connections(Rear View)Plumbing unions as supplied must be installed in the inlet and outlet piping to prevent check valve may be installed in the supply line to the shut off valves must be gate or ball valves - not globe brass pressure reducing valve with built-in bypass is adjustable from 25 to 75 minimize heat loss and maximize efficiency, hot water piping should be J16 Plumbing Connections(Front View)3/4" Dielectric UnionT&P Relief ValveT&P Relief Valve Piping (Air Gap Must Conform To Code)Temperature/Pressure Gauge (Optional)Shock Absorber (Optional)InletGate Valve(Not Supplied)


Related search queries