Example: biology

MPI Architectural Painting Manual Section 09900 …

MPI Architectural Painting Manual Guide specification Revision September 2012 Section 09900 Painting Page 1 of 28 The Master Painters Institute 1997 - 2012 PART 1 - GENERAL SPEC NOTES: .1 Use this specification Section when a comprehensive specification is required to specify Painting of new, previously unpainted exterior and interior surfaces..2 Work under this Section also includes: moisture testing and surface preparation of substrates as required for acceptance of paint, including cleaning, small crack repair, patching, caulking, and making good surfaces and specific pre-treatments, sealing, and priming of surfaces to the limits defined within the MPI Architectural Painting Manual .

MPI Architectural Painting Manual Guide Specification Revision – September 2012 Section 09900 Painting Page 1 of 28 The Master Painters Institute 1997 - 2012 PART 1 - …

Tags:

  Manual, Section, Specification, Architectural, Painting, Mpi architectural painting manual section 09900, 09900

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of MPI Architectural Painting Manual Section 09900 …

1 MPI Architectural Painting Manual Guide specification Revision September 2012 Section 09900 Painting Page 1 of 28 The Master Painters Institute 1997 - 2012 PART 1 - GENERAL SPEC NOTES: .1 Use this specification Section when a comprehensive specification is required to specify Painting of new, previously unpainted exterior and interior surfaces..2 Work under this Section also includes: moisture testing and surface preparation of substrates as required for acceptance of paint, including cleaning, small crack repair, patching, caulking, and making good surfaces and specific pre-treatments, sealing, and priming of surfaces to the limits defined within the MPI Architectural Painting Manual .

2 3 Review all requirements noted herein and carefully choose those that meet project requirements. The Specifier must choose one item from a series of items surrounded with [ .. ] brackets and delete the remainder, including all SPEC NOTES. Items surrounded with ( .. ) brackets are additional information / comments that should be left in the specification ..4 Adding or deleting items in this specification must be done with care and caution. The onus of doing so rests with the Specifier who must have a complete and thorough understanding of what is required.

3 Where additional information must be added to this specification the Specifier must ensure that such information is not only accurate but also in accordance with MPI requirements..5 The Owner or Consultant must provide a Finish Schedule for all exterior and interior surfaces to be painted clearly indicating the paint system and gloss level required for each surface type based on MPI descriptions and gloss ratings available for the selected system. This information should be issued to painters bidding the work. Description: SPEC NOTE: This article ( ) is not intended to scope Painting work but to serve as a general description.

4 The onus of defining the extent of this Section of Work remains with the Project General Contractor, who will ensure that the area / scope of responsibility of any particular Subcontractor / supplier is set out in full detail when awarding the Painting and decorating subcontract. The extent of this Section of Work is also governed by the limits of local trade agreements and conditions. This article should be used in conjunction with , Related Sections..1 Section Includes: All labor, materials, tools and other equipment, services and supervision required to complete all exterior and interior Painting and decorating work as indicated on Finish Schedules and to the full extent of the drawings and specifications.

5 2 Work under this contract shall also include, but not necessarily be limited to: SPEC NOTES: .1 Delete, revise or add to example selections listed below as required..2 As a general note, where specification numbers are referenced throughout this Painting specification , they should be revised as required by the specifier to suit project specification Section number requirements (preferably in accordance with the latest version of the MasterFormat numbering system) and/or where other pertinent specification sections are impacted by work of this Section , their numbers should be appropriately inserted as required.

6 A High pressure washing and abrasive blasting in accordance with the requirements of Section [insert appropriate specification Section number]. [SPEC NOTE: see and amend as required.] .b Surface preparation of substrates as required for acceptance of Painting , including cleaning, small crack repair, patching, caulking, and making good surfaces and areas to the limits defined under MPI preparation requirements..c Surface preparation and prime Painting surfaces for wall coverings prior to installation in accordance with MPI and wall covering manufacturer s requirements.

7 [SPEC NOTE: see and amend as required.] .d Specific pre-treatments noted herein or specified in the MPI Architectural Painting specification Manual ..e Priming (except where pre-primed with an approved primer under other Sections of work) and Painting of structural steel, miscellaneous metal, ornamental metal and primed steel equipment..f Priming and back-priming of wood materials as noted herein or specified in the MPI Architectural Painting specification Manual ..g Painting of all semi-concealed areas ( inside of light troughs and valances, behind grilles, and projecting edges above and below sight lines).

8 H Painting of roof vent flashings in accordance with the requirements of Section 07600..i Stencil Painting ( locker numbers in tenant storage rooms). MPI Architectural Painting Manual Guide specification Revision September 2012 Section 09900 Painting Page 2 of 28 The Master Painters Institute 1997 - 2012 .j Zone and traffic marking ( parking lines and numbers, direction arrows, small car, barrier free accessible and visitor parking bay designations, speed bump and pedestrian walkway demarcation, overhead height restrictions, etc.)

9 On exterior (asphalt and/or concrete) and interior (asphalt and/or concrete) surfaces except where such work is part of asphalt or concrete paving specification work..k Painting and finishing of all exposed to view elevator equipment and components ( doors and door frames) unless pre-finished..l Painting of exposed to view mechanical (heating, ventilating and plumbing) services and equipment, , ducts, sprinkler piping, etc., and electrical work to extent noted on Finish Schedule unless pre-finished..m Re- Painting of existing surfaces and finishes when adjacent to new Painting work where applicable including surface preparation, prime and finish coats in accordance with MPI Repainting requirements.

10 N Provision of safe and adequate ventilation as required over and above temporary ventilation supplied by others, where toxic and/or volatile / flammable materials are being used..3 Refer to drawings and schedules ( , Finish Schedule) for type, location and extent of finishes required, and include all touch-ups and field Painting necessary to complete work shown, scheduled or specified..4 This Section along with the drawings forms part of the Contract documents and is to be read, interpreted and coordinated with all other parts, including.