Example: bankruptcy

Northern Iraq - tamintl.com

Unconventional Resources | Drilling & Completions | Reservoir Optimization | Well Intervention The information and/or data in this publication is supplied solely for informational purposes and TAM International makes no guarantees or warranties, either expressed or implied, with respect to its accuracy, completeness or use. 2011 TAM International, 06/11. SlikPak Plus Slickline/E-line Inflatable Packer Well Intervention: Water Shut-Off CASE HISTORY Challenge: Shut-off water producing perforations. Location: Northern Iraq Well Description: Oil producer with 4-1/2 production tubing and 7 production liner Tools Used: OD Retrievable Bridge Plug SlikPak Plus with 3 OD fluid reservoirs* Procedure: Run Bridge Plug through 4-1/2 tubing to setting depth and correlate.

Unconventional Resources | Drilling & Completions | Reservoir Optimization | Well Intervention www.tamintl.com The information and/or data in this publication is supplied solely for informational purposes and TAM International makes no guarantees or warranties, either expressed or …

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Northern Iraq - tamintl.com

1 Unconventional Resources | Drilling & Completions | Reservoir Optimization | Well Intervention The information and/or data in this publication is supplied solely for informational purposes and TAM International makes no guarantees or warranties, either expressed or implied, with respect to its accuracy, completeness or use. 2011 TAM International, 06/11. SlikPak Plus Slickline/E-line Inflatable Packer Well Intervention: Water Shut-Off CASE HISTORY Challenge: Shut-off water producing perforations. Location: Northern Iraq Well Description: Oil producer with 4-1/2 production tubing and 7 production liner Tools Used: OD Retrievable Bridge Plug SlikPak Plus with 3 OD fluid reservoirs* Procedure: Run Bridge Plug through 4-1/2 tubing to setting depth and correlate.

2 Inflate Bridge Plug inside 7 liner and disconnect. Tag Bridge Plug to confirm setting. Results: Bridge Plug set successfully. Value Created: Water production stopped completely and return to 100% oil production. Eliminated costs of processing water production. Improved well economics. *Fluid reservoirs used due to wellbore fluid was produced oil Solution: Run Bridge Plug thru-tubing on e-line to isolate lower water producing perforations.


Related search queries