Example: air traffic controller

Owner's Manual & Assembly Instructions - Lowe's

Model No. EN108-AHM108-A MN108-A NP108NW108-A PD108-A SA108-AVN108-A 's Manual & Assembly Instructions A01 Exterior Dimensions Interior Dimensions Door *Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height 10' x 8' 121" x 92 3/4" 123 1/4" 95 1/4" 70 7/8" 118 1/4" 90" 69 5/8" 55 1/2" 58"3,0 m x 2,3 m 307,3 cm x 235,6 cm 313,1 cm 241,9 cm 180,0 cm 300,4 cm 228,6 cm 176,8 cm 141,0 cm 147,3 cm709290410 Missing Parts, Questions on Assembly ?

Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all

Tags:

  Manual, Instructions

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Owner's Manual & Assembly Instructions - Lowe's

1 Model No. EN108-AHM108-A MN108-A NP108NW108-A PD108-A SA108-AVN108-A 's Manual & Assembly Instructions A01 Exterior Dimensions Interior Dimensions Door *Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height 10' x 8' 121" x 92 3/4" 123 1/4" 95 1/4" 70 7/8" 118 1/4" 90" 69 5/8" 55 1/2" 58"3,0 m x 2,3 m 307,3 cm x 235,6 cm 313,1 cm 241,9 cm 180,0 cm 300,4 cm 228,6 cm 176,8 cm 141,0 cm 147,3 cm709290410 Missing Parts, Questions on Assembly ?

2 Call: 1-800-851-1085Do not return to dealer, they are notequipped to handle your requests. Storage Area: 74 Sq. Cu. Ft. 6,9 m2 11,4 m3 BUILDING DIMENSIONS * Size rounded off to the nearest footCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READSAFETY INFORMATION PROVIDED IN THIS MANUALBEFORE BEGINNING CONSTRUCTION. WEAR GLOVESWHEN HANDLING METAL 's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand this Owner's information and helpful tips will make your construction easier and Instructions : Instructions are supplied in this Manual and contain allappropriate information for your building model.

3 Review all Instructions before you begin,and during Assembly , follow the step sequence carefully for successful and Anchoring: Your storage building must be anchored to prevent winddamage. A base is necessary to construct a square and level building. Anchoring andbase materials are not included with your building. We recommend the combined use ofan Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method ofsecuring your building to the ground (Available by mail order or at your local dealer) oryou may construct a base and anchoring system of your choice. Your assemblyinstructions provide information on a few methods commonly used to secure and levela storage and Parts List: Check to be sure that you have all the necessary parts for yourbuilding.

4 All part numbers can be found on the parts. All of these numbers (before the -) must agree with thenumbers on the parts list. The parts list is located on page 12. If you find that a part is missing, include the model number of your building and contact:Arrow Group Industries, Inc. Customer Service Department1101 North 4th Street Breese, Illinois 622301-800-851-1085 Separate contents of the carton by the part number while reviewing parts list. The first few stepsshow how to join related parts to make larger sub assemblies which will be used later. Familiarize yourself with the hardware and fasteners for easier use during construction. These arepackaged within the carton. Note that extra fasteners have been supplied for your YOU A23 Selecting and Preparing Your Site: Before Assembly , you will want to decide ona location for your building.

5 The best location is a level area with good drainage. Allow enough working space for ease of moving parts into position during Assembly . Be sure therewill be enough space at entrance for doors to open fully and enough space around the building tobe able to fasten the panel screws from the outside. Before you begin the first steps in assembling your parts, a base should be constructed andan anchoring system should be ready to the Weather: Be sure the day you select to install your building is dry and not attempt to assemble your building on a windy day. Be careful on wet or muddy : Whenever possible, two or more people should work together to assembleyour building. One person can position parts or panels while the other is able to handle thefasteners and the and Materials: These are some basic tools and materials you will need for theconstruction of your building.

6 Decide which method of anchoring and the type of base youwish to use in order to form a complete list of the materials you will Preparation Hammer and Nails Spade or Shovel Hand Saw / Power Saw Lumber and/or ConcreteOptional Time-Savers Wrench / Nut Driver Electric / Cordless Drill Square String (for squaring frame)Required Work Gloves Step Ladder Utility Knife / Scissors Pliers Carpenter's Level Tape MeasureRequired Eye Goggles No. 2 Phillips Screwdriver(With Hardened Magnetic Tip)Note: A power screwdriver or vari-able speed drill with Phillips-tip at-tachment can speed Assembly byas much as 40%.PLAN A34 Safety precautions are important to follow throughout the construction of your building. Care must be taken when handling variouspieces of your building since some containsharp edges.

7 Please wear work gloves, eyeprotection and long sleeves when assemblingor performing any maintenance on your build-ing. Practice caution with the tools being used in theassembly of this building. Be familiar with theoperation of all power tools. Never concentrate your total weight on theroof of the building. When using a step laddermake sure that it is fully open and on evenground before climbing on it. Keep children and pets away from worksite toavoid distractions and any accidents whichmay occur. Do not attempt to assemble the building if partsare missing because any building left partiallyassembled may be seriously damaged by lightwinds. Call 1-800-851-1085 Do not attempt to assemble the building on awindy day, because the large panels acting as a"sail", can be whipped about by the wind makingconstruction difficult and A4safety edgesafety edgesharp edgesharp edgeFinish: For long lasting finish, periodically clean and wax the exterior surface.

8 Touch-up scratches as soon as you notice them on your unit. Immediately clean the area witha wire brush; wash it and apply touch-up paint per manufacturer's : Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavyamounts of snow on roof can damage building making it unsafe to enter. In snow country,Roof Strengthening Kits are available for most Arrow Buildings for added protectionagainst heavy snow : Always keep the door tracks clear of dirt and other debris that prevent them fromsliding easily. Lubricate door track annually with furniture polish or silicone spray. Keepdoors closed and locked to prevent wind : Use all washers supplied to protect against weather infiltration and to protectthe metal from being scratched by screws.

9 Regularly check your building for loosescrews, bolts, nuts, etc. and retighten them as : A plastic sheet (vapor barrier) placed under the entire floor area with goodventilation will reduce Wash off inked part numbers on coated panels with soap and water. Silicone caulking may be used for watertight seals throughout the not store swimming pool chemicals in your building. Combustibles andcorrosives must be stored in air tight approved this Owner's Manual and Assembly Instructions for future & A5 A6 WEB6* Some drilling required to fit buildings without mid-wall No. SS404 Makes 8" to 12" (20,3-30,5 cm) wide shelves in any length. Brackets, braces, hardware included. Lumber is not No. SS900-A Grey color 3 shelves Holds up to 85 lbs.

10 (38 kg) (even weight distribution)Heavy-duty, galvanized steel shelf units help organize storagespace. They easily mount on the wall or sit on the floor. Fits allArrow buildings.*SHELF UNITSATTIC KIT / WORKBENCH KITM odel No. AT101 Heavy-duty galvanized steel bars thatfit all 10' (3,0 m) wide Arrow install quickly and easily tohelp organize space and createmore useable space as an attic orworkbench. Will hold up to 250 lbs.(113 kg) evenly drilling required to fit buildings without mid-wall No. AK100 New concrete anchor system permitsanchoring any size Arrow buildingdirectly to a concrete slab. Each kitcontains heavy-duty, hot-dippedgalvanized steel corner gussets andperimeter clips which fit over the floorframe and lag bolt into a concrete Assembly Instructions and a 1/4"masonary drill bit are HANGING RACKM odel No.


Related search queries