PIPELINE RISK ASSESSMENT

PIPELINE Risk ASSESSMENT The Essential Elements: An initiative through collaboration of DNV and W. Kent Muhlbauer Det Norske Veritas All rights reserved. PIPELINE RISK ASSESSMENT The Essential Elements (First published in PIPELINE & Gas Journal May, 2012) info An initiative through collaboration of DNV and W. Kent MuhlbauerPipeline Risk ASSESSMENT The Essential Elements: An initiative through collaboration of DNV and W. Kent Muhlbauer Det Norske Veritas All rights reserved. 1 info GUIDELINES FOR PIPELINE RISK ASSESSMENT Understanding PIPELINE Risk Although pipelines continue to be the safest way to transport fluids over long distances, accidents still threaten the public and/or environment, exposing the industry to scrutiny.

1. Measure in Verifiable Units The risk assessment must include a definition of ‘failure’ and produce verifiable estimates of failure potential. Therefore, the risk assessment must produce a measure of probability of failure (PoF) and a measure of potential consequence.

Tags:

  Assessment, Risks, Measure, Pipeline, Pipeline risk assessment

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of PIPELINE RISK ASSESSMENT

1 PIPELINE Risk ASSESSMENT The Essential Elements: An initiative through collaboration of DNV and W. Kent Muhlbauer Det Norske Veritas All rights reserved. PIPELINE RISK ASSESSMENT The Essential Elements (First published in PIPELINE & Gas Journal May, 2012) info An initiative through collaboration of DNV and W. Kent MuhlbauerPipeline Risk ASSESSMENT The Essential Elements: An initiative through collaboration of DNV and W. Kent Muhlbauer Det Norske Veritas All rights reserved. 1 info GUIDELINES FOR PIPELINE RISK ASSESSMENT Understanding PIPELINE Risk Although pipelines continue to be the safest way to transport fluids over long distances, accidents still threaten the public and/or environment, exposing the industry to scrutiny.

2 Concerns about managing these risks are reflected in PHMSA s recent public meetings and in the Advanced Notice of Proposed Rule Making (ANPRM) of January, 2011. One of PHMSA s primary aims is to establish better risk ASSESSMENT leading to improved integrity management and increased public safety. Essential Elements of PIPELINE Risk ASSESSMENT In collaboration, DNV and W. Kent Muhlbauer introduce an important set of guidelines to address aspects of PIPELINE risk ASSESSMENT not well developed in existing industry standards guidelines that optimize the risk ASSESSMENT efforts of both operators and regulators. DNV is a global leader in integrity and risk management while Mr. Muhlbauer is a leading authority on PIPELINE risk management.

3 This joint effort provides an immediately useful set of common sense tactics to make risk ASSESSMENT more meaningful, defensible, and acceptable to regulators. We have oriented these guidelines to directly satisfy PHMSA s stated goal of smarter risk ASSESSMENT . Our guidelines offer a formalized process with logical, structured approaches to efficiently integrate all available information into a robust risk ASSESSMENT . The guidelines are intentionally concise yet flexible, allowing tailored solutions to situation specific concerns. At the same time, an appropriate level of standardization is incorporated to manage expectations of regulators as well as those regulated. These initial guidelines establish a basic risk ASSESSMENT framework from which to build.

4 Discussion beyond the essentials presented here will be available in subsequent guidance documents. An initiative through collaboration of DNV and W. Kent MuhlbauerSmarter Risk ASSESSMENT Measures risk in verifiable units Calculates failure probabilities grounded in engineering principles Fully characterizes consequence of failure Profiles risk along a PIPELINE Integrates all PIPELINE knowledge Promotes accurate decision making Controls the bias Ensures proper aggregation Intended Outcomes Efficient and transparent risk modeling Accurate, verifiable, and complete results Improved understanding of actual risk Risk based input to guide integrity decision making true risk management Optimized resource allocation leading to higher levels of public safety Appropriate level of standardization facilitating smoother regulatory audits Expectations of regulators.

5 The public, and management fulfilled PIPELINE Risk ASSESSMENT The Essential Elements: An initiative through collaboration of DNV and W. Kent Muhlbauer Det Norske Veritas All rights reserved. 1 info GUIDELINES FOR PIPELINE RISK ASSESSMENT Understanding PIPELINE Risk Although pipelines continue to be the safest way to transport fluids over long distances, accidents still threaten the public and/or environment, exposing the industry to scrutiny. Concerns about managing these risks are reflected in PHMSA s recent public meetings and in the Advanced Notice of Proposed Rule Making (ANPRM) of January, 2011. One of PHMSA s primary aims is to establish better risk ASSESSMENT leading to improved integrity management and increased public safety.

6 Essential Elements of PIPELINE Risk ASSESSMENT In collaboration, DNV and W. Kent Muhlbauer introduce an important set of guidelines to address aspects of PIPELINE risk ASSESSMENT not well developed in existing industry standards guidelines that optimize the risk ASSESSMENT efforts of both operators and regulators. DNV is a global leader in integrity and risk management while Mr. Muhlbauer is a leading authority on PIPELINE risk management. This joint effort provides an immediately useful set of common sense tactics to make risk ASSESSMENT more meaningful, defensible, and acceptable to regulators. We have oriented these guidelines to directly satisfy PHMSA s stated goal of smarter risk ASSESSMENT . Our guidelines offer a formalized process with logical, structured approaches to efficiently integrate all available information into a robust risk ASSESSMENT .

7 The guidelines are intentionally concise yet flexible, allowing tailored solutions to situation specific concerns. At the same time, an appropriate level of standardization is incorporated to manage expectations of regulators as well as those regulated. These initial guidelines establish a basic risk ASSESSMENT framework from which to build. Discussion beyond the essentials presented here will be available in subsequent guidance documents. An initiative through collaboration of DNV and W. Kent MuhlbauerSmarter Risk ASSESSMENT Measures risk in verifiable units Calculates failure probabilities grounded in engineering principles Fully characterizes consequence of failure Profiles risk along a PIPELINE Integrates all PIPELINE knowledge Promotes accurate decision making Controls the bias Ensures proper aggregation Intended Outcomes Efficient and transparent risk modeling Accurate, verifiable, and complete results Improved understanding of actual risk Risk based input to guide integrity decision making true risk management Optimized resource allocation leading to higher levels of public safety Appropriate level of standardization facilitating smoother regulatory audits Expectations of regulators.

8 The public, and management fulfilled PIPELINE Risk ASSESSMENT The Essential Elements: An initiative through collaboration of DNV and W. Kent Muhlbauer Det Norske Veritas All rights reserved. 1 info GUIDELINES FOR PIPELINE RISK ASSESSMENT Understanding PIPELINE Risk Although pipelines continue to be the safest way to transport fluids over long distances, accidents still threaten the public and/or environment, exposing the industry to scrutiny. Concerns about managing these risks are reflected in PHMSA s recent public meetings and in the Advanced Notice of Proposed Rule Making (ANPRM) of January, 2011. One of PHMSA s primary aims is to establish better risk ASSESSMENT leading to improved integrity management and increased public safety.

9 Essential Elements of PIPELINE Risk ASSESSMENT In collaboration, DNV and W. Kent Muhlbauer introduce an important set of guidelines to address aspects of PIPELINE risk ASSESSMENT not well developed in existing industry standards guidelines that optimize the risk ASSESSMENT efforts of both operators and regulators. DNV is a global leader in integrity and risk management while Mr. Muhlbauer is a leading authority on PIPELINE risk management. This joint effort provides an immediately useful set of common sense tactics to make risk ASSESSMENT more meaningful, defensible, and acceptable to regulators. We have oriented these guidelines to directly satisfy PHMSA s stated goal of smarter risk ASSESSMENT . Our guidelines offer a formalized process with logical, structured approaches to efficiently integrate all available information into a robust risk ASSESSMENT .

10 The guidelines are intentionally concise yet flexible, allowing tailored solutions to situation specific concerns. At the same time, an appropriate level of standardization is incorporated to manage expectations of regulators as well as those regulated. These initial guidelines establish a basic risk ASSESSMENT framework from which to build. Discussion beyond the essentials presented here will be available in subsequent guidance documents. An initiative through collaboration of DNV and W. Kent MuhlbauerSmarter Risk ASSESSMENT Measures risk in verifiable units Calculates failure probabilities grounded in engineering principles Fully characterizes consequence of failure Profiles risk along a PIPELINE Integrates all PIPELINE knowledge Promotes accurate decision making Controls the bias Ensures proper aggregation Intended Outcomes Efficient and transparent risk modeling Accurate, verifiable, and complete results Improved understanding of actual risk Risk based input to guide integrity decision making true risk management Optimized resource allocation leading to higher levels of public safety Appropriate level of standardization facilitating smoother regulatory audits Expectations of regulators.


Related search queries