Example: air traffic controller

PLUMBING SYMBOLS & ABBREVIATIONS - BidNet

FROM FLOOR ABOVEFLOOR CLEANOUTFURNISHED BY OTHERSELECTRICAL CONTRACTORBELOW GRADEBELOW FLOORABOVE FINISHED FLOORABOVE CEILINGACAFFBFBGECFBOFCOFFAEWCELECTRIC WATER COOLERFDFLOOR DRAINCLINICAL SERVICE SINKCSSEXPANSION TANKETFROM ABOVEFAFROM BELOWFBFROM FLOOR BELOWFFBELECTRIC WATER HEATEREWHCOMB. EMERGENCY EYE WASH/SHOWEREEWSHEMERGENCY EYE WASHEEWDISHWASHERDWCOMBINATION FIXTURECFBOOSTER HEATERBHDRINKING FOUNTAINDFPLUMBING SYMBOLS & ABBREVIATIONSNOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECTBUILDING AUTOMATION SYSTEMBASBACKFLOW PREVENTION DEVICEBFPBETWEEN JOISTSBJBOTTOM OF PIPEBOPBRITISH THERMAL UNITS PER HOURBTUHCONDENSATECONDCONDENSATE PUMPCPCONTROL VALVECVDNDOWNFPCFIRE PROTECTION SUBCONTRACTORANNOTATION ABBREVIATIONSFLOOR SINKFSWATER CLOSETVENT THRU ROOFVACUUM BREAKERTHERMOSTATIC MIXING VALVETO BELOWPLUMBING CONTRACTORMOP SINK BASINLAVATORYHOT WATER RECIRCULATION PUMPHOSE BIBB (INTERIOR)HIGH AS POSSIBLEHAPHBHWCPLMSBPCTBTMVVBVTRWCWCOSP SUMP PUMPRDROOF DRAINTO FLOOR BELOWTFBTO FLOOR ABOVETFASHSHOWERSERVICE SINKSSLAUNDRY TUBLTICE MAKERIMHANDWASHING SINKHWSHOSE STATIONHSSKSINKTHOUSANDS OF BTU PER HOURMBHPPUMPPRVPRESSURE RELIEF VALVERPZREDUCED PRESSURE BFPTOPTOP OF PIPENOT TO SCALENTSSFSQUARE FOOTSESEWAGE EJECTORMECHANICAL CONTRACTORMCORDOVERFLOW ROOF DRAINGENERAL CONTRACTORGCGPMGALLONS PER MINUTEYARD

hose bibb / wall hydrant vacuum relief valve pipe anchor pipe guides wall cleanout suspended cleanout wco wye strainer wye strainer w/drain valve ... wall cleanout (719) 590-9194 / info@f-w.com colorado springs, colorado 80907 group 4755 forge road, suite 150 0180930.00 09/12/18 eleven mile phase 1 bid set drawn:

Tags:

  Walls, Hydrant, Wall hydrant

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of PLUMBING SYMBOLS & ABBREVIATIONS - BidNet

1 FROM FLOOR ABOVEFLOOR CLEANOUTFURNISHED BY OTHERSELECTRICAL CONTRACTORBELOW GRADEBELOW FLOORABOVE FINISHED FLOORABOVE CEILINGACAFFBFBGECFBOFCOFFAEWCELECTRIC WATER COOLERFDFLOOR DRAINCLINICAL SERVICE SINKCSSEXPANSION TANKETFROM ABOVEFAFROM BELOWFBFROM FLOOR BELOWFFBELECTRIC WATER HEATEREWHCOMB. EMERGENCY EYE WASH/SHOWEREEWSHEMERGENCY EYE WASHEEWDISHWASHERDWCOMBINATION FIXTURECFBOOSTER HEATERBHDRINKING FOUNTAINDFPLUMBING SYMBOLS & ABBREVIATIONSNOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECTBUILDING AUTOMATION SYSTEMBASBACKFLOW PREVENTION DEVICEBFPBETWEEN JOISTSBJBOTTOM OF PIPEBOPBRITISH THERMAL UNITS PER HOURBTUHCONDENSATECONDCONDENSATE PUMPCPCONTROL VALVECVDNDOWNFPCFIRE PROTECTION SUBCONTRACTORANNOTATION ABBREVIATIONSFLOOR SINKFSWATER CLOSETVENT THRU ROOFVACUUM BREAKERTHERMOSTATIC MIXING VALVETO BELOWPLUMBING CONTRACTORMOP SINK BASINLAVATORYHOT WATER RECIRCULATION PUMPHOSE BIBB (INTERIOR)

2 HIGH AS POSSIBLEHAPHBHWCPLMSBPCTBTMVVBVTRWCWCOSP SUMP PUMPRDROOF DRAINTO FLOOR BELOWTFBTO FLOOR ABOVETFASHSHOWERSERVICE SINKSSLAUNDRY TUBLTICE MAKERIMHANDWASHING SINKHWSHOSE STATIONHSSKSINKTHOUSANDS OF BTU PER HOURMBHPPUMPPRVPRESSURE RELIEF VALVERPZREDUCED PRESSURE BFPTOPTOP OF PIPENOT TO SCALENTSSFSQUARE FOOTSESEWAGE EJECTORMECHANICAL CONTRACTORMCORDOVERFLOW ROOF DRAINGENERAL CONTRACTORGCGPMGALLONS PER MINUTEYARD CLEANOUTGCOHWCHW3-WAY CONTROL VALVEANGLE GATE VALVEANGLE GLOBE VALVEBALANCING/SHUTOFF VALVEBALL VALVEBUTTERFLY VALVECHECK VALVECALIBRATED BALANCING VALVECONTROL VALVEGATE VALVEGLOBE VALVEQUICK OPEN VALVESAFETY RELIEF VALVESOLENOID VALVEECCENTRIC REDUCERCONCENTRIC REDUCERFLOW ARROWPIPING SYSTEMGAS COCKPLUG VALVEPLUMBING SYMBOLOGYPRESSURE REDUCING VALVE (WATER)PRESSURE REGULATOR (GAS)PPROPANE GASSTSTORMPDPUMP DISCHARGEOSTOVERFLOW STORMOWOIL WASTEWSANITARY WASTECDCONDENSATE DRAINCACOMPRESSED AIRVSANITARY VENTOVOIL VENTNPCW NONPOTABLE COLD WATERCWDOMESTIC COLD WATERDOMESTIC HW RECIRCULATIONDOMESTIC HOT WATERHW 140 DOMESTIC HOT WATER (OTHER TEMP.)

3 PIPE SLOPE ARROWBACKFLOW PREVENTERHOSE BIBB / WALL HYDRANTVACUUM RELIEF VALVEPIPE ANCHORPIPE GUIDESWALL CLEANOUTSUSPENDED CLEANOUTWCOWYE STRAINERWYE STRAINER W/DRAIN VALVEFLOOR DRAIN - ROUND OR SQUAREFLOOR CLEANOUT - ROUND OR SQUAREPIPE CAPPIPE TURNING DOWNPIPE TURNING UPTEE UPTEE DOWNDROP AND RUNDROP AND TURNTEE OFF TOPTEE OFF BOTTOMCROSS AND RISERPLAN 90 ELBOWPIPE TEEPIPE UNIONFLEXIBLE PIPE CONNECTORWATER METERPUMPAUTOMATIC AIR VENTPRESSURE SWITCHPRESSURE GAUGETHERMOMETERFLOW SWITCHTEMPERATURE SWITCHORORCOFPTMPLUMBING EQUIPMENT DESIGNATIONANNOTATION SYMBOLOGYPLUMBING KEYNOTE#L1 DETAIL OR SECTION MARKSHOWN ON DRAWINGDETAIL MODULE NUMBER###EJECTOR SUMPESWALL CLEANOUT(719) 590-9194 / SPRINGS, COLORADO 80907 GROUP4755 FORGE ROAD, SUITE MILE PHASE 1 BID SETDRAWN:REVIEWED:DATE:PROJECT NO. SYMBOLS & ABBREVIATIONS PLUMBING GENERAL SHALL BE PERFORMED BY A LICENSED PLUMBER OF THE STATE OF , INSTALLATION AND TESTING SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OFSTATEANDLOCAL CODE PROCEDURES, METHODS AND REQUIREMENTS, INCLUDING THE MOST STRINGENT OFHEALTH ANDSAFETY STANDARDS AS REQUIRED AND AS INTERPRETED BY THE AUTHORITY HAVING AND STANDARDS REQUIRED, BUT NOT LIMITED TO THE FOLLOWING:"COLORADO STATE PLUMBING CODE" (2017 EDITION)"INTERNATIONAL PLUMBING CODE" (2015 EDITION)"NFPA 54 - NATIONAL FUEL GAS CODE"APPLICABLE LOCAL AND MUNICIPAL CODES AND AND INTENT OF DRAWINGS: DRAWINGS ARE DIAGRAMMATIC.

4 PIPING IS SHOWN IN SCHEMATICFORM. SCALES INDICATED ARE FOR ARCHITECTURAL REFERENCE ONLY. IT IS NOT INTENDED THAT THEDRAWINGS SHOW EVERY WASTE, VENT, WATER PIPE, FITTING, SUPPORTS, ETC., AND IT IS UNDERSTOODTHAT THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPERINSTALLATION ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES ANDSTANDARD PRACTICES SHALL BE PROVIDED. PLUMBING CONTRACTOR SHALL FIELD VERIFY ALL EXISTINGCONDITIONS PRIOR TO INSTALLATION. REPORT ANY PROBLEMS OR CONFLICTS TO THEARCHITECT/ENGINEER. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOTSCALE DRAWINGS. ANY MINOR CHANGES IN LOCATION OF EQUIPMENT, WASTE VENT, WATER PIPE, ETC.,FROM THOSE LOCATIONS SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT EXTRA COST, IF SODIRECTED BY THE ARCHITECT/ENGINEER BEFORE THE INSTALLATION IS MADE. A MINOR CHANGE INLOCATION IS CONSIDERED TO BE WITHIN 5'-0" OF THE ORIGINAL INDICATED LOCATION.

5 THE EQUIPMENTINDICATED ON THESE DRAWINGS INCLUDE ONLY THE MAJOR EQUIPMENT WITHSTANDING, THE DETAILS PRESENTED IN THESE DRAWINGS VERIFY THE COMPLETENESS OF THEMATERIALS LISTS AND SUITABILITY OF DEVICES TO MEET THE INTENT OF THIS PROJECT. ANY ADDITIONALEQUIPMENT OR MATERIAL REQUIRED, EVEN IF NOT SPECIFICALLY MENTIONED HEREIN SHALL BE PROVIDEDWITHOUT CLAIM FOR ADDITIONAL PAYMENT; IT BEING UNDERSTOOD THAT A COMPLETE AND OPERATIONALPLUMBING SYSTEM, SATISFACTORY TO THE ARCHITECT/ENGINEER AND THE OWNER SHALL BE ONLY THE MANUFACTURER'S TESTED GENERAL NOTES ARE PART OF THIS EXPENSES CARRIED BY THE ARCHITECT/ENGINEER IN TROUBLESHOOTING SYSTEM(S) PROBLEMSCAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POORPERFORMANCE ON THE PART OF A CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR IS RESPONSIBLE FOR ALL SERVICES IN BUILDING AND TO 5'-0" BEYOND THEBUILDING CONSTRUCTION LINE.

6 SITE UTILITY CONTRACTOR IS RESPONSIBLE FOR ALL OTHER ROUTING OF PIPING WITH ALL OTHER TRADES AND STRUCTURAL CONDITIONS TO AVOID ANYCONFLICTS AND ADVISE ARCHITECT/ENGINEER OF ANY POSSIBLE CONFLICTS. VERIFY EXACT LOCATIONS,ELEVATIONS, AND DIMENSIONS OF STRUCTURAL MEMBERS AND A MINIMUM CLEARANCE OF 3'-0" IN FRONT OF ELECTRICAL PANELS AND 1'-0" EITHER SIDE FROMSTRUCTURE TO STRUCTURE AND FLOOR TO STRUCTURE. ROUTE PIPING AROUND AND NOT DIRECTLYABOVE ELECTRICAL PANELS. VERIFY CLEARANCE REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIORTO INSTALLING IN BID, ALL LICENSE, PERMIT, INSPECTION AND OTHER FEES REQUIRED BY UTILITY COMPANIES ORAUTHORITIES HAVING JURISDICTION REQUIRED FOR COMPLETION OF WORK SO THAT NO UNEXPECTEDADDITIONAL EXPENSES ARE INTRODUCED TO INFORM THE ENGINEER, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROMREQUIREMENTS OF LOCAL UTILITIES, MUNICIPALITIES, STATE OR FEDERAL LAWS AND THE WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL COST TO ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC.

7 REQUIRED FOR COMPLETE AND FUNCTIONALSYSTEM AS SPECIFIED AND INDICATED ON THE CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT ANDOTHER DEBRIS BEFORE APPLICATION OF ANY NEW VENTS FROM HORIZONTAL SOIL OR WASTE PIPE SHALL COME OFF TOP OR AT 45 DEGREE VERTICALLYFROM CENTER OF PIPE BEFORE OFFSETTING HORIZONTALLY TO VENT TERMINATIONS SHALL BE COORDINATED WITH BUILDING OPENINGS, AIR INTAKES AND AIREXHAUST OPENINGS. ADJUST VENT THROUGH ROOF LOCATIONS TO COMPLY WITH APPLICABLE CODE ANDTO BE IN THE LEAST VISIBLE EXTERIOR ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. PLUMBINGCONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDINGSTRUCTURAL MEMBERS. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DESIGN OFSUPPLEMENTAL STEEL AND PIPE SUPPORTS, INCLUDING REACTION LOADS TO PRIMARY BUILDINGSTRUCTURAL CONTRACTOR TO PROVIDE AND INSTALL NAIL PLATES WHERE PIPING PASSES THROUGH STUD(S)WITHIN 2" OF NAILING SURFACE TO PROTECT PIPE FROM NAILS OR DRYWALL CONTRACTOR SHALL INSTALL HOT WATER DISTRIBUTION LOOP AND BRANCH SUPPLY PIPING ASCLOSE AS POSSIBLE TO THE HOT WATER INLET SIDE OF POINT OF USE THERMOSTATIC MIXING VALVE,INCLUDING FIXTURES WITH INTEGRAL MIXING VALVES, SO THAT THERE IS NO MORE THAN 10 LINEAR FEETDISTANCE.

8 THIS SHALL BE IN SINGLE FIXTURE APPLICATIONS. LAVATORY HOT WATER PIPING SHALL BEINSTALLED SO THAT THERE IS A MAXIMUM DISTANCE OF 2 FT FROM THE THERMOSTATIC MIXING VALVE TOTHE HOT WATER DISTRIBUTION PIPING PER OF THE 2015 IECC. IN MULTIPLE FIXTURE APPLICATIONSBATTERIED IN WALL OR PIPE CHASES, THE HOT WATER SUPPLY PIPING SHALL BE AS CLOSE AS REASONABLYPOSSIBLE TO THE FIXTURE P-TRAPS FOR FLOOR DRAINS AND FLOOR SINKS SHALL BE DEEP SEAL TRAP FILLED WITH " TRAPS SHALL HAVE A 4" MINIMUM WATER SEAL, 3" AND LARGER SHALL HAVE A 5" WATER CONTRACTOR TO INSTALL, TEST, AND FIELD BALANCE APPROVED EQUIPMENT PERMANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS.(719) 590-9194 / SPRINGS, COLORADO 80907 GROUP4755 FORGE ROAD, SUITE MILE PHASE 1 BID SETDRAWN:REVIEWED:DATE:PROJECT NO. GENERAL NOTES BREAK ROOM103 OFFICE102 OFFICE101 ELECTRICAL107 TOILETS106 CORRIDOR108 LOCKERS105 EVIDENCE104 CLOSET109 SHOP110 VEHICLE BAYS111 RPZ-1 PRV-1L-1WC-1S-1WH-1SH-12P-111 EWH-1WH-1111 EEW-131/2" HWC1" CW11 WSFU& 5 GPM3/4" HW3/4" CW8 WSFU1" CW20 WSFU3/4" CW3 WSFU & 5 GPM1-1/2" CW15 WSFU& 5 GPM1-1/2" CW35 WSFU& 15 GPM3/4" CW4 WSFURWB-11" P1-1/2" CW TO SITEDISTRIBUTION SYSTEM1" P41"P1"P1"P63483/4" P91"P1"P3/4" P3/4"P101-1/2" CW FROM SITEWELL SYSTEM3/4" HW1" HW1/2" HWCSS-13/4" HW1/2" HWC3/4" CW111WH-1111IR-1IR-1IR-2UH-1(ON MEZZ.)

9 4(3/4" P TO UH-1ON MEZZ.)10' MIN71"P51"PBURY PIPING1"P1"P1"CW4UH-23/4" P443/4"P121 SCALE:DOMESTIC PLUMBING PLAN1/8" = 1'-0"GENERAL NOTESA. SANITARY WASTE PIPING SHALL BESLOPED AT 1/8-INCH PER FOOT MINIMUMFOR ALL PIPING 4-INCH AND LARGERAND AT 1/4-INCH PER FOOT MINIMUMFOR ALL PIPING 3-INCH AND PLUMBING CONTRACTOR SHALLINSTALL APPROVED WATER HAMMERARRESTORS IN WATER LINES, BOTH HOTAND COLD, SERVING BATTERY ANDBACK TO BACK FIXTURE INSTALLATIONSIN PIPE SPACE AND PIPE CHASES ANDSHALL BE SEAL ALL EXTERIOR WALLPENETRATIONS AIR AND WATER ROUTE ALL PIPING THROUGHSTRUCTURAL ELEMENTS. COORDINATEPENETRATION SIZES AND LOCATIONSWITH STRUCTURAL. LOCATE ALLVALVES IN-BETWEEN JOISTS ANDPROVIDE ACCESS PANELS FOR FULLVALVE ACCESSIBILITY. REFERENCESTRUCTURAL SEE PLUMBING FIXTURE SCHEDULE FORPIPE SIZING TO INDIVIDUAL INSULATE ALL DOMESTIC WATER PIPINGPER TABLE OF THE 2015 TO SPECIFICATIONS FORADDITIONAL NOTES1.

10 ROUTE DOMESTIC PIPING ON INTERIORSIDE OF INSULATION ON REFER TO WATER ENTRY DIAGRAM FORADDITIONAL SET CALIBRATED BALANCE VALVES TOAPPROXIMATELY CONNECT TO MECHANICAL EQUIPMENTHERE. REFER TO MECHANICAL PLANSFOR ADDITIONAL WELD ALL PROPANE PIPING INTERNALTO BUILDING. EXTERIOR PIPING MAY BETHREADED. PAINT EXTERIOR PIPING TOMATCH BUILDING EXTERIOR. PAINTEXPOSED INTERIOR PIPING TO MATCHCEILING IN EACH ROUTE PROPANE PIPING UP TO GASFURNACE ON MEZZANINE LEVEL PROVIDE MIN 1000 GAL PROPANE TANKMIN 10 FT FROM BLDG EXACT LOCATIONREQUIREMENTS AND RECOMMENDEDSIZE WITH PROPANE ROUTE PROPANE PIPING TIGHT TOSTRUCTURE IN OVERHEAD ABOVE THEINFRARED HEATERS. COORDINATEMECHANICAL EQUIPMENT HEATERCLEARANCES WITH MECHANICALCONTRACTOR PRIOR TO PURCHASE ROUTE 1" PROPANE LINE TIGHT TOINTERIOR OF EXTERIOR WALL REFER TO SHEET PROVIDE ISOLATION AND HIGH POINTVENT VALVES IN RISER TO ALLOW FORWINTER DRAIN DOWN OF 3/4"PROPANE TO UH-1 ON MEZZANINE.


Related search queries