PREFACE The Standard Specifications have been prepared to complement the Standard Detail Drawings and to provide the minimum requirements for products, materials and workmanship with respect to construction of additions to and replacements of the water system that is to be operated by the White House Utility District (WHUD). These Standard Specifications are only to be used for projects with Drawings that have been approved by the Tennessee Department of Environment and Conservation, Division of Water Supply and prepared by WHUD, by its design consultant, or by a developer's engineer, whose Drawings must first be approved by WHUD.

Section 02125 Erosion and Sedimentation Control Part 1 General 1.01 Scope A. The Work specified in this Section consists of providing, maintaining and removing

Tags:

  Control, Erosion, Preface

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of PREFACE - White House Utilities District

1 PREFACE The Standard Specifications have been prepared to complement the Standard Detail Drawings and to provide the minimum requirements for products, materials and workmanship with respect to construction of additions to and replacements of the water system that is to be operated by the White House Utility District (WHUD). These Standard Specifications are only to be used for projects with Drawings that have been approved by the Tennessee Department of Environment and Conservation, Division of Water Supply and prepared by WHUD, by its design consultant, or by a developer's engineer, whose Drawings must first be approved by WHUD.

2 All references in these Standard Specifications to Engineer and Owner shall mean WHUD. WHUD s representative in the field is its Inspector(s). The Inspector has the authority to make decisions on behalf of WHUD in the field to with respect to construction installation of water facilities. This authority includes, but is not limited to: determination of necessary field changes; interpretation of plans and specifications; and assessment of material suitability.

3 These Standard Specifications are subject to revision for a specific project, with such revisions being identified in the Bidding Requirements and Special Conditions document prepared by WHUD or its design consultant, or with such revisions being noted on the Drawings approved by WHUD. WHUD has the final authority as to the use and interpretation of these Standard Specifications. Conditions may require additional requirements not mentioned here. WORK SITE SAFETY The Contractor has sole responsibility for work site safety.

4 Adherence to all applicable laws, regulations, and requirements such as those enforced by OSHA and TOSHA, and the means and methods regarding the construction and installation, are the responsibility of the Contractor. Table Of Contents December 2017 WHUD\WATER\XTC Specifications Division 2 - Sitework 02110 Clearing and Grubbing 02125 erosion and Sedimentation control 02225 Trench Excavation and Backfill 02229 Bore and Jack Casings 02575 Removing and Replacing Pavement 02665 Water Mains and Accessories 02668 Water Service Connections Standard Detail Drawings STD-G-01 Silt Fence Detail STD-G-02 Hay Bale Detail STD-G-03 Asphalt Replacement Detail STD-G-04 Concrete Replacement Detail STD-G-05 Pipe Trenching, Bedding.

5 And Haunching Details STD-G-06 Casing Pipe & Concrete Cap for Streams or Large Drainage Channel Crossing Detail STD-G-07 Casing Pipe for Road Crossing Detail STD-G-08 Concrete Encasement & Concrete Cap Detail STD-G-09 Typical Blocking Detail STD-G-10 Gate Valve Installation Detail STD-G-11 Valve Box Detail STD-G-12 Valve Extension Stem Detail STD-W-01 and 1 S hort Tap Assembly Detail STD-W-01P and 1 S hort Tap Assembly Detail with PEX STD-W-02 and 1 Long Tap Assembly Detail STD-W-02P and 1 Long Tap Assembly Detail with PEX STD-W-03 Typical Water Service Arrangement STD-W-04 2 WHUD Approved Meter STD-W-04B No Rise 2 Metersetter STD-W-05 2 Tap Assembly Detail STD-W-06 4 and Larger Meter with Pre-Cast Concrete Vault (Profile View) Detail STD-W-07 4 and Larger Meter with Pre-Cast Concrete Vault (Plan View) Detail STD-W-08 Schematic RPBP Assembly Layout for Typical Large Meter Installation Detail STD-W-09 4 Permanent Dead-End Detail STD-W-10 Small RPBP Plan & Profile View Detail STD-W-11 Small RPBP Compact Assembly Installation Detail (2 & Larger)

6 STD-W-12 Large RPBP Plan & Profile View Detail (2 or Larger) STD-W-13 Well Pipe Work Separation for New & Existing Public Water Supply Customers Detail STD-W-14 Butterfly Valve Installation Detail STD-W-15 & 1 Air Release Valve Assembly Detail STD-W-16 2 Air Release Valve Assembly Detail STD-W-17 4 Air Release Valve Assembly Detail STD-W-18 Fire Hydrant Assembly Detail STD-W-19 2 Dead End Assembly Detail (Mains 2 6 ) STD-W-20 Storm Drain or Sanitary Sewer Main & Water Main Crossing Detail STD-W-21 Railroad & Water Main Crossing Detail STD-W-22 Insertion Mag Meter & Torsion Assisted Unitized Vault Section 02110 Clearing and Grubbing Part 1 General Scope A.

7 Clearing and grubbing includes, but is not limited to, removing from the Project site, trees, stumps, roots, brush, structures, abandoned Utilities , trash, debris and all other materials found on or near the surface of the ground in the construction area and are to be removed. Precautionary measures that prevent damage to existing features that are to remain is part of the Work. B. Clearing and grubbing operations shall be coordinated with temporary and permanent erosion and sedimentation control procedures. Compliance with Law A.

8 The Contractor shall comply with all applicable codes, ordinances, rules, regulations , requirements, and laws of local, municipal, state or federal authorities having jurisdiction over the Project. All required permits shall be obtained for construction operations by the Contractor. B. Open burning, if allowed, shall first be permitted by the governmental authority having jurisdiction. The Contractor shall notify the local fire department and abide by fire department requirements and restrictions. Job Conditions Location of the Work: The area to be cleared and grubbed is shown schematically on the Drawings or specified below.

9 It includes all areas designated for construction. Part 2 Equipment Equipment The Contractor shall furnish all equipment of the type normally used in clearing and grubbing operations including, but not limited to, tractors, trucks and loaders. Part 3 Execution Scheduling of Clearing A. The Contractor shall clear at each construction site only that length or area of the right-of-way or permanent or construction easement that would be required for the work to be performed during the next thirty (30) days.

10 This area or length shall be determined from the Contractor's Progress Schedule. B. The Engineer may permit clearing for additional areas or lengths of the pipe line provided that erosion and sedimentation controls are in place and a satisfactory stand of grass is established. Should a satisfactory stand of grass not be possible, no 02110 - 2 Clearing and Grubbing additional clearing shall be permitted beyond that specified in section (A) C. A satisfactory stand of grass shall have no bare spots larger than one square yard and all bare spots combined shall not comprise more than one percent of any given area.