Procedure Transmission Division - Eskom

CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database. Procedure Transmission Division Title: Procedure for self -Build Customer Projects in Transmission Unique Identifier: 240-61713594 Alternative Reference Number: N/A Area of Applicability: Transmission Documentation Type: Procedure Revision: 0 Total Pages: 71 Next Review Date: September 2015 Disclosure Classification: CONTROLLED DISCLOSURE Procedure for self -Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database. Unique Identifier: 240-61713594 Revision: 0 Page: 2 of 71 CONTENTS PAGE 1. INTRODUCTION .. 4 2. SUPPORTING CLAUSES .. 4 SCOPE .. 4 Purpose.

Procedure for Self-Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and …

Tags:

  Procedures, Division, Transmissions, Self, Procedure transmission division

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Procedure Transmission Division - Eskom

1 CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database. Procedure Transmission Division Title: Procedure for self -Build Customer Projects in Transmission Unique Identifier: 240-61713594 Alternative Reference Number: N/A Area of Applicability: Transmission Documentation Type: Procedure Revision: 0 Total Pages: 71 Next Review Date: September 2015 Disclosure Classification: CONTROLLED DISCLOSURE Procedure for self -Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database. Unique Identifier: 240-61713594 Revision: 0 Page: 2 of 71 CONTENTS PAGE 1. INTRODUCTION .. 4 2. SUPPORTING CLAUSES .. 4 SCOPE .. 4 Purpose.

2 4 4 NORMATIVE/INFORMATIVE REFERENCES .. 4 Normative .. 4 Informative .. 5 DEFINITIONS .. 5 Classification .. ABBREVIATIONS .. 8 ROLES AND RESPONSIBILITIES .. 10 PROCESS FOR MONITORING .. 10 RELATED/SUPPORTING DOCUMENTS .. 3. GENERAL CONDITIONS AND GUIDELINES FOR self -BUID PROJECTS .. 10 KEY PRINCIPLES AND CONDITIONS .. 12 APPLICATION FOR self -BUILD .. 12 THE self -BUILD PROCESS AND ITS LINKAGES WITH THE Eskom QUOTATION AND EIA PROCESSES. ALLOCATION OF RESPONSIBILITIES BETWEEN Eskom AND THE CUSTOMER IN A self - BUILD PROJECT. CONNECTION CHARGES APPLICABLE TO self BUILD PROJECTS HOLDING POINTS TO ASSURE COMPLIANCE TO Eskom STANDARDS AND SPECIFICATIONS 4. AUTHORIZATION .. 18 5. REVISIONS .. 19 6. DEVELOPMENT TEAM .. 19 7. ACKNOWLEDGEMENTS .. 20 APPENDIX A : Eskom S CONDITIONS AND REQUIREMENTS FOR self -BUILD PROJECTS .. 20 APPENDIX B : CHECKLIST OF Eskom S HOLDING POINTS ..21 APPENDIX C : APPLICABLE STANDARDS, SPECIFICATIONS, GUIDELINES, ETC.

3 25 APPENDIX D : UNDERTAKING BY THE CUSTOMER TO USE INFORMATION PROVIDED SOLELY FOR THE PURPOSE FOR WHICH IT IS INTENDED .. 26 APPENDIX E : DETAILS OF CUSTOMER S AND Eskom S RESPONSIBILITIES .. 27 APPENDIX F : Eskom SUBSTATION DESIGN REQUIREMENTS FOR self -BUILD PROJECTS .. 44 APPENDIX G: Eskom SUBSTATION DESIGN GUIDELINES .. 45 APPENDIX H: TX self -BUILD CONNECTION AGREEMENT PRO FORMA .. 49 APPENDIX I: TYPICAL Eskom STANDARD EQUIPMENT 50 APPENDIX J: GUIDELINES ON COST ALLOCATION AND Transmission ASSET 52 APPENDIX K: Eskom Transmission LINE DESIGN REQUIREMENTS FOR self BUILD 64 Procedure for self -Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database. Unique Identifier: 240-61713594 Revision: 0 Page: 3 of 71 FIGURES Figure 1: Customer Application Process (From initial application up to BQ stage).

4 12 Figure 2: Customer Application Process ( showing touch points between the various Parties in the Project Lifecycle)..14 Procedure for self -Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database. Unique Identifier: 240-61713594 Revision: 0 Page: 4 of 71 INTRODUCTION The Transmission Executive Committee (TEXCO) decided to permit Customers to self -build their network connection assets or infrastructure in order to afford them the opportunity to seek efficiencies on cost and/or connection timelines. This TEXCO decision has been a response to the Customers perception that Eskom s quoted connection costs are high and also that the quoted grid connection timelines are inordinately long. SUPPORTING CLAUSES SCOPE This Procedure outlines the requirements, conditions, mechanisms, rules and process to be followed by Customers electing to self -build their connection infrastructure to the Transmission network.

5 The Procedure applies to both load and generation Customers wishing to connect to the Transmission network. The Procedure is limited to the Transmission scope-of-works of the Customer connection projects. Purpose To provide a detailed Procedure to direct load and generation Customers electing to self -build their connection-infrastructure to connect to the Eskom Transmission System. Note: For connections to the Eskom Distribution System, the Eskom Distribution Procedure for HV self -Build Projects (ref: 240-43874056) shall apply. Applicability This document shall apply to all Transmission Business Units. NORMATIVE/INFORMATIVE REFERENCES Parties using this document shall apply the most recent edition of the documents listed in the following paragraphs. Normative South African Grid Code Environmental Impact Assessment Regulations 2010 (or latest amendment) Expropriation Act Eskom Consideration and Compensation Standard (EST 32-844) National Environmental Management Act, (as amended) Procedure for self -Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database.

6 Unique Identifier: 240-61713594 Revision: 0 Page: 5 of 71 NERSA Guidelines on Transmission Connection Charges Quotation policy and process for generator connections 32-978 Cost estimate pro forma letter (to be revised) Budget quotation pro forma letter (to be revised) self -build connection agreement (to be developed) Substation Layout Design Guide. WGL001 Outage Planning Guideline Occupational Health and Safety Act (OHS Act) Eskom s Operating Regulations for High Voltage Systems (ORHVS) Eskom Practice Note for Implementation of Substation Layouts for Transmission Substations: 240-61713594 TRMSCAAC1: The Design and Construction of Overhead Power Lines SANS10280: Overhead Lines for Conditions Prevailing in South Africa Transmission Line Specifications Template Informative [1] The Electricity Regulation Act as amended [2] The Transmission Licence [3] Grid connection code for renewable power plants [4] Eskom Distribution Procedure for HV self -Build Projects (unique number 240-43874056) DEFINITIONS Definitions Concept design: as per Table 3 in Annexure E Connection assets or connection works: means the work which shall be carried out by Eskom and the Customer to connect the Customer s asset to the Eskom Transmission System.

7 Connection charges: mean the charges recouped or to be recouped by Eskom from the Customer for the cost of construction of the works and connecting the connection works to the Transmission System, which shall be either (a) a Distribution and/or Transmission Standard Connection Charge if the connection is a Standard Connection or (b) a Distribution and/or Transmission Premium Connection Charge, if the connection is a Premium Connection. Connection Charge Guarantee: means a guarantee from the Customer to cover the risk of non-payment where a schedule for the payment of connection charges has been agreed to between Eskom and the Customer. Connection works: means the works required to be constructed to connect the Customer s plant to the Eskom Transmission System. Procedure for self -Build Customer Projects in Transmission CONTROLLED DISCLOSURE When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the database.

8 Unique Identifier: 240-61713594 Revision: 0 Page: 6 of 71 Consultant: means the Customer-appointed agent assuming technical accountability for the self -build project. Contestable works: refers to the activities and connection-works allocated to the Customer in a self -build agreement. Contracting party: the contracting parties shall be Eskom and the Customer. Contractor: means an Eskom -accepted contractor undertaking contestable construction works. Control Plant: means all equipment which is used in the detection of fault conditions in the network in order that the faulty parts of the network are promptly disconnected from the power system, thereby ensuring optimal quality of supply to customers, minimal damage to primary plant, and sustained stability and integrity of the power system. Control plant encompasses all Protection, Telecommunications, DC Supplies, and Measurements equipment in a substation. Customer: means generators and/or load applicants that will be connected to the Eskom network.

9 Dedicated connection assets: mean that portion of the network which is dedicated to a specific Customer; Customer-dedicated assets are assets created for the sole use of a Customer to meet the Customer s technical specifications, and are unlikely to be shared in the Eskom s planning horizon by any other Customer. Design Review Team: an Eskom Technical Governance Committee that evaluates any proposed designs for a project in order to provide assurance that the designs conform to Eskom Standards and specifications. Environmental Impact Assessment (EIA): means the process of examining the environmental effects of a development and obtaining an environmental authorisation to proceed with the development from the relevant authorities in accordance with applicable legislation. It is normally a detailed study or a specialist study of significant issues that have been identified. Environmental Management Programme (EMPr): means an environmental management plan that guarantees the end state of the affected areas and describes how activities that could have a negative impact on the environment will be managed and monitored.

10 It also describes how the impacted areas will be rehabilitated. Eskom Distribution System: means all Eskom power networks from the voltage level of 132kV and below that are not owned by the Eskom Transmission Division . Eskom Standards: the term standard means all related policies, procedures , work instructions and standards in Eskom . Eskom Transmission System: means all Eskom networks with voltage level above 132kV but includes also any voltage-level plant or equipment that is owned and operated by the Eskom Transmission Division . Final design package: means the Eskom accepted technical document detailing the design in line with the Eskom Standards and specifications in accordance with which the asset is to be constructed. Handover: means a point where all self -build network construction is complete, ownership of all such network has been transferred to Eskom and the Contractor s permission to work on them has been removed.