Quantities, Provisions, and Cost Estimating

INDIANA DEPARTMENT OF TRANSPORTATION 2013 DESIGN MANUAL CHAPTER 17 Quantity Estimating Design Memorandum Revision Date Sections Affected 13-01 Jan. 2013 Figure 17-1B 14-04 Mar. 2014 (01) 15-04 Mar. 2015 15-06 Mar. 2015 (03) 16-16 Apr. 2016 , and Figure 17-4D, , (03), and Figures 17-5G thru -5G(2) (deleted), Figures 17-5 I and 17-5J, (added) 16-22 May 2016 (01) through (04) 16-11 REV Sep. 2016 (01), (02), and 17-26 Dec. 2017 (01) 19-05 May 2019 (deleted) The design memorandum applicable revision date is noted in brackets next to each section heading below NOTE: This chapter is currently being re-written and its content will be included in Chapter108 in the future.

INDIANA DEPARTMENT OF TRANSPORTATION—2013 DESIGN MANUAL . CHAPTER 108 . Quantities, Provisions, and Cost Estimating . Design Memorandum . Revision Date

Tags:

  Quantities

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Quantities, Provisions, and Cost Estimating

1 INDIANA DEPARTMENT OF TRANSPORTATION 2013 DESIGN MANUAL CHAPTER 17 Quantity Estimating Design Memorandum Revision Date Sections Affected 13-01 Jan. 2013 Figure 17-1B 14-04 Mar. 2014 (01) 15-04 Mar. 2015 15-06 Mar. 2015 (03) 16-16 Apr. 2016 , and Figure 17-4D, , (03), and Figures 17-5G thru -5G(2) (deleted), Figures 17-5 I and 17-5J, (added) 16-22 May 2016 (01) through (04) 16-11 REV Sep. 2016 (01), (02), and 17-26 Dec. 2017 (01) 19-05 May 2019 (deleted) The design memorandum applicable revision date is noted in brackets next to each section heading below NOTE: This chapter is currently being re-written and its content will be included in Chapter108 in the future.

2 TABLE OF CONTENTS TABLE OF CONTENTS .. 2 LIST OF FIGURES .. 5 7 Guidelines for Preparing Quantity Computations .. 7 Computation Records .. 8 Units of Measurement .. 8 Non-Defined Work .. 9 (01) Lump Sum Pay Unit .. 9 (02) Item Included in Other Work .. 9 Proprietary Material [Rev. Aug. 2011, Apr. 2016] .. 10 (01) Justification .. 10 (02) Approval Process .. 11 EARTHWORK quantities .. 11 Computerized Computations .. 12 Manual Computations .. 12 Shrinkage and Swell Factors .. 13 Balancing .. 13 Earthwork Tabulation .. 14 Linear Grading .. 14 B Borrow .. 15 Structure Backfill [Rev.]

3 Mar 2015] .. 16 (01) Structure Backfill Types .. 16 (02) Information to be Shown on Plans .. 17 Flowable Backfill .. 17 DETERMINING PIPE BACKFILL quantities .. 18 Background Information .. 18 (01) Pipe Shape .. 18 (02) Pipe Interior Designation .. 18 (03) Backfill Method .. 18 (04) Backfill Material .. 19 Hand Calculation of Backfill quantities .. 19 (01) Circular Pipe, Earth Foundation .. 20 (02) Circular Pipe, Rock Foundation .. 21 (03) Deformed Pipe, Earth Foundation .. 22 (04) Deformed Pipe, Rock Foundation .. 23 Computer Program for Determining Backfill quantities .. 24 Video Inspection.

4 24 Page 3 2013 Indiana Design Manual, Ch. 17 Information to be Shown on Plans .. 24 ROADWAY 25 Pavement Materials .. 25 Subgrade Treatment .. 25 (01) Subgrade Treatment Types [Rev. Jan. 2011, Mar. 2014, Dec. 2017] .. 25 (02) Subgrade Treatment Type Determination .. 26 (03) Determining Pay Items and quantities .. 27 Placing Pipe Under Existing Pavement .. 27 (01) Determining the Longitudinal Pay Limits of the Pavement Replacement .. 28 (02) Determining Pavement quantities .. 28 (03) Determining Backfill quantities .. 29 (04) Determining Underdrain quantities .. 29 Subbase and Underdrains for Cement Concrete Pavement.

5 30 (01) Subbase .. 30 (02) Underdrains .. 30 Non-Standard Concrete Median Barrier .. 31 Curb Ramp and Detectable Warning Surface [Rev. Apr. 2016] .. 31 Sodded, Paved, or Riprap Ditch .. 32 (01) Sodded Ditch .. 32 (02) Paved Side Ditch .. 32 (03) Riprap-Lined Ditch .. 33 Mailbox Assembly and Mailbox Approach .. 34 Monuments [Rev. Apr. 2016] .. 34 (01) General [Rev. Apr. 2016] .. 34 (02) Section Monuments [Rev. Apr. 2016] .. 35 (03) Survey Line Control Point [Rev. Apr. 2016] .. 35 (04) INDOT Benchmark [Rev. Apr. 2016] .. 36 (05) Correcting Plans [Rev. Apr. 2016] .. 37 (06) Right-of-Way Marker.

6 37 (07) National Geodetic Survey Benchmark .. 37 (08) NGS Horizontal Control Point [Rev. Apr. 2016] .. 38 (09) United States Geological Survey Benchmark [Rev. Apr. 2016].. 38 Seeding and Sodding [Rev. May 2016] .. 38 (01) Seeding for Grading and Paving Project [Rev. May 2016, Sep. 2016] .. 38 (02) Seeding for Grading Project[Rev. May 2016, Sep. 2016] .. 39 (03) Seed Mixture Type D [Added May 2016] .. 40 (04) Seeding for Environmental Mitigation [Rev. May 2016] .. 40 Page 4 2013 Indiana Design Manual, Ch. 17 (05) Wildflower Seed Mixture .. 41 (06) Sodding .. 41 (07) Mobilization and Demobilization for Seeding.

7 42 No-Passing-Zone Pavement Markings .. 42 Spare Parts Package for Guardrail End Treatment or Impact Attenuator [Del. May 2019] .. 42 Temporary Traffic Barrier (TTB) .. 42 High-Tension Cable Barrier System (CBS) .. 43 BRIDGE quantities .. 43 Structural Concrete quantities .. 43 (01) Cast-In-Place Concrete .. 43 (02) Concrete Structural Members .. 43 (03) Surface Seal .. 43 Excavation quantities .. 44 Piling [Rev. Jan. 2011] .. 46 (01) Test Piles [Added Jan. 2011] .. 46 (02) Permanent Piles [Added Jan. 2011] .. 47 Steel Sheet Piling .. 48 Backfill for a Structure .. 48 (01) Backfill at Bridge Support.

8 48 (02) Backfill for Retaining Wall .. 49 Roadway Items .. 49 Pavement Markings .. 50 Regulatory or Warning Traffic Signs .. 50 Reinforced Concrete Bridge Approach (RCBA) [Rev. July 2012, Apr. 2016] .. 51 (01) Miscellaneous Requirements [Rev. July 2012, Apr. 2016] .. 51 (02) quantities [Rev. July 2012] .. 51 Riprap and Sodding Limits at Bridge Cone .. 52 (01) Cleaning and Painting Existing Structural Steel Members .. 52 (02) New Structural Steel Members .. 53 (03) Paint Colors .. 53 (04) quantities Determination .. 53 TEMPORARY EROSION AND SEDIMENT CONTROL [Add. Apr. 2016] .. 54 Temporary Seeding and Temporary Mulch [Rev.]

9 Apr. 2016] .. 54 Storm Water Quality Management Budget [Add. Apr. 2016].. 54 Storm Water Quality Control Plan (SWQCP) Preparation and Implementation [Add. Apr. 2016] .. 55 MATHEMATICAL FORMULAS .. 56 Page 5 2013 Indiana Design Manual, Ch. 17 FIGURES .. 57 LIST OF FIGURES Figure Title 17-1A Proprietary-Material Transmittal Memorandum [Rev. Aug. 2011] 17-1B Programmatic Approved Proprietary Materials [Deleted Apr. 2016] 17-1C Certification for Proprietary-Material Use, No Suitable Equal Exists [Add. Aug. 2011] 17-1D Certification for Proprietary-Material Use, Essential for Synchronization [Add.

10 Aug. 2011] 17-1E Public-Interest Finding for Proprietary-Material Use [Add. Aug. 2011] 17-2A Earthwork Computation Worksheet 17-2B End Area Template 17-2C Shrinkage and Swell Factors 17-2D Earthwork Balance Table (Road Project) 17-2E Earthwork Tabulation (Bridge Project) 17-3A Values Required for Determining Backfill quantities 17-4A Roadway Factors 17-4B Example Tabulation of Subgrade Treatment Information to Accompany Memorandum to Materials and Tests Division 17-4C Placing Pipe Under Existing Roadway 17-4D quantities for Curb Ramps [Rev. Apr. 2016] 17-4E Sodded Ditch quantities 17-4F Paved Side Ditches 17-4G Lug Intervals 17-4H Mailbox Summary Table 17-4 I Sodding Locations 17-5A Structure Excavations 17-5A(0) Limits of Surface Seal to be Shown on Plans 17-5B Cast-in-Place Concrete Retaining Wall Earthwork quantities Limits 17-5C MSE Retaining Wall Earthwork quantities Limits [Rev.