Example: confidence

Record of Survey and Control Monument Data

California High-Speed Train Project Agreement No.: HSR 13-06. Book 3, Part E, Subpart 3. Record of Survey and Control Monument data HSR 13-06 - EXECUTION VERSION. Revision No. Date Description 0 01 Mar 12 Initial Release, R0. 1 31 Jul 13 EXECUTION VERSION. Prepared for California High-Speed Train Project RFP No. HSR 11-16. Table of Contents Survey Control MONUMENTS SYSTEMWIDE MAP. Survey Control MONUMENTS SYSTEMWIDE data TABLES. Record OF Survey COUNTY OF MADERA (1). DRAFT Record OF Survey COUNTY OF FRESNO (2). (3). CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. (1). To be added via addendum. (2). Final Record to be added via addendum. (3). Construction Package 1, Survey Control Monument data and Tie Sheets within County of Madera to be added via addendum.

(2) Final Record to be added via addendum. (3) Construction Package 1, Survey Control Monument Data and Tie Sheetswithin County of Madera to be added via addendum .

Tags:

  Data, Control, Survey, Monument, Of survey and control monument data

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Record of Survey and Control Monument Data

1 California High-Speed Train Project Agreement No.: HSR 13-06. Book 3, Part E, Subpart 3. Record of Survey and Control Monument data HSR 13-06 - EXECUTION VERSION. Revision No. Date Description 0 01 Mar 12 Initial Release, R0. 1 31 Jul 13 EXECUTION VERSION. Prepared for California High-Speed Train Project RFP No. HSR 11-16. Table of Contents Survey Control MONUMENTS SYSTEMWIDE MAP. Survey Control MONUMENTS SYSTEMWIDE data TABLES. Record OF Survey COUNTY OF MADERA (1). DRAFT Record OF Survey COUNTY OF FRESNO (2). (3). CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. (1). To be added via addendum. (2). Final Record to be added via addendum. (3). Construction Package 1, Survey Control Monument data and Tie Sheets within County of Madera to be added via addendum.

2 HSR 13-06 - EXECUTION VERSION. Page i Record of Survey and Control Monument data CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. 1 of 28. HSR 13-06 - EXECUTION VERSION. CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. 2 of 28. HSR 13-06 - EXECUTION VERSION. CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. 3 of 28. HSR 13-06 - EXECUTION VERSION. CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. 4 of 28. HSR 13-06 - EXECUTION VERSION. CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS. 5 of 28. California High-Speed Train Project Survey Control Monument data SHEET Sheet of Designation: S180. Date: 11/17/2011. Monument Description: 2 Bronze Disk in 1 Iron Pipe in 8 Concrete Pier HSR 13-06 - EXECUTION VERSION.

3 To Reach: In the County of Madera, from the intersection of Highway 99 and Avenue 7, proceed east along Avenue 7, mile to the Monument on the left. HORIZONTAL. DATUM: NAD 83 (NSRS2007) EPOCH: Geodetic Coordinates Degrees Minutes Seconds Latitude : 36 51' N. Longitude : 119 56' W. California Coordinate System (CCS83) US Survey Feet Zone 3 Northing : Easting : Comb. Factor: Zone 4 Northing : Easting : Comb. Factor: VERTICAL. US Survey Feet Method NAVD88: Not established Levels/GPS. Vertical elevations were established from differential levels between primary Control monuments. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\MDS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 1 of 24.

4 6 of 28. California High-Speed Train Project Survey Control Monument TIE SHEET Sheet of PARTY CHIEF: DATE OF Survey : DESIGNATION: J. TERRY R. WILLIAMS 9/20/2011 S180. HSR 13-06 - EXECUTION VERSION. Station Back (+) Fore (-) Elevation Adj. Elev. Description S180 2-1/2 BRONZE DISK. RP4 5/8 REBAR LS 4430. RP3 NAIL & TAG LS 4430. RP2 5/8 REBAR LS 4430. RP1 NAIL & TAG LS 4430. S180 2-1/2 BRONZE DISK. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\TIESHEETS\MTS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 2 of 24. 7 of 28. California High-Speed Train Project Survey Control Monument data SHEET Sheet of Designation: S182P. Date: 10/19/2010. Monument Description: 2 Bronze Disk in 1 Iron Pipe in 8 Concrete Pier HSR 13-06 - EXECUTION VERSION.

5 To Reach: In the County of Fresno, City of Fresno, from the intersection of Golden State Boulevard and Kathryn Drive, southeasterly 510 feet along Kathryn Drive to the Monument , feet behind the back of walk on the southwesterly side of Kathryn Drive. HORIZONTAL. DATUM: NAD 83 (NSRS2007) EPOCH: Geodetic Coordinates Degrees Minutes Seconds Latitude : 36 50' N. Longitude : 119 55' W. California Coordinate System (CCS83) US Survey Feet Zone 3 Northing : Easting : Comb. Factor: Zone 4 Northing : Easting : Comb. Factor: VERTICAL. US Survey Feet Method NAVD88: GPS. The orthometric height was determined by two, one-hour GPS observations, using GEOID09 and CGPS ellipsoid heights. Equipment used included fixed height meter rods, Trimble 5700 receivers and matching Zephyr Geodetic antennas.

6 T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\MDS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 3 of 24. 8 of 28. California High-Speed Train Project Survey Control Monument TIE SHEET Sheet of PARTY CHIEF: DATE OF Survey : DESIGNATION: W. Hoff J. TERRY R. WILLIAMS 10/19/2010 S182P. HSR 13-06 - EXECUTION VERSION. Station Back (+) Fore (-) Elevation Adj. Elev. Description S182P 2-1/2 BRONZE DISK. RP2 5/8 REBAR LS 4430. RP1 CHISELED X . S182P 2-1/2 BRONZE DISK. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\TIESHEETS\MTS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 4 of 24. 9 of 28. California High-Speed Train Project Survey Control Monument data SHEET Sheet of Designation: S184.

7 Date: 11/17/2011. Monument Description: 2 Bronze Disk in 1 Iron Pipe in 8 Concrete Pier HSR 13-06 - EXECUTION VERSION. To Reach: In the City of Fresno, County of Fresno, from the intersection of Golden State Boulevard and Barstow Avenue, proceed westerly along Barstow Avenue, 250 feet to the Monument on the left. HORIZONTAL. DATUM: NAD 83 (NSRS2007) EPOCH: Geodetic Coordinates Degrees Minutes Seconds Latitude : 36 48' N. Longitude : 119 53' W. California Coordinate System (CCS83) US Survey Feet Zone 4 Northing : Easting : Comb. Factor: VERTICAL. US Survey Feet Method NAVD88: Levels/GPS. Vertical elevations were established from differential levels between primary Control monuments. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\MDS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 5 of 24.

8 10 of 28. California High-Speed Train Project Survey Control Monument TIE SHEET Sheet of PARTY CHIEF: DATE OF Survey : DESIGNATION: J. TERRY R. WILLIAMS 9/20/2011 S184. HSR 13-06 - EXECUTION VERSION. Station Back (+) Fore (-) Elevation Adj. Elev. Description S184 2-1/2 BRONZE DISK. RP4 NAIL & TAG LS 4430. RP3 NAIL & TAG LS 4430. RP2 NAIL & TAG LS 4430. RP1 NAIL & TAG LS 4430. S184 2-1/2 BRONZE DISK. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\TIESHEETS\MTS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 6 of 24. 11 of 28. California High-Speed Train Project Survey Control Monument data SHEET Sheet of Designation: S186. Date: 11/17/2011. Monument Description: 2 Bronze Disk in 1 Iron Pipe in 8 Concrete Pier HSR 13-06 - EXECUTION VERSION.

9 To Reach: In the City of Fresno, County of Fresno, Monument is at the northeast corner of Ashlan Avenue and Marty Avenue. HORIZONTAL. DATUM: NAD 83 (NSRS2007) EPOCH: Geodetic Coordinates Degrees Minutes Seconds Latitude : 36 47' N. Longitude : 119 51' W. California Coordinate System (CCS83) US Survey Feet Zone 4 Northing : Easting : Comb. Factor: VERTICAL. US Survey Feet Method NAVD88: Levels/GPS. Vertical elevations were established from differential levels between primary Control monuments. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\MDS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 7 of 24. 12 of 28. California High-Speed Train Project Survey Control Monument TIE SHEET Sheet of PARTY CHIEF: DATE OF Survey : DESIGNATION: J.

10 TERRY R. WILLIAMS 9/20/2011 S186. HSR 13-06 - EXECUTION VERSION. Station Back (+) Fore (-) Elevation Adj. Elev. Description S186 2-1/2 BRONZE DISK. RP4 NAIL & TAG LS 4430. RP3 NAIL & TAG LS 4430. RP2 NAIL & TAG LS 4430. RP1 NAIL & TAG LS 4430. S186 2-1/2 BRONZE DISK. T:\13259 DCAHST\SUR\DWG\CONTROL_MONUMENTS_TYPICAL \DATASHEETS\TIESHEETS\MTS CONSTRUCTION PACKAGE 1 - Survey Control Monument data AND TIE SHEETS 8 of 24. 13 of 28. California High-Speed Train Project Survey Control Monument data SHEET Sheet of Designation: S188. Date: 11/17/2011. Monument Description: 2 Bronze Disk in 1 Iron Pipe in 8 Concrete Pier HSR 13-06 - EXECUTION VERSION. To Reach: In the City of Fresno, County of Fresno, from the intersection of Weber Avenue and Clinton Avenue, 150 feet west to the Monument on the left.


Related search queries