Example: barber

RETAINING WALLSeauty - Concrib

RETAINING WALLSS trengthandBeautyADVANTAGES & FEATURES OF Concrib WALLSIf you're thinking RETAINING wallsTHINKCONCRIBEASE OF CONSTRUCTIONCONCRIB crib walls are easily and quickly erected byexperienced construction personnel. The concretecomponents can be handled by a two man are simple reinforced concrete , STRENGTH AND SAFETYThe three dimensional grid structure of the concreteelements and the use of free-draining infill materialeliminates two common causes of RETAINING wall failure,namely build up of hydrostatic pressure and thedestructive pressure of tree roots. The high strengthprecast concrete elements provide for long term durabilityand will not rot or Concrib wall can be planted with shrubs or creepersusing the spaces in the face of the wall, to blend in withany existing or proposed walls offer design flexibility and can beconstructed to follow both concave and convex curves,undulating ground and is a key word in the construction of a Concrib wall allowing for temporary RETAINING walls, due to theability to dismantle and re-erect components as construction is required in stages, due to finance,weather or other factors, our walls are ideal as there is nopermanent connection between components, allowingsectio

COMPONENTS The table below shows profiles of CONCRIB high strength, high quality, reinforced concrete components, consisting of headers, stretchers, back stretchers

Tags:

  Stretcher

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of RETAINING WALLSeauty - Concrib

1 RETAINING WALLSS trengthandBeautyADVANTAGES & FEATURES OF Concrib WALLSIf you're thinking RETAINING wallsTHINKCONCRIBEASE OF CONSTRUCTIONCONCRIB crib walls are easily and quickly erected byexperienced construction personnel. The concretecomponents can be handled by a two man are simple reinforced concrete , STRENGTH AND SAFETYThe three dimensional grid structure of the concreteelements and the use of free-draining infill materialeliminates two common causes of RETAINING wall failure,namely build up of hydrostatic pressure and thedestructive pressure of tree roots. The high strengthprecast concrete elements provide for long term durabilityand will not rot or Concrib wall can be planted with shrubs or creepersusing the spaces in the face of the wall, to blend in withany existing or proposed walls offer design flexibility and can beconstructed to follow both concave and convex curves,undulating ground and is a key word in the construction of a Concrib wall allowing for temporary RETAINING walls, due to theability to dismantle and re-erect components as construction is required in stages, due to finance,weather or other factors, our walls are ideal as there is nopermanent connection between components.

2 Allowingsections of wall to be continued when and where walls are designed as gravity RETAINING wallsusing a system of four header sizes for various wall of header sizes can be used for differentwall heights and walls even up to 20m in height can becatered performance of the Concrib system and componentshave been fully evaluated and tested by the Queensland University of Technology and a full report isavailable on of Concrib S concrete components comply with AS 3600 Concrete Structures Code and our designproposals are in accordance with AS 4678 Earth RetainingStructures. DMACRO 1300 BMIDI 700 CMAXI 1000 TYPICAL Concrib WALLSCROSS SECTIONSThe cross sections below indicate the construction configuration using thefour standard Concrib headers are for walls as follows:A. MICRO 500 - Walls up to MIDI 700 - Walls up to MAXI 1000 - Walls up to MACRO 1300 - Walls up to *The heights indicated above are given as a guide only.

3 * For walls of greater height or for extra heavyload situations different Concrib wallcombinations are possible eg A double MACRO wall can provide for extra height with wallthickness of 2350mm, a double MAXI of1750mm, or a MACRO/MAXI combination of2050mm, which are just some of thepossibilities spoon drainGeofabric separation layerBedding layerNatural groundGeofabric separation layerSuggested spoon drainEarth back fillGeofabric separation layerSuggested spoon drainGravel or suitablegranular back fillAgricultural drainGravel or suitablegranular back fillAgricultural drainBedding layerAgricultural drainGravel or suitablegranular back fillAMICRO 500 Suggested spoon drainGeofabric separation layerEarth back fillAgricultural drainNatural groundBedding layerGravel or suitablegranular back fillCOMPONENTSThe table below shows profiles of Concrib high strength, high quality, reinforced concrete components,consisting of headers, stretchers, back stretchers, closers.

4 Spacer blocks and taper HEADER 20 MIDI HEADER 27 MAXI HEADER 40 MACRO HEADER 53 stretcher 61 CLOSER 46 BACK stretcher 38 SPACER BLOCK HAND TAPER 35 LEFT HAND TAPER 35 DISCLAIMER - NOTE:- All design information in this brochure is offered as a guide to the types of walls required, howeverthe walls are an engineering structure and it is strongly recommended that the user employs a qualified design engineerfamiliar with your site conditions for the final design and application of a Concrib measurements in millimetresPhone (07)3375 1800 Fax: (07) 3375 1777601 Boundary Road, Richlands Qld 4077 Email: Internet: ART (07) 3375 1868 SPECIFICATION Concrib SEGMENTAL RETAINING CRIBWALL EARTH RETAINING STRUCTURES Copyright Concrib Pty Ltd, 2004 For Information Only April 2004 Concrib Segmental RETAINING Walls For Information Only April 2004 Page 2 of 12 CONTENTS SCOPE OF WORKS.

5 RELEVANT STANDARDS OR QUALITY DELIVERIES, STORAGE AND 2 MATERIALS .. STRETCHERS, HEADERS, TAPERS, SPACER BLOCKS, CLOSERS, BACK STRETCHERS AND FALSE CRIBWALL GEOTEXTILE 3 Concrib DESIGN USE OF DESIGN STRUCTURE CRIBWALL LOADS ON RETAINED SLOPE GEOMETRY AND SOIL FOUNDATION MATERIAL DRAINAGE OTHER DESIGN 4 CONSTRUCTION .. FOUNDATION PREPARATION AND EXISTING FILL - TEMPORARY CRIBWALL CONSTRUCTION AS BUILT CONSTRUCTION FIELD QUALITY 5 MEASUREMENTS AND PAYMENT .. Concrib Segmental RETAINING Walls For Information Only April 2004 Page 3 of 12 SCOPE OF WORKS A Concrib reinforced concrete segmental crib RETAINING wall shall consist of MICRO, MIDI, MAXI and MACRO headers, stretchers, spacer blocks, closers, back stretchers and/or left and right hand tapers all combined to create a gravity earth RETAINING structure.

6 Extent The work to be executed under this specification is the design, supply of all materials, plant and labour for the construction of a Concrib cribwall and associated works as indicated in the specification and on the drawings and to the entire satisfaction of the superintendent. Responsibilities The wall installation subcontractor shall be responsible for carrying out the installation of the Concrib RETAINING walls in accordance with the specification and associated contract documents. The subcontractor shall be suitably qualified and experienced. Relevant Standards or Specifications Wherever reference is made to Standards Association of Australia the requirements of the editions and amendments shall apply to the relevant materials or operations and be deemed to be incorporated in this specification. The following standards or specifications listed are applicable to this type of work: Design & Materials 1.

7 AS4678 :2002 Earth RETAINING Structures 2. AS3600 :2001 Concrete Structures 3. AS4671:2001 Steel Reinforcing Materials 4. AS1726:1993 Geotechnical Site Investigations General Terms used in this specification shall have the meanings assigned to them as follows: Approved shall mean approved in writing by the project engineer. Or equally approved shall mean equivalent in performance, quality and price to that specified and approved by the project engineer. Where limits to the assumed soil parameters of soils are defined elsewhere herein these properties shall be determined in accordance with test method outlined in AS1289 (Refer Section of this specification).

8 The term construction area in this Part shall be defined as an area to be excavated or an area to be defined as used by the wall installation subcontractor to erect RETAINING wall. Regulations The wall installation subcontractor shall comply with all relevant Acts, Regulations and By-Laws in respect of all work specified herein, including safety rail systems, strutting, guard rails and all safety measures to be adopted in accordance with safe work practices. Concrib Segmental RETAINING Walls For Information Only April 2004 Page 4 of 12 Submittals/Certification Submittals shall include: 1. Manufacturer s certification, prior to start of construction, that the RETAINING wall system components meet the requirements of this specification and the structural design shall meet minimum requirements for structural stability of the wall.

9 2. Design for the RETAINING wall system prepared and stamped by a Certified Professional Engineer registered in the state of the project. Engineer to have minimum 5 years experience in this design technology. The engineering designs, techniques and materials evaluations shall be in accordance with AS4678. Global stability is the responsibility of the project engineer in conjunction with the project geotechnical engineer. 3. Construction Issue drawings including notes and design assumptions, wall elevations, design cross-section wall heights, header and stretcher layout, standard details, surface and subsurface drainage provisions and construction recommendations. 4. Samples Manufacturer s certification and test reports stating that the materials meet those requirements stipulated in Section 2 of this specification. Cribwall components shall meet requirements of testing carried out by Queensland University of Technology Report 92 entitled :The Design & Performance Measures Segmental Concrete Crib RETAINING Walls.

10 5. Geotechnical certification shall be carried out by a suitably qualified and experienced geotechnical engineer. The following items shall be confirmed/certified prior to start of final design and/or before start of construction: Bearing capacity of foundation meets design requirements as shown on project construction drawings Surface and subsurface drainage. Soil shear strength parameters (effective friction angle, cohesion and bulk density) for the retained and foundation materials. Quality Assurance Contractor shall submit certification, prior to start of work, that the proposed cribwall system : has been successfully utilized on a minimum of five (5) similar projects, , height, , loadings, and has been successfully installed on a minimum of two thousand (2,000) square meters of RETAINING walls. The walls shall be designed by a suitably qualified engineer having a minimum of five-years documentable experience in the design of earth RETAINING structures.


Related search queries