Romfor International Ltd. - Contract Drilling

Romfor International AND SLIPDRILLING LINECUT AND SLIPDRILLING LINECUT AND SLIP Drilling LINEB ackup HandBackup HandRomfor International AND SLIPDRILLING LINECUT AND SLIPDRILLING LINEB ackup HandBackup HandRomfor International Hand STEP SUB PROCEDURE REMARKSBACKUP HANDDRILLING LINECUT AND SLIP Drilling LINE1 PPE Requirements - Hardhat, Safety Glasses, FullFace Shield, Work Gloves, Steel Toe Shoes, BackSupport and Fall rig specific JSA s on cutting and slippingdrilling line and hoisting Equipment:Anti-Fall equipment, block hanging line, bosun schair, shackles ,block slings, line cutter and handtools used for the TO HANG BLOCKS(Assuming drill pipe is in rotary table)Drill String should be positioned at bottom of lastcasing string and well that well bore is in setting slips (with drill string at proper height).

Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS BACKUP HAND DRILLING LINE CUT AND SLIP DRILLING LINE 1 PPE Requirements - Hardhat, Safety Glasses, Full

Tags:

  International, Drilling, Romfor, Romfor international ltd

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Romfor International Ltd. - Contract Drilling

1 Romfor International AND SLIPDRILLING LINECUT AND SLIPDRILLING LINECUT AND SLIP Drilling LINEB ackup HandBackup HandRomfor International AND SLIPDRILLING LINECUT AND SLIPDRILLING LINEB ackup HandBackup HandRomfor International Hand STEP SUB PROCEDURE REMARKSBACKUP HANDDRILLING LINECUT AND SLIP Drilling LINE1 PPE Requirements - Hardhat, Safety Glasses, FullFace Shield, Work Gloves, Steel Toe Shoes, BackSupport and Fall rig specific JSA s on cutting and slippingdrilling line and hoisting Equipment:Anti-Fall equipment, block hanging line, bosun schair, shackles ,block slings, line cutter and handtools used for the TO HANG BLOCKS(Assuming drill pipe is in rotary table)Drill String should be positioned at bottom of lastcasing string and well that well bore is in setting slips (with drill string at proper height).

2 After blocks are lowered, stand clear while elevatorsare as directed in inspecting Drilling line, whileDriller is raising blocks are raised to proper position, assist inusing air / hydraulic hoist for installing safety as directed in tightening drill pipe safety valveto the proper make up torque (do not put tongs onopen / close area of drill pipe safety valve).Stand clear while blocks are moved to the properposition for installation of block hanging Derrickman, in attaching harness / bosun schair to air / hydraulic s should be rig manager is required on thefloor when using bosun s fall protection, 100% tie offand avoid pinch issues maychange position of drill that proper liftingtechniques are pinch points and stay outof Drillers hands clear while line isspooling on full open lifting eye forhoisting safety pinch points and ensurefloor is clear of trip safety valve is in theopen position.

3 Stay out of thered zone (between rig tongs).Ensure brake handle is lockeddown after positioning directly to STEP SUB PROCEDURE REMARKSB ackup HandBACKUP HANDDRILLING LINECUT AND SLIP Drilling LINER omfor International tag line is attached to bosun s Derrickman is lifted, use tag line to positionDerrickman Derrickman is lowered, use tag line to positionDerrickman in removing air / hydraulic winch from harness/ bosun s chair and store for later with removal of guards from front with removal of automatic driller / weightindicator load cells off dead with removal of secondary safety clamp anddrilling line anchor in securing tag line to Drilling line, use tag lineto pull initial Drilling line from in taping Drilling line area being in placing Drilling line in line cutter Drilling line is secured prior to cutting, toavoid any recoil in TO CUT Drilling LINEA ssist in cutting Drilling line.

4 Operate cutter from theproper side (closed/pump side).Assist in storing cutter in pulling Drilling line off drum and guide lineout V-door / beaver tag line is manned byqualified Derrickman s feet andhands are clear of catch Derrickman s feet andhands are clear of catch pinch points and storeguards in safe pinch points; ensure100% tie off. Use proper pinch points; ensure100% tie off. Use proper pinch for burs / for burs / wickers, coverline proper PPE, Full-faceshield and avoid pinch pinch for burs / wickers andavoid pinch points. Do not letdrilling line slide through International Hand STEP SUB PROCEDURE REMARKSBACKUP HANDDRILLING LINECUT AND SLIP Drilling LINE3 Assist in attaching air/hydraulic hoist to Drilling linewhen there is three wraps left on in pulling remaining Drilling line off drum withair / hydraulic with proper removal of Drilling line clamp andinspect for in removing the remainder of Drilling line fromdrum using air/hydraulic in lowering cut off Drilling line down beaver-slide / V door and store properly for in Installation of Drilling line in clear while drum rotates forward to

5 Properposition for installation of Drilling line in installation of Drilling line in attaching snatch block to fast line and raisewith air / hydraulic hoist to keep proper tension ondrilling line while spooling Drilling line on with removal of snatch block and air / hydrau-lic line is slipping through anchor adequate communications from rig floor todrilling line stand / anchor area (use mechanicalassist to feed line off of Drilling line spool).Watch for burs / wickers andavoid pinch for burs / wickers andavoid pinch for burs / wicker s andavoid pinch points. Use properhand tools to remove for overhead for burs / wickers andavoid pinch points.

6 Use tag for overhead for burs / wickers andavoid pinch points. Use tag pinch points and useproper brake handle is lockeddown. Watch for burs / wickersand avoid pinch points. Useproper hand tools to for overhead for burs / wickers andavoid pinch for overhead for burs / wickers andavoid pinch for overhead for burs / wickers andavoid pinch STEP SUB PROCEDURE REMARKSB ackup HandBACKUP HANDDRILLING LINECUT AND SLIP Drilling LINER omfor International in installing Drilling line anchor clamp andsecondary anchor safety clear while blocks are raised to proper heightfor removal of block hanging Derrickman, in attaching harness / bosun schair to air/hydraulic tag line is attached to bosun s Derrickman is being lifted to proper position.

7 Pay attention to hand signals and verbal directionfrom the block hanging line is disconnected from topof the blocks and placed in stored in lowering Derrickman to proper position,paying attention to hand signals and verbal in removing air / hydraulic winch from harness/ bosun s chair and store with removal of drill pipe safety valve. Lift drillpipe safety valve with air / hydraulic Driller in checking crown-o-matic for propersetting on first stand of OF PROCEDUREI nspect all clamping devices onanchor (brass inserts, anchorbolts and nuts) tighten toproper torque in sequence (usetorque wrench). After initial tripin re-torque anchor directly to tag line is manned byqualified Derrickmans feet andhands are clear of catch line on air / hydraulicwinch properly to verbal Derrickman s feet andhands are clear of catch under Rig pinch points and ensurefloor is clear of trip safety valve is in theopen position.

8 Stay out of thered zone (between rig tongs).Use full open lifting eye forhoisting safety International AND SLIPDRILLING LINECUT AND SLIPDRILLING LINECUT AND SLIP Drilling LINED errickmanDerrickmanRomfor International AND SLIPDRILLING LINECUT AND SLIPDRILLING LINED errickmanDerrickmanRomfor Internatinal STEP SUB PROCEDURE REMARKSDERRICKMANDRILLING LINECUT AND SLIP Drilling Requirements Hardhat, Safety Glasses, FullFace Shield, Work Gloves, Steel Toe Shoes, BackSupport and Fall rig specific JSA s on cutting and slippingdrilling line and hoisting Equipment:Anti-Fall equipment, block hanging line, bosun schair, shackles ,block slings, line cutter and handtools used for the TO HANG BLOCKS(Assuming drill pipe is in rotary table)

9 Drill String should be positioned at bottom of lastcasing string and well Driller to ensure that well bore is as directed in inspecting Drilling line, whileDriller is raising to secure hanging line to top of proper tools for and put on proper size lifting harness /bosun s harness / bosun s chair to air/hydraulic tag line is attached to bosun s hoist operator to lift to proper position, usehand signals and verbal block hanging line from stored s should be rig manager is required on thefloor when using bosun s fall protection, 100% tie offand avoid pinch Rig Manager thatpersonnel will be lifted by air/hydraulic hoist and that drillline is ready to be issues maychange position of drill hands clear while line isspooling on should be 100% tied proper lifting device.

10 Use100% tie off (refer to JSA onlifting personnel with air/hydraulic hoist).Attach directly to tag line is manned byqualified feet and hands clear ofcatch STEP SUB PROCEDURE REMARKSD errickmanDERRICKMANDRILLING LINECUT AND SLIP Drilling LINER omfor International block-hanging line to top of hoist operator to lower to proper position, usehand signals and verbal harness / bosun s chair and store for with proper removal of guards from front with proper removal of automatic Driller/weight indicator load cells off dead clear while blocks are lowered slowly (hang-ing line takes full weight of blocks).