Transcription of Romfor International Ltd. - Contract Drilling
1 Romfor International Ltd. Backup Hand CUT AND SLIP. Drilling LINE. CUT AND SLIP Drilling LINE. Romfor International Ltd. Backup Hand CUT AND SLIP. Drilling LINE. Romfor International Ltd. Backup Hand CUT AND SLIP Drilling LINE. BACKUP HAND Drilling LINE. STEP SUB PROCEDURE REMARKS. 0 1 PPE Requirements - Hardhat, Safety Glasses, Full Face Shield, Work Gloves, Steel Toe Shoes, Back Support and Fall Protection. 2 Review rig specific JSA's on cutting and slipping JSA's should be rig specific. Drilling line and hoisting personnel. Rig manager is required on the floor when using bosun's chair. 1 Inspect Equipment: Use fall protection, 100% tie off Anti-Fall equipment, block hanging line, bosun's and avoid pinch points. chair, shackles ,block slings, line cutter and hand tools used for the job. READY TO HANG BLOCKS. (Assuming drill pipe is in rotary table). Drill String should be positioned at bottom of last Operational issues may casing string and well secured.
2 Change position of drill string. 2 Ensure that well bore is static. 3 Assist in setting slips (with drill string at proper height). Ensure that proper lifting techniques are used. 4 After blocks are lowered, stand clear while elevators Avoid pinch points and stay out are unlatched. of Drillers view. 5 Assist as directed in inspecting Drilling line, while Keep hands clear while line is Driller is raising blocks. spooling on drum. 6 After blocks are raised to proper position, assist in Use full open lifting eye for using air / hydraulic hoist for installing safety valve. hoisting safety valve. 7 Assist as directed in tightening drill pipe safety valve Avoid pinch points and ensure to the proper make up torque (do not put tongs on floor is clear of trip hazards. open / close area of drill pipe safety valve). Ensure safety valve is in the open position. Stay out of the red zone (between rig tongs). 8 Stand clear while blocks are moved to the proper Ensure brake handle is locked position for installation of block hanging line.
3 Down after positioning blocks. 9 Assist Derrickman, in attaching harness / bosun's Attach directly to shackle. chair to air / hydraulic hoist. 1. Romfor International Ltd. Backup Hand CUT AND SLIP Drilling LINE. BACKUP HAND Drilling LINE. STEP SUB PROCEDURE REMARKS. 10 Ensure tag line is attached to bosun's chair. Ensure tag line is manned by qualified person. 11 While Derrickman is lifted, use tag line to position Ensure Derrickman's feet and Derrickman properly. hands are clear of catch points. 12 While Derrickman is lowered, use tag line to position Ensure Derrickman's feet and Derrickman properly. hands are clear of catch points. 13 Assist in removing air / hydraulic winch from harness / bosun's chair and store for later use. 14 1 Assist with removal of guards from front of Avoid pinch points and store drawworks. guards in safe position. 2 Assist with removal of automatic driller / weight Avoid pinch points; ensure indicator load cells off dead line.
4 100% tie off. Use proper hand tools. 15 Assist with removal of secondary safety clamp and Avoid pinch points; ensure Drilling line anchor clamp. 100% tie off. Use proper hand tools. 16 Assist in securing tag line to Drilling line, use tag line Avoid pinch points. to pull initial Drilling line from drum. 17 Assist in taping Drilling line area being cut. Watch for burs / wickers. 18 Assist in placing Drilling line in line cutter properly. Watch for burs / wickers, cover line cutter. 19 Ensure Drilling line is secured prior to cutting, to avoid any recoil in line. READY TO CUT Drilling LINE. 20 Assist in cutting Drilling line, operate cutter from the Use proper PPE, Full-face proper side (closed/pump side). shield and avoid pinch points. 21 Assist in storing cutter properly. Avoid pinch points. 22 Assist in pulling Drilling line off drum and guide line Watch for burs / wickers and out V-door / beaver slide. avoid pinch points.
5 Do not let Drilling line slide through hands. 2. Romfor International Ltd. Backup Hand CUT AND SLIP Drilling LINE. BACKUP HAND Drilling LINE. STEP SUB PROCEDURE REMARKS. 23 1 Assist in attaching air/hydraulic hoist to Drilling line Watch for burs / wickers and when there is three wraps left on drum. avoid pinch points. 2 Assist in pulling remaining Drilling line off drum with Watch for burs / wickers and air / hydraulic hoist. avoid pinch points. 24 Assist with proper removal of Drilling line clamp and Watch for burs / wicker's and inspect for wear. avoid pinch points. Use proper hand tools to remove clamp. 25 Assist in removing the remainder of Drilling line from Watch for overhead loads. drum using air/hydraulic hoist. Watch for burs / wickers and avoid pinch points. Use tag line. 26 Assist in lowering cut off Drilling line down beaver- Watch for overhead loads. slide / V door and store properly for disposal.
6 Watch for burs / wickers and avoid pinch points. Use tag line. 27 Assist in Installation of Drilling line in drum. Avoid pinch points and use proper tools. 28 Stand clear while drum rotates forward to proper position for installation of Drilling line clamp. 29 Assist in installation of Drilling line clamp. Ensure brake handle is locked down. Watch for burs / wickers and avoid pinch points. Use proper hand tools to install clamp. 30 Assist in attaching snatch block to fast line and raise Watch for overhead loads. with air / hydraulic hoist to keep proper tension on Watch for burs / wickers and Drilling line while spooling Drilling line on drum. avoid pinch points. 31 Assist with removal of snatch block and air / hydrau- Watch for overhead loads. lic hoist. Watch for burs / wickers and avoid pinch points. 32 Ensure line is slipping through anchor properly. Watch for overhead loads. Have adequate communications from rig floor to Watch for burs / wickers and Drilling line stand / anchor area (use mechanical avoid pinch points.)
7 Assist to feed line off of Drilling line spool). 3. Romfor International Ltd. Backup Hand CUT AND SLIP Drilling LINE. BACKUP HAND Drilling LINE. STEP SUB PROCEDURE REMARKS. 33 Assist in installing Drilling line anchor clamp and Inspect all clamping devices on secondary anchor safety clamp. anchor (brass inserts, anchor bolts and nuts) tighten to proper torque in sequence (use torque wrench). After initial trip in re-torque anchor clamping device. 34 Stand clear while blocks are raised to proper height for removal of block hanging line. 35 Assist Derrickman, in attaching harness / bosun's Attach directly to shackle. chair to air/hydraulic hoist. 36 Ensure tag line is attached to bosun's chair. Ensure tag line is manned by qualified personnel. 37 While Derrickman is being lifted to proper position, Ensure Derrickmans feet and pay attention to hand signals and verbal direction hands are clear of catch points.
8 From the Derrickman. Spool line on air / hydraulic winch properly to prevent fouling. 38 Ensure block hanging line is disconnected from top Use verbal communication. of the blocks and placed in stored position. 39 Assist in lowering Derrickman to proper position, Ensure Derrickman's feet and paying attention to hand signals and verbal direction. hands are clear of catch points. 40 Assist in removing air / hydraulic winch from harness Store under Rig Managers / bosun's chair and store properly. control. 41 Assist with removal of drill pipe safety valve. Lift drill Avoid pinch points and ensure pipe safety valve with air / hydraulic hoist. floor is clear of trip hazards. Ensure safety valve is in the open position. Stay out of the red zone (between rig tongs). Use full open lifting eye for hoisting safety valve. 42 Assist Driller in checking crown-o-matic for proper setting on first stand of tubulars. END OF PROCEDURE.
9 4. Romfor International Ltd. Derrickman CUT AND SLIP. Drilling LINE. CUT AND SLIP Drilling LINE. Romfor International Ltd. Derrickman CUT AND SLIP. Drilling LINE. Romfor Internatinal Ltd. Derrickman CUT AND SLIP Drilling LINE. DERRICKMAN Drilling LINE. STEP SUB PROCEDURE REMARKS. 0 1 PPE Requirements Hardhat, Safety Glasses, Full Face Shield, Work Gloves, Steel Toe Shoes, Back Support and Fall Protection. 2 Review rig specific JSA's on cutting and slipping JSA's should be rig specific. Drilling line and hoisting personnel. Rig manager is required on the floor when using bosun's chair. 1 Inspect Equipment: Use fall protection, 100% tie off Anti-Fall equipment, block hanging line, bosun's and avoid pinch points. chair, shackles ,block slings, line cutter and hand tools used for the job. Notify Rig Manager that READY TO HANG BLOCKS personnel will be lifted by air/. (Assuming drill pipe is in rotary table) hydraulic hoist and that drill line is ready to be cut.
10 Drill String should be positioned at bottom of last Operational issues may casing string and well secured. change position of drill string. 2 Assist Driller to ensure that well bore is static. 3 Assist as directed in inspecting Drilling line, while Keep hands clear while line is Driller is raising blocks. spooling on drum. 4 1 Prepare to secure hanging line to top of blocks. 2 Locate proper tools for job. Tools should be 100% tied off. 3 Inspect and put on proper size lifting harness / Use proper lifting device. Use bosun's chair. 100% tie off (refer to JSA on lifting personnel with air/. hydraulic hoist). 4 Attach harness / bosun's chair to air/hydraulic hoist. Attach directly to shackle. 5 Ensure tag line is attached to bosun's chair. Ensure tag line is manned by qualified person. 6 Direct hoist operator to lift to proper position, use Keep feet and hands clear of hand signals and verbal direction. catch points.