Fields Roof Systems Manual (253) or (800) 627-4098 Flashing Details IndexFD01 Interior Roof Drain DetailFD02 Interior Drain with Gravel Stop DetailFD03 Scupper Roof Drain DetailFD04 Gutter Roof Drain DetailFD05 Roof-Top Equipment Curb DetailFD06 Roof-Top Metal Air Shaft Curb DetailFD07 Roof-Top Wood Air Shaft Curb DetailFD08 Roof Skylight DetailFD09 Roof-Top Chimney Pipe DetailFD10 Roof-Top Plumbing Vent Pipe DetailFD11 Sheet Metal Pipe Enclosure DetailFD12 Roof-Top Pipe Roller Support DetailFD13 Structural Roof Deck Penetration DetailFD14 Metal Covered Expansion Joint DetailFD15 Premanufactured Expansion Joint DetailFD16 Roof Area Divider DetailFD17 Raised Metal Roof Edge DetailFD18 Gravel Stop Metal Roof Edge DetailFD19 Post Supported Roof Deck Flashing DetailFD20 Wall

Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com A 30” sq min, 1 1/2 lb to 4 lb lead, or 16 oz copper flashing adhered onto finished roof with M300 RubrMastic.

Tags:

  9408

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Roof Flashing Details Index - fieldscorp.com

1 Fields Roof Systems Manual (253) or (800) 627-4098 Flashing Details IndexFD01 Interior Roof Drain DetailFD02 Interior Drain with Gravel Stop DetailFD03 Scupper Roof Drain DetailFD04 Gutter Roof Drain DetailFD05 Roof-Top Equipment Curb DetailFD06 Roof-Top Metal Air Shaft Curb DetailFD07 Roof-Top Wood Air Shaft Curb DetailFD08 Roof Skylight DetailFD09 Roof-Top Chimney Pipe DetailFD10 Roof-Top Plumbing Vent Pipe DetailFD11 Sheet Metal Pipe Enclosure DetailFD12 Roof-Top Pipe Roller Support DetailFD13 Structural Roof Deck Penetration DetailFD14 Metal Covered Expansion Joint DetailFD15 Premanufactured Expansion Joint DetailFD16 Roof Area Divider DetailFD17 Raised Metal Roof Edge DetailFD18 Gravel Stop Metal Roof Edge DetailFD19 Post Supported Roof Deck Flashing DetailFD20 Wall

2 Supported Roof Deck Flashing DetailFD21 Concrete Wall Counterflashing DetailFD22 Metal Wall Cap Flashing Detail2345678910111213141516171819202122 23 Fields Roof Systems Manual (253) or (800) 627-4098 Interior Roof Drain deck sump pans are 1 dead level asphalt is prohibited in the drainsump strainerM60 RubrPoly Flashing sheetsCoverboard insulationThermal insulationClamping ringDrain strainerDrain bowlDeck clampTapered insulationFields roof membrane sheets, metalflashing, & M60 RubrPoly flashingsheets all under clamping ringRoof deckThermal insulationCoverboard insulationA 30 sq min, lb to 4 lb lead, or 16 oz copper Flashing adheredonto finished roof with M300 RubrMastic. Prime top surface ofmetal Flashing with M400 RubrPrime and install M60 RubrPolyflashing sheetsSide ViewRoof deckTapered insulationClamping ringDeck clampDrain bowlFields roof membrane sheets, metal Flashing , & M60 RubrPoly Flashing sheets all under clamping ringFields M300 RubrMasticFields roof membrane sheetsM60 RubrPolyflashing sheetsFields roofmembrane sheetsA 30 sq min, lb to 4 lb lead, or 16 oz copper flashingadhered onto finished roof with M300 RubrMastic.

3 Primetop surface of metal Flashing with M400 RubrPrime andinstall M60 RubrPoly Flashing sheetsFields Roof Systems Manual (253) or (800) 627-4098 30 sq min, 1 1/2 lb to 4 lb lead, or 16 oz copper Flashing adhered ontofinished roof with M300 RubrMastic. Prime top surface of metal flashingwith M400 RubrPrime and install M60 RubrPoly Flashing sheetsA 1 x 4 sheet metalgravel stop, 36 sq minadhered in place withM300 RubrMasticM60 RubrPolyflashing sheetsA 30 sq min, 1 1/2 lb to 4 lb lead, or 16 oz copperflashing adhered onto finished roof with M300 RubrMastic. Prime top surface of metal flashingwith M400 RubrPrime and install M60 RubrPolyflashing sheetsA 1 x 4 sheet metal gravel stop, 36 sq minadhered in place with M300 RubrMasticM60 RubrPolyflashing sheets4 ThermalinsulationCoverboardinsulationRoo f deckTapered insulationClamping ringDeck clampDrain bowlFields roof membrane sheets, metal Flashing , & M60 RubrPoly Flashing sheets all under clamping ringM300 RubrMasticFields roof membrane sheetsFD02 Interior Drain with Gravel Stop deck sump pans are 1 dead level asphalt is prohibited in thedrain sump RubrPolyflashing sheetsFields roofmembrane sheetsSide ViewDrain strainerM60 RubrPoly Flashing sheetsTapered insulationFields roof membrane sheets, metalflashing.

4 & M60 RubrPoly flashingsheets all under clamping ringRoof deckThermal insulationCoverboard insulationClamping ringDrain strainerDrain bowlDeck clampFields Roof Systems Manual (253) or (800) 627-4098 Scupper Roof Drain detail shall be installed only where the deck issupported by the outside detail may be adapted to roof edges as shown inInterior Roof Drain Detail surfaces shall be sloped for positive wood nailer to wall with suitable blocking shall be slotted for venting wet opening through roof edge shall be 2 or domed, capped, & gasketedfasteners 18 oc, depending upon windzone and local conditionsSee Raised Metal Roof Edge Detail FD17 for sheet metal fascia counterflashing4 min4 min2 minM60 RubrPolyenvelope sheetTreated wood nailersM60 RubrPoly sheet extendedbelow blockingSlope to the drainM60 RubrPoly Flashing sheetsScupper fastened to blocking with fasteners 3 oc &staggered.

5 Flange adhered into M300 RubrMastic &primed with M400 RubrPrime before installing M60 RubrPoly Flashing sheetsFields roof membrane sheetsCoverboard insulationThermal insulationRoof deckRoof deckM60 RubrPoly envelope sheetM60 RubrPoly sheet extended belowblockingSheet metal scupperA .75 x 3 min L shaped gravel guardsecured to the scupperflange & notched topermit drainageSealantSee Raised Metal Edge Detail FD17 forsheet metal fascia counterflashingScupper fastened to blocking withfasteners 3 oc & staggered. Flangeadhered into M300 RubrMastic &primed with M400 RubrPrime beforeinstalling M60 RubrPoly Flashing sheetsM60 RubrPoly Flashing sheetsBead of sealentSheet metal scupperA .75 x 3 min L shapedgravel guard secured to thescupper flange & notched topermit drainageSheet metalconductor headSide ViewSheet metalconductor roof membranesheetsCoverboard insulationsloped to the drainThermal insulationFields Roof Systems Manual (253) or (800)

6 627-4098 Gutter Roof Drain DetailM60 RubrPolyenvelope sheetM60 RubrPoly Flashing sheetsFasteners 3 oc & staggeredGutter spacers alternately spaced frombracketsM60 RubrPoly flexible sheet closure intogutterContinuous cleatGutter brackets supported 12 to 36 ocdepending upon conditionsSheet metal gutterTurn downFlange adhered into M300 RubrMasticRoof deckWood nailersContinuous sheet metal closurefastened 18 ocM60 RubrPoly sheet extended tooverlay metal closureSheet metal edge Flashing with gravel stop primed with M400 RubrPrime beforeinstalling M60 RubrPoly Flashing sheetsFields roof membrane climates where the winter temperatureremains below freezing for extended periods oftime, install Raised Metal Roof Edge DetailFD17 and interior drains, or through curbscuppers to drain the brackets are required to be at least onegauge heavier than gutter wood nailer to wall or deck with expansion joints shall be installed atappropriate intervals commensurate with the typeof RubrPoly flashingsheetsM60 RubrPoly flexiblesheet closure into gutterM60 RubrPoly envelopesheetFasteners 3 oc staggeredFields roof membranesheetsSheet metal edge Flashing with gravelstop lip.

7 Flange primed with M400 RubrPrime before installing M60 RubrPoly Flashing sheetsContinuous cleatGutter spacers alternatelyspaced from bracketsTurn downM60 RubrPoly sheet extended tooverlay metal closureRoof deckWood nailersSheet metal gutterSide ViewGutter brackets supported 12 to36 oc depending upon conditionsContinuous sheet metal closurefastened 18 ocFields Roof Systems Manual (253) or (800) 627-4098 Roof-Top Equipment Curb detail allows for roof maintenance aroundsupported equipment. The continuous supportdesign shall be installed in light weight struc-tural systems so as to distribute the equipmentweight across two or more structural supportmembers. A min of 2 of horizontal clearanceshall be provided for removal and replacementof roofing and Flashing between parallel sup-ports.

8 A min of 3 of vertical clearance fromroof surface to bottom of supported equipmentshall be wood nailer to deck with suitable metal cover with receiverfor counterflashingInstall bolts into sealantNeoprene padRemovable sheet metal counterflashingHigh domed, capped, & gasketed fasteners 18 oc,depending upon wind zone and local conditionsFasteners 8 ocFields roof membrane sheets extended 2 min abovetop of cantWood cant fastened to wood nailersM60 RubrPoly Flashing sheets extended to a minheight of 8 Fields roof membrane sheetsCoverboard insulationThermal insulationRoof deck10 nominalflashing heightWood curbWood nailersSheet metal cover with receiver forcounterflashingHigh domed, capped, & gasketedfasteners 18 oc, depending uponwind zone and local conditionsRemovable sheet metalcounterflashingFasteners 8 ocFields roof membrane sheetsextended 2 min above top of cantM60 RubrPoly Flashing sheetsextended to a min height of 8 Install bolts into sealantNoeprene pad10 nominalflashing heightFields roof membrane sheetsCoverboard insulationThermal insulationRoof deckWood curbWood nailersWood cant fastened towood nailersSide ViewFields Roof Systems Manual (253) or (800)

9 627-4098 Roof-Top Metal Air Shaft Curb top wood nailer of the curb & the seal stripshall be supplied by the curb the treated wood nailer to deck withsuitable units shall be installed after the roofmembrane and flashings have been metal Flashing receiverMin of 2 high domed, capped, & gasketedfasteners 18 oc per side, depending upon wind zone andlocal conditionsRemovable sheet metal counterflashingFasteners 8 ocFields roof membrane sheets extended 2 min above top ofcantM60 RubrPoly Flashing sheets extended to a min height of8 Fields roof membrane sheetsCoverboard insulationThermal insulationRoof deckAlternate curbbearing locationfor heavy weightloading conditions10 nominalflashing heightWood nailerEquipment mounting curbSealing materialSheet metal Flashing receiverInstall a min of 2 high domed,capped, & gasketed fasteners18 oc per side, depending uponwind zone and local conditionsRemovable sheet metalcounterflashingFasteners 8 ocFields roof membrane sheetsextended a min of 2 above topof cant.

10 Not shown for clarityM60 RubrPoly Flashing sheetsextended to a min height of 8 Fields roof membrane sheetsCoverboard insulationThermal insulationRoof deckAlternate curb bearinglocation for heavyweight loading conditions10 nominalflashing heightEquipment mounting curbSealing materialWood nailerEquipmentBase of unit shall min beyond top of curbSealing material shall becontinous on top of the curb1 min below top of curbFlashing receiverFastenersWood nailerCounterflashingM60 RubrPoly flashingsheetsEquipment mounting curbInsulationSide ViewFields Roof Systems Manual (253) or (800) 627-4098 Roof-Top Wood Air Shaft Curb wood nailer to the deck with equipment shall be set after the roofmembrane and flashings have been materialWood curbSheet metal Flashing receiverMin of 2 high domed, capped, & gasketed fasteners 18 oc per side.