Transcription of Safe work method statement for demolition work
1 SAFE work method . statement FOR. demolition work . SAFEWORK NSW. CONTENTS. Sample safe work method statement demolition work 3. Recommended steps for completing a safe work method statement 3. Hierarchy of controls 3. Safe work method statement compliance (information, monitoring and review) 4. Safe work method statement demolition work application form 7. 2. SAMPLE SAFE work method statement . demolition work . A safe work method statement (SWMS) must be Under What are the hazards and the risks?', list the prepared by the persons conducting businesses hazards and risks relating to the identified HRCW.
2 Or undertakings (PCBUs) for any identified high Under What are the control measures?', identify risk construction work (HRCW) in relation to all the appropriate control measure(s) by working construction work , irrespective of the cost of through the hierarchy of controls (see below). that work . It is important that you are able to justify why the A PCBU must eliminate or, where it is not selected measure offers the highest reasonably reasonably practicable, control the risks associated practicable risk control. with construction work ' in line with the hierarchy of controls'. A PCBU must monitor and, where required, review these risk control measures, HIERARCHY OF CONTROLS.
3 Especially when workplace specific circumstances Eliminate any risk to health or safety associated change. The SWMS documents the risk control with construction work by removing the hazard measures that will be implemented for any for example stop using a hazardous chemical. identified HRCW, and is required to be prepared Minimise the risk to health or safety by using any before HRCW starts. one, or any combination, of the following controls: This example SWMS is for general demolition Substitute the hazard for example using a work and has been developed to assist PCBUs to new activity, procedure, item of plant, process meet their responsibilities, as required by part , or chemical.
4 Division 2, High risk construction work safe work Isolate persons from the hazard for example method statements required for in the work Health barriers, fencing or guardrails. and Safety Regulation 2011 (WHS Regulation). Use engineering controls for example PCBUs can use this as a general example , but would mechanical or electrical devices. need to adapt this to be workplace specific. Use administrative controls for example changing the way the work is done. RECOMMENDED STEPS FOR Provide personal protective equipment (PPE). COMPLETING A SAFE work for example safety spectacles, ear muffs/plugs method statement or hard hats.
5 Consult with relevant workers, contractors and health and safety representatives (HSRs) about the tasks, the HRCW involved and the associated hazards, risks and controls. In the Task' column, list in sequence what basic steps will be undertaken for the work . Under What high risk construction work does this task involve?', detail the relevant hazard number(s). relating to the HRCW involved with that task. If a task does not involve any HRCW, write N/A'. in this column. It is not then compulsory to outline the hazards, risks and control measures for that particular task. 3. SAFE work method .
6 statement COMPLIANCE. (INFORMATION, MONITORING. AND REVIEW). Brief each team member on this SWMS before commencing work . Ensure the team knows work is to stop if the SWMS is not followed. Observe the work being carried out and monitor compliance with the SWMS. Review risk controls regularly: before a change occurs to the work itself, the system of work or the work location if a new hazard associated with the work is identified when new or additional information about the hazard becomes available when a notifiable incident occurs in relation to the work when risk controls are inadequate or the SWMS is not being followed.
7 In all of the above situations, stop the work , review the SWMS, adjust as required and re-brief the team. Retain all versions of the SWMS in a readily available location for the duration of the HRCW. and for at least two years after a notifiable incident occurs. 4. SAFE work method statement FOR demolition work APPLICATION FORM. SAFE work method statement demolition work . Company name: ABC demolition [ABN] Principal contractor: XYZ Contracting Services 123 Mortar Street, Standard Course, ACT 2600 8910 management Road, Projectville, ACT 2666. Phone: (02) 1234 5678 Phone: (02) 9876 5432. work activity: demolition work work location: Potters Hut, Brick Street, not workplace specific Pottery, ACT 2600.
8 Works manager: Fred Bloggs Contact phone: 0400 111 111. Company name: ABC demolition [ABN] Principal contractor: XYZ Contracting Services 123 Mortar Street, Standard Course, ACT 2600 8910 management Road, Projectville, ACT 2666. Phone: (02) 1234 5678 Phone: (02) 9876 5432. work activity: demolition work work location: Potters Hut, Brick Street, not workplace specific Pottery, ACT 2600. Works manager: Fred Bloggs Contact phone: 0400 111 111. Hazard number High risk construction work YES. 1 Involves a risk of a person falling more than two metres Involves demolition of an element of a structure that is load-bearing or otherwise related to the 2.
9 Physical integrity of the structure 3 Involves, or is likely to involve, the disturbance of asbestos 4 Involves structural alterations or repairs that require temporary support to prevent collapse 5 Is carried out in or near a confined space Is carried out in or near a shaft or trench with an excavated depth greater than metres or is 6. carried out in or near a tunnel 7 Involves the use of explosives Is carried out on or near pressurised gas distribution mains or piping, chemical, fuel or refrigerant 8. lines or energised electrical installations or services 9 Is carried out in an area that may have a contaminated or flammable atmosphere 10 Involves tilt-up or precast concrete Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in 11.
10 Use by traffic other than pedestrians 12 Is carried out in an area at a workplace in which there is any movement of powered mobile plant 13 Is carried out in an area in which there are artificial extremes of temperature 14 Is carried out in or near water or other liquid that involves a risk of drowning 15 Involves diving work 5. Task What high risk construction What are the hazards and the risks? What are the control measures? work does this task involve? SA. 1 Delivery Movement of powered Workers and others being struck by Prepare and implement workplace traffic management plan of plant mobile plant.