( sbmf ) Santa Barbara Mission Finish PACKAGING: approximately 5 to 10 minutes in order 90 lb ( kg) net weight in a multi-wall to allow the material to slake. Doing bag. this allows the material to start its n S torage: Store off ground and protect initial set. Re-engage the mixing blades from rain and moisture. for approximately 5 minutes, adjusting n S helf Life: Reference Parex USA the water and mixing only long enough Expiration Date of Products Technical to achieve uniformity. The material Bulletin. is now ready to be removed from the mixer and applied to the wall. (Please SURFACE PREPARATION: see Application section.)

DESCRIPTION: LaHabra Santa Barbara Mission Finish provides a lasting, durable smooth stucco finish over LaHabra Fiber-47 Fastwall Scratch & Brown, LaHabra Fastwall Stucco

Tags:

  Mission, Finish, Santa, Barbara, Stucco, Sbmf, Santa barbara mission finish, Santa barbara mission finish lahabra, Lahabra

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of (SBMF) Santa Barbara Mission Finish - LaHabra …

1 ( sbmf ) Santa Barbara Mission Finish PACKAGING: approximately 5 to 10 minutes in order 90 lb ( kg) net weight in a multi-wall to allow the material to slake. Doing bag. this allows the material to start its n S torage: Store off ground and protect initial set. Re-engage the mixing blades from rain and moisture. for approximately 5 minutes, adjusting n S helf Life: Reference Parex USA the water and mixing only long enough Expiration Date of Products Technical to achieve uniformity. The material Bulletin. is now ready to be removed from the mixer and applied to the wall. (Please SURFACE PREPARATION: see Application section.)

2 NT he surface of the plaster brown n For additional batches of the same coat base or concrete partially material, thin the remaining mixture determines the texture, color and final with water, then repeat adding the result of the Finish . color packs and mixing as described. nA fter application, of the brown coat Wash out mixer completely to change DESCRIPTION: rod, darby or trowel it to produce the colors. LaHabra Santa Barbara Mission Finish specified level. n Santa Barbara Mission Finish is a Finish provides a lasting, durable smooth stucco nN ext, hard float the base to eliminate material installed at approximately Finish over LaHabra Fiber-47 Fastwall slick spots and open the surface to 1/8 thick, it is not for use as a stucco Scratch & Brown, LaHabra Fastwall stucco enable a good mechanical bond for base material.

3 Base, exterior plaster brown coat the Finish coat. Note: All LaHabra cement/lime Finish products and Parex USA stucco Level Coat. It is nH and application over portland should be mechanically mixed for a minimum integrally colored with fade-resistant cement plaster: Prior to application of 20 minutes after the last bag of stucco pigments, and is economical with low of sbmf stucco Finish , the portland base is added to fully disperse the color maintenance. Product is available in cement base shall be dampened with premix (25 bag minimum) or tint Base 100 clean water to control and equalize APPLICATION: and 200 for use with LaHabra Color Packs.

4 Suction. Allow surface moisture to n Color coat shall be approximately 1/8 . dissipate prior to application of the thick. USES: Santa Barbara Mission Finish . For nH and application over a portland Exterior color coat for portland cement application over any surface other cement plaster brown coat: Prior to brown coat. than a portland cement brown coat, application of sbmf stucco Finish , the contact Parex USA Technical Support portland cement base coat shall be COLORS: for proper preparation. 30 standard colors and 12 Lifestyle colors dampened with clean water to control are available for sbmf . LaHabra Color and equalize suction.

5 Allow surface MIXING: Packs are specifically designed for use with moisture to dissipate prior to the n Read the entire label before using this LaHabra Santa Barbara Mission Finish . application of the stucco Finish . product. Special colors are available on request. n Trowel or float apply an even coat nU sing a mechanical plaster mixer, start Meets SCAQMD Rule 1113 when using completely covering the base coat and with approximately three gallons of Parex USA Non-VOC Colorants. allow it to set although prior to drying cool, clean potable water add one out, trowel apply a second tight coat 90 lb. bag of Premix Santa Barbara COVERAGE: of the same material over the first to Mission Finish or the appropriate tint Coverage will vary depending on the desired Finish level.

6 Base and mix to a thin consistency substrate, thickness and texture of the until it is smooth and free of lumps. application. Traditional Smooth Santa Barbara nA dd all of the color packs (1 per bag nA pproximate coverage per 90 lb. ( kg) Mission Finish for a standard color, a maximum of bag is 90-135 ft2 ( m2). Allow the application to set although 4 standard 1 lb. color packs can be prior to drying out, trowel the surface COMPOSITION: added per 90 lb. bag for increased to the desired or approved Finish level n Binder: Portland cement and hydrated color depth) to be used for one using as little water as possible.

7 Lime batch and mix until color is evenly n Aggregates dispersed, (approximately 1 to 2. 30/30 Float Finish n Proprietary additives minutes). Before the second coat has set, use nT hin the mixture with water and then a float to bring the aggregate to MATERIAL STANDARD: add the remaining bags of stucco the surface to achieve the desired n Type-S Hydrated Lime: Finish (adjusting water as necessary) to sand Finish . ASTM C-206 correspond with the number of color nD uring periods of hot or dry weather n White Portland Cement: packs mixed in step 3. Allow material condition, a light spray (mist) of clean ASTM C-150 Type 1; to mix at a somewhat stiff consistency water is recommended over the stucco n LaHabra Santa Barbara Mission for approximately 15 minutes.

8 Add Finish . LaHabra Santa Barbara Mission Finish : Conforms to ASTM C926 the remaining amount of water to Finish will normally dry and set the recommendations. achieve the desired consistency, and same day. Allow 28 days for curing. then disengage the mixing blades for nC olor and performance may be nR aw materials that are used in the product, a sample should be applied affected by the addition of field composition of Santa Barbara Mission and allowed to cure for color additives. Field additives are not to Finish sometimes contain small pieces approval. be used except at the direction of the of lime, pigment or cement that are not n Protect adjacent surfaces from Parex USA Technical Support.

9 Detectable during manufacturing but overspray and droppings, drips n Variations in color due to weather, job that can contribute to color streaks or or spills. They should be removed conditions, and method of application spots when the material is over troweled. immediately with water or soap and should be expected. To change This cannot be controlled during the water to prevent the possibility of the color of Santa Barbara Mission manufacturing process. The applicator permanent staining. Finish that has not been painted has the option during the application or sealed apply Allegro II Cement process to remove material that may be WARNING: Coating.

10 Allegro II is available in all undesirable or to repair the Finish after nR ead complete Warning information of LaHabra 's standard and Lifestyle installation if the property owner so printed on product container prior colors. requests. to use. For medical emergency nU se only on surfaces that are sound, information, call 1-800-424-9300. LIMITATIONS: clean, dry, unpainted, and free from any n F or more information on handling nA Finish with variegated or mottled residue that might affect the ability of this product refer to its Safety Data color is often desired when sbmf is this product to bond to the surface.