Section VI. SPECIFICATIONS SUPPLEMENTAL SPECIFICATIONS TO: DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOLUME II, 2013 EDITION CONTRACTORS SHALL PURCHASE THE DPWH STANDARD SPECIFICATIONS STATED ABOVE. THIS STANDARD SPECIFICATIONS SHALL FORM PART OF THE CONTRACT DOCUMENTS AND SHALL BE READ IN CONJUNCTION WITH THIS SUPPLEMENTAL SPECIFICATIONS AND THE SPECIAL PROVISIONS OF THE STANDARD SPECIFICATIONS . Construction, Rehabilitation, Improvement of Davao Fish Port Complex Volume II- SPECIFICATIONS i INTRODUCTION The SPECIFICATIONS describe in detail the work to be executed, the character and quality of materials, workmanship and the specific responsibilities of the Contractor that are not covered by the Conditions of Contract.

B.7 Occupational Safety and Health Program B-10 B.8 (1) Traffic Management B-11 B.9 Mobilization & Demobilization B-12 PART C EARTHWORKS C-1 ITEM 100- CLEARING AND GRUBBING C-1 ... 403.1Description F-21 403.2 Material Requirements F-22 403.3 Construction Requirements F-22 ...

Tags:

  Health, Safety, Occupational, Occupational safety

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Section VI. SPECIFICATIONS - pfda.gov.ph

1 Section VI. SPECIFICATIONS SUPPLEMENTAL SPECIFICATIONS TO: DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOLUME II, 2013 EDITION CONTRACTORS SHALL PURCHASE THE DPWH STANDARD SPECIFICATIONS STATED ABOVE. THIS STANDARD SPECIFICATIONS SHALL FORM PART OF THE CONTRACT DOCUMENTS AND SHALL BE READ IN CONJUNCTION WITH THIS SUPPLEMENTAL SPECIFICATIONS AND THE SPECIAL PROVISIONS OF THE STANDARD SPECIFICATIONS . Construction, Rehabilitation, Improvement of Davao Fish Port Complex Volume II- SPECIFICATIONS i INTRODUCTION The SPECIFICATIONS describe in detail the work to be executed, the character and quality of materials, workmanship and the specific responsibilities of the Contractor that are not covered by the Conditions of Contract.

2 It includes the Technical SPECIFICATIONS , the DPWH Standard SPECIFICATIONS and Supplemental Notices or Addenda, if any, and shall be read in conjunction with the Plans and all the other Contract Documents. The SPECIFICATIONS comprise of the DPWH Standard SPECIFICATIONS , the Supplemental SPECIFICATIONS and the Special Provisions. Conformity to standardized Pay Items of Works has been adapted in reference to DPWH Department Order No. 5, series of 2017. Pertinent notes appearing in the Contract Plans or Drawings shall also be considered as part and parcel of the technical SPECIFICATIONS . Such notes shall take precedence over the General SPECIFICATIONS and the Special Provisions.

3 Further amendments to the SPECIFICATIONS , if necessary, shall be furnished by means of Supplemental Notice(s). The Technical SPECIFICATIONS comprise of the following parts: DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOLUME II, 2013 EDITION DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS STRUCTURES, VOLUME III, 1995 AND SPECIAL PROVISIONS Pertinent notes appearing in the Contract Plans or Drawings shall also be considered as part and parcel of the Technical SPECIFICATIONS . Any further amendments to the SPECIFICATIONS and to any other Document, if necessary, will be furnished to the Contractors by means of Supplemental Notice or Addendum.

4 Notice: This document was prepared by WCI solely for use by Philippine Fisheries Development Authority (PFDA). This document is not addressed to and may not be relied upon by any person or entity other than PFDA for any purpose without the prior written permission of WCI and affiliated companies accept no responsibility or liability for reliance upon or use of this report (whether or not permitted) other than by PFDA for the purposes for which it was originally commissioned and prepared. In producing this document, WCI has relied upon information provided by others. The completeness or accuracy of this information cannot be guaranteed.

5 Construction, Rehabilitation, Improvement of Davao Fish Port Complex Volume II- SPECIFICATIONS toc-i TABLE OF CONTENTS VOLUME II STANDARD SPECIFICATIONS PART A FACILITIES FOR THE ENGINEER A-1 (7) Provision of Combined Field Office and Laboratory Building for the Engineer (Rental Basis) A-1 (16) Operation and Maintenance of Field Office for the Engineer A-1 (2) Provision of 4x4 Pick Up Type Service Vehicles for the Engineer (on Bare Rental Basis) A-2 (5) Operation and Maintenance of Vehicles for Engineer A-2 (1) Provision of Progress Photographs A-3 (11) Provision of Furnitures/ Fixtures, Equipment and Appliances for the Field Office for the Engineer A-3 SCHEDULE A FURNITURE A-4 PART B OTHER GENERAL REQUIREMENTS B-1 Project Billboard/ Signboard B-9 occupational safety and health Program B-10 (1) Traffic Management B-11 Mobilization & Demobilization B-12 PART C EARTHWORKS C-1 ITEM 100- CLEARING AND GRUBBING C-1 Description C-1 Construction Requirements C-1 Method of Measurement C-3 Basis of Payment C-3 ITEM 100(4) Balling and Replanting of Trees C-4 100(4).

6 1 Description C-4 100(4).2 Construction Requirements C-4 100(4).3 Method of Measurement C-5 100(4).4 Basis of Payment C-5 ITEM 101 REMOVAL OF STRUCTURES AND OBSTRUCTIONS C-6 Description C-6 Construction Requirements C-6 Method Measurement C-7 Basis of Payment C-7 ITEM 102- EXCAVATION C-8 Description C-8 Construction Requirements C-9 Methods of Measurement C-12 Basis of Payment C-12 ITEM 103 - STRUCTURE EXCAVATION C-13 Description C-13 Construction Requirements C-13 Construction, Rehabilitation, Improvement of Davao Fish Port Complex Volume II- SPECIFICATIONS toc-ii Method of Measurement C-16 Basis of Payment C-17 Description C-18 Material Requirements C-18 Construction Requirements C-18 Method of Measurement C-23 Basis of Payment C-23 ITEM 105 SUBGRADE PREPARATION C-23 Description C-23 Material Requirements C-23 Construction Requirements C-23 Method of Measurement C-25 Basis of Payment C-25 ITEM 106 COMPACTION EQUIPMENT AND DENSITY CONTROL STRIPS C-26 Description C-26 Construction

7 Requirements C-26 Method of Measurement C-27 Basis of Payment C-27 ITEM 107 OVERHAUL C-27 Description C-27 Method of Measurement C-27 Basis of Payment C-28 PART D SUBBASE AND BASE COURSE D-1 ITEM 200 AGGREGATE SUBBASE COURSE D-1 Description D-1 Material Requirements D-1 Construction Requirements D-1 Method of Measurement D-1 Basis of Payment D-2 ITEM 202 CRUSHED AGGREGATE BASE COURSE D-2 Description D-2 Material Requirements D-2 Construction Requirements D-2 Method of Measurement D-3 Basis of Payment D-3 PART E SURFACE COURSE E-1 ITEM 300 AGGREGATE SURFACE COURSE E-1 Description E-1 Material Requirements E-1 Construction Requirements E-1 Basis of Payment E-1 ITEM 301 BITUMINOUS PRIME COAT E-2 Description E-2 Material Requirements E-2 Construction Requirements E-2 Method of Measurement E-3 Basis of Payment E-3 Construction, Rehabilitation.

8 Improvement of Davao Fish Port Complex Volume II- SPECIFICATIONS toc-iii ITEM 303 BITUMINOUS SEAL COAT E-4 Description E-4 Material Requirements E-4 Construction Requirements E-5 Method of Measurement E-6 Basis of Payment E-6 ITEM 310 BITUMINOS CONCRETE SURFACE COURSE, HOT-LAID E-7 Description E-7 Material Requirements E-7 Method of Measurement E-8 Basis of Payment E-8 ITEM 311 PORTLAND CEMENT CONCRETE PAVEMENT E-9 Description E-9 Material Requirements E-9 Construction Requirements E-13 Basis of Payment E-30 PART F BRIDGE CONSTRUCTION F-1 ITEM 400 PILING F-1 Description F-1 Construction Requirements F-7 Method of Measurement F-16 Basis of Payment F-17 ITEM 401 Railings F-18 Description F-18 Material Requirements F-18 Construction Requirements

9 F-19 Method of Measurement F-20 Basis of Payment F-20 ITEM 403 Metal Structures F-21 F-21 Material Requirements F-22 Construction Requirements F-22 Method of Measurement F-33 Basis of Payment F-34 ITEM 404 REINFORCING STEEL F-34 Description F-34 Material Requirements F-34 Construction Requirements F-35 Method of Measurement F-36 Basis of Payment F-37 ITEM 405 STRUCTURAL CONCRETE F-37 Description F-37 Material Requirements F-38 Method of Measurement F-41 Basis of Payment F-41 Construction, Rehabilitation.

10 Improvement of Davao Fish Port Complex Volume II- SPECIFICATIONS toc-iv PART G PROTECTION WORKS G-1 ITEM 1501 BREAKWATER G-1 Description G-1 Material Requirements G-1 Construction Requirements G-2 Method of Measurement G-3 Basis of Payment G-4 ITEM 1502 REVETMENT G-4 Description G-4 Scope of Work G-4 Material Requirements G-5 Method of Measurements G-6 Basis of Payment G-6 ITEM 1503 MULTI-PURPOSE PIER/WHARF G-7 Description G-7 Material Requirements G-7 Construction Requirements G-8 Method of Measurements G-9 Basis of Payment G-9 ITEM 502 MANHOLES, INLETS AND CATCH BASINS G-10 Description G-10 Material Requirements G-10 Basis of Payment G-10 ITEM 505 RIPRAP G-10 Description G-10 505.