Example: stock market

SINTAKOTE STEEL PIPELINE SYSTEMS PROJECT …

SINTAKOTE STEEL PIPELINE SYSTEMS . PROJECT experience . STEEL Mains and its antecedents have participated in most of the major water supply pipelines constructed in Australia since the early 1900's. A summary of some of those STEEL Mains SINTAKOTE STEEL PIPELINE SYSTEMS projects undertaken in recent years is given below. Principal PROJECT Year/s Length Diameters Variations* Time*. (km) (mm) Extensions 1 Woleebee Creek to 2013 120 914/960/ None None Glebe Weir PIPELINE 1067/1404. PROJECT 2 Queensland Curtis 2012/2013 140 406/508/ None None LNG PROJECT - Water 559/660/. Trunklines 762/960. 3 Melbourne 2009/2010 84 1930 None None Desalination Plant- Transfer PIPELINE 4 Adelaide 2009 12 1575 None None Desalination Plant- Transfer PIPELINE 5 Sugarloaf 2008/2009 70 1404/1750 None None Interconnector PIPELINE 6 Wimmera-Mallee 2007/2008/ 94 711/1016 None None PIPELINE PROJECT 2009.

SOLUTIUONS FOR LIFE Page 1 SINTAKOTE STEEL PIPELINE SYSTEMS PROJECT EXPERIENCE Steel Mains and its antecedents have …

Tags:

  System, Project, Steel, Experience, Pipeline, Sintakote, Sintakote steel pipeline systems project, Sintakote steel pipeline systems project experience

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of SINTAKOTE STEEL PIPELINE SYSTEMS PROJECT …

1 SINTAKOTE STEEL PIPELINE SYSTEMS . PROJECT experience . STEEL Mains and its antecedents have participated in most of the major water supply pipelines constructed in Australia since the early 1900's. A summary of some of those STEEL Mains SINTAKOTE STEEL PIPELINE SYSTEMS projects undertaken in recent years is given below. Principal PROJECT Year/s Length Diameters Variations* Time*. (km) (mm) Extensions 1 Woleebee Creek to 2013 120 914/960/ None None Glebe Weir PIPELINE 1067/1404. PROJECT 2 Queensland Curtis 2012/2013 140 406/508/ None None LNG PROJECT - Water 559/660/. Trunklines 762/960. 3 Melbourne 2009/2010 84 1930 None None Desalination Plant- Transfer PIPELINE 4 Adelaide 2009 12 1575 None None Desalination Plant- Transfer PIPELINE 5 Sugarloaf 2008/2009 70 1404/1750 None None Interconnector PIPELINE 6 Wimmera-Mallee 2007/2008/ 94 711/1016 None None PIPELINE PROJECT 2009.

2 7 South East 2006/2007/ 334 813/ None None Queensland 2008 960/1085/. Water Grid 1290/1451. 8 Bayswater Power 2008 4 1451 None None Station 9 Ballarat Link of the 2007/2008 47 800 None None Goldfields Superpipe 10 Goulburn to 2007 47 1124 None None Campaspe Link Superpipe PROJECT SOLUTIUONS FOR LIFE. Page 1. 11 Torrens system 2007 1829 None None Upgrade PROJECT 12 Liverpool to Ashfield 2006/2007 20 988/1067/ None None PIPELINE 1124. 13 Burdekin to 2006 172 813 None None Moranbah PIPELINE 14 Kwinana 2005/2006 23 1200/1400 None None Desalination Connection 15 Stag Creek PIPELINE 2005 15 800/960 None None 16 Clarence Valley 2003/2004 16 960 None None RWSS Stage 1B.

3 17 Mt Miller PIPELINE 2003 17 900 None None 18 Clarence Valley 2002 35 660 None None RWSS Stage 1A. 19 Stirling Trunk Main 2000/2001 106 1400 None None * There were no variations or time extensions attributable to Tyco Water's failure to perform. 1. PROJECT Name: Woleebee Creek to Glebe Weir PIPELINE PROJECT Description and Location: Supply of a pressure PIPELINE from Woleebee Creel to Glebe Weir. Quantity, Size and Type: 120km of 914/960/1067/1404mm SINTAKOTE RRJ MSCL pipe. Supply Period: April 2013 to September 2013. Principal: SunWater Contract Problems: None to date. Remarks: Pipe deliveries completed to date on time with no problems.

4 Referee: Mr Russell Paton SunWater Tel: (07) 3120 0201. SOLUTIUONS FOR LIFE. Page 2. 2. PROJECT Name: Queensland Curtis LNG PROJECT - Water Trunklines Description and Location: Supply of a pressure PIPELINE for the QCLNG Upstream PROJECT . Quantity, Size and Type: 140km of 406/508/559/660/762/960mm SINTAKOTE RRJ MSCL pipe. Supply Period: April 2012 to June 2013. Principal: Queensland Gas Company (QGC). Contract Problems: None. Remarks: Pipe deliveries completed on time with no problems. Referee: Henro Van Wyk EPcm Contract Manager). Tel: +61 408 338 682. 3. PROJECT Name: Victorian Desalination PROJECT -Transfer PIPELINE Description and Location: Supply of a pressure PIPELINE from Wonthaggi Desalination Plant Wonthaggi to Cardinia Reservoir.

5 Quantity, Size and Type: 84km of 1930mm SINTAKOTE Ball & Socket Joint MSCL pipe. Supply Period: December 2009 to December 2010. Principal: Aquasure Consortium (Thiess, Degremont (Suez Environment) and Macquarie Capital). Contract Problems: None to date (May 2011). Remarks: Pipe deliveries completed on time with no problems. Referee: Jason Spears ( PROJECT Director Aquasure PIPELINE Joint Venture). Tel: +61 418 534 483. SOLUTIUONS FOR LIFE. Page 3. 4. PROJECT Name: Adelaide Desalination Plant-Transfer PIPELINE Description and Location: Supply of a pressure PIPELINE from Port Stanvac to Happy Valley Water Treatment Plant and Reservoir.

6 Quantity, Size and Type: 12km of 1575mm SINTAJOINT RRJ MSCL pipe. Supply Period: February 2009 to November 2009. Principal: SA Water. Contract Problems: None Remarks: Pipe deliveries all on time with no problems. Referee: Andrew Gambling ( PROJECT Director McConnell Dowell-Built Environs Joint Venture). Tel: 0407 046 504. 5. PROJECT Name: Sugarloaf Interconnector PIPELINE Description and Location: Supply of a pressure PIPELINE from Eildon Reservoir to Sugarloaf Reservoir. Quantity, Size and Type: 50km of 1750mm and 20km of 1404mm SINTAKOTE Ball and Socket Joint MSCL pipe. Supply Period: May 2008 to August 2009. Principal: Melbourne Water.

7 Contract Problems: None. Remarks: Pipe deliveries were on or before time with no problems. Referee: Rod Clifford ( PROJECT Director Sugarloaf Interconnector PROJECT -Melbourne Water). Tel: (03) 92352561. Mob: 0407 884 088. SOLUTIUONS FOR LIFE. Page 4. 6. PROJECT Name: Wimmera-Mallee PIPELINE PROJECT Description and Location: Supply of a new pressurised PIPELINE water supply system to replace the existing channel delivery system . Quantity, Size and Type: 64km of 1016 outside diameter SINTAJOINT RRJ and Welded STEEL pipe and 30km of 711 outside diameter SINTAJOINT RRJ and Welded STEEL pipe. Supply Period: December 2007 to October 2009.

8 Principal: Grampians Wimmera-Mallee Water. Contract Problems: None. Remarks: Pipe deliveries were on time with no problems. Referee: Mr Jeff Rigby (Managing Director). GWMW ater Tel: (03) 5382 4611. SOLUTIUONS FOR LIFE. Page 5. 7. PROJECT Name: South East Queensland Water Grid Description and Location: The South East Queensland Water Grid consists of the Northern Interconnector PIPELINE , the Southern Regional Water PIPELINE , the Eastern Interconnector PIPELINE and the Western Corridor Recycled Water Scheme. Quantity, Size and Type: 334km of SINTAKOTE STEEL pipe in sizes ranging from 800 to 1451 outside diameter. Supply Period: November 2006 to July 2008.

9 Principal: The Queensland Government. Contract Problems: None. Remarks: Tyco Water met all supply deadlines for each of these significant projects. Referee: Mr Nigel Deacon Infrastructure Delivery Group Department of Infrastructure and Planning Tel: (07) 3898 0474. 8. PROJECT Name: Bayswater Power Station Description and Location: Constructed by Eire Contractors at Bayswater Power Station Muswellbrook in order to supply additional water to the Power Station. Quantity, Size and Type: Approximately 4km of 1451 outside diameter SINTAJOINT RRJ STEEL pipe and fittings. Supply Period: Period of 8 weeks from February 2008 to May 2008.

10 Principal: Macquarie Generation. Contract Problems: None. Remarks: All pipe deliveries were on time. Referee: Mr Gavin Heydon ( PROJECT Manager). Macquarie Generation Mob: 0427 702 204. SOLUTIUONS FOR LIFE. Page 6. 9. PROJECT Name: Ballarat Link of the Goldfields Superpipe Description and Location: Supply of a pressure PIPELINE from Sandhurst Reservoir (approx. 10km SW of Bendigo) to the White Swan Reservoir (approx. 10km NE of Ballarat). Quantity, Size and Type: 47km of 800 outside diameter SINTAJOINT RRJ STEEL pipe. Supply Period: March 2007 to December 2008. Principal: Central Highlands Water. Contract Problems: None.