Smoke Control UL 864 UUKL Compliance Checklist …

Metasys Network Technical Manual 636 Smoke Control Section Technical Bulletin Issue Date 1199 1999 Johnson Controls, Inc.

4 Smoke ControlSmoke Control UL 864 UUKL Compliance Checklist In the case where a project specification dictates compliance with the UUKL Listing, but …

Tags:

  Control, Checklist, Compliance, Smoke, Smoke control, Smoke control ul 864 uukl compliance checklist, Uukl

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Smoke Control UL 864 UUKL Compliance Checklist …

1 Metasys Network Technical Manual 636 Smoke Control Section Technical Bulletin Issue Date 1199 1999 Johnson Controls, Inc.

2 1 Code No. LIT-636333 Smoke Control UL 864 uukl Compliance Page 3 Literature 4 UL 864 uukl Smoke Control Compliance Survey 5 General uukl Requirements 6 Fire OWS as FSCS uukl Requirements *8 DX-9100/9120 Applications uukl Requirements 9 Smoke Control Wiring uukl Requirements *10 Smoke Control UL 864 uukl Compliance Checklist *Indicates those sections where changes have occurred since the last printing. 2 Smoke Control Smoke Control UL 864 uukl Compliance Checklist Smoke Control Smoke Control UL 864 uukl Compliance Checklist 3 Smoke Control UL 864 uukl Compliance This document summarizes the most common requirements to configure Metasys to be compliant with Underwriters Laboratories (UL), UL 864 uukl Smoke Control Listing.

3 A UL 864 uukl Smoke Control Compliance Survey form is followed by tables listing the requirements for UL 864 uukl Listing Compliance . The purpose of the enclosed UL 864 uukl Smoke Control Compliance Survey is to provide a record of those elements of NFPA (National Fire Protection Association) 92A and uukl , which are being provided by Johnson Controls and not being provided by Johnson Controls. uukl is an identifier created by UL to identify those products Listed under UL 864 as Smoke Control Equipment. It should be recognized that the uukl Listing is based on a supplement to UL 864, rather than part of the formal standard. That supplement is based on NFPA 92A, which is a Recommended Practice rather than a Code or Standard. Products covered by this Listing are intended to be installed in conjunction with Heating, Ventilating, and Air Conditioning (HVAC) equipment to form a system for controlling the flow of Smoke in a building during a fire condition in accordance with NFPA Recommended Practice 92A.

4 A Recommended Practice, as defined by NFPA, uses the word should to indicate recommendations, as opposed to a Standard or Code, which uses the word shall to indicate requirements. Since the uukl Listing is based on a Recommended Practice, which is less stringent and less binding than an NFPA Standard, a considerable amount of latitude is granted to the designer of the Smoke Control system. For example, the designer may choose to implement some of the elements identified in the Smoke Control Compliance Survey, such as positive damper position annunciation from two end switches, while choosing not to provide other elements, such as the FSCS (Fire Fighter s Smoke Control Station) annunciator. This is acceptable as long as there is agreement with the local Authority Having Jurisdiction (AHJ) regarding the configuration.

5 As a result of the latitude granted the designer and because of the variation among job specifications, it is important that we document the system elements that are being provided, along with those that are not being provided. The Smoke Control Compliance Survey can be used to provide that documentation. 4 Smoke Control Smoke Control UL 864 uukl Compliance Checklist In the case where a project specification dictates Compliance with the uukl Listing, but contains elements of the system design which conflict with the Listing or are omitted, the completed UL 864 uukl Smoke Control Compliance Survey can be given to the designer and/or AHJ to obtain recognition and agreement on the extent of Listing Compliance . This should occur prior to bid and/or proposal.

6 Once agreement is reached with the AHJ, designer, and customer, the signed or initialed Smoke Control Compliance Checklist must become a permanent part of the project file. If you are bidding, engineering, installing, or commissioning a Metasys System requiring uukl Smoke Control Listing Compliance , follow the guidelines and procedures outlined in the latest issue of the Metasys technical bulletins. Refer to the Smoke Control Technical Bulletin (LIT-636330) and the Smoke Control section in the Metasys Network Technical Manual (FAN 636) for complete information. In addition, read and become familiar with the applicable building codes and standards documents listed in the Smoke Control Technical Bulletin (LIT-636330). Literature Smoke Control Smoke Control UL 864 uukl Compliance Checklist 5 UL 864 uukl Smoke Control Compliance Survey Date of Survey Conducted By Project Location Branch Office Project Manager UL Compliance Required By: Specification Building Codes Contract Applicable Building Codes and Standards: Local (Branch) Person Providing and Verifying Information Initials Name 6 Smoke Control Smoke Control UL 864 uukl Compliance Checklist Table 1 lists general requirements for UL 864 uukl Listing Compliance .

7 Mark Yes/No for Compliance and initial each item that was verified. Table 1: General uukl Requirements Requirement Y/N NA Person Verifying Communication links between buildings are fiber optic cable or copper cable buried in a conduit separate from power wiring. Each binary output object used for pressurization and exhaust Control outputs is configured with its own feedback binary input. The feedback binary input monitors the associated controlled equipment status (both open and closed, on and off, etc.). For Smoke Control dampers, there is a pair of feedback binary inputs for two damper end switches.

8 For fans there is positive indication of air flow and/or on/off status of fan. Manual operations occurring from a non- uukl Listed OWS (Operator Workstation) isolated from the Listed segment of Metasys do not have priority over automatic Smoke Control sequences by normal system operators or those initiated manually from the manual override station. The Weekly Testing of Dedicated Stairwell Pressurization Fans application is used on all dedicated Smoke Control systems. BOs have Priority 2 commands and all other non- Smoke Control logic use lower command priorities. Automatic activation of any Smoke Control sequence of operation has priority over any non- Smoke Control manual commands and any automatic environmental Control strategy, when an auto Smoke Control sequence is initiated.

9 High and low temperature protection devices and return and exhaust air-duct Smoke detectors are bypassed. Response time for individual Smoke Control fan to commanded state is no more than 60 seconds. Response time for individual Smoke Control dampers to commanded state is no more than 75 seconds. Fire alarm system manual pull stations do not initiate automatic Smoke Control sequences. Smoke detectors are used to initiate a Smoke Control strategy only as detailed in the Smoke Control Technical Bulletin (LIT-636330). All Application Specific Controls (ASCs) that monitor or Control Smoke Control equipment are uukl Listed. The Operator Terminal on a Metasys Network is not used for Smoke Control . Any NCM100s are upgraded to NCM200/201s with transient protection where required.

10 The system is configured to record all Smoke Control system alarm and trouble messages on the PRN-3/-4 printer. Electrical disconnects, overloads, duct static pressure limits, and supply air duct Smoke detectors are not overridden by manual or automatic Smoke Control strategies. Network Terminal on Metasys Network are used on Smoke Control systems, but are not used for Smoke Control functions. A uukl Listed active hub separates the N1 into uukl and non- uukl segments. No Smoke Control or related monitoring is associated with the non- uukl segment. General uukl Requirements Smoke Control Smoke Control UL 864 uukl Compliance Checklist 7 Table 2 lists general requirements for UL 864 uukl Listing Compliance for FSCSs where required. Mark Yes/No for Compliance and initial each item that was verified.