Powering forward. Together. SMUD s Electric Vehicle Incentive Programs Ravi Patel Agenda Residential Drive Electric Program Workplace & Multifamily EV Charger Incentive Program DC Fast Charger Incentive Program Program Process Resources Q&A 2 Residential Drive Electric Program Customers who purchase or lease a new plug-in Electric Vehicle can select one of the following options: Charge Free for 2 Years - $599 rebate, OR Free Level 2 Charger Online Application Process April-Dec. 2016: ~430 applications Q1 of 2017: ~285 applications (enhanced rebate, TV commercial) SMUD s EV Estimator Compare costs to buy and drive an EV versus a gas engine Vehicle Environmental impact Discover rebates and tax credits EV Rate cents per kWh credit for charging between midnight and 6 Enhanced Outreach & Training ( Ride & Drive Events) Other program concepts being considered ( dealer engagement, group buy, etc.)

Powering forward. Together. SMUD’s Electric Vehicle Incentive Programs Ravi Patel

Tags:

  Programs, Electric, Vehicle, Incentives, S electric vehicle incentive programs

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of SMUD’s Electric Vehicle Incentive Programs

1 Powering forward. Together. SMUD s Electric Vehicle Incentive Programs Ravi Patel Agenda Residential Drive Electric Program Workplace & Multifamily EV Charger Incentive Program DC Fast Charger Incentive Program Program Process Resources Q&A 2 Residential Drive Electric Program Customers who purchase or lease a new plug-in Electric Vehicle can select one of the following options: Charge Free for 2 Years - $599 rebate, OR Free Level 2 Charger Online Application Process April-Dec. 2016: ~430 applications Q1 of 2017: ~285 applications (enhanced rebate, TV commercial) SMUD s EV Estimator Compare costs to buy and drive an EV versus a gas engine Vehicle Environmental impact Discover rebates and tax credits EV Rate cents per kWh credit for charging between midnight and 6 Enhanced Outreach & Training ( Ride & Drive Events) Other program concepts being considered ( dealer engagement, group buy, etc.)

2 3 Workplace & Multifamily EV Charger Incentive Program Benefits: Reduces range anxiety Added convenience Green image for business Corporate sustainability goals Recruit and retain employees/tenants or customers $1500 per EV charger port Maximum of 20 incentives per property Charger(s) must be: Level 2 (240V/208V) Hardwired wall or pedestal mounted Installed for employees of the workplace or tenants of a multifamily property Sub-metered Installed by a qualified and licensed contractor in accordance with local codes, permitting, and inspection requirements Goal for 2017 175 chargers for workplace 25 for multifamily 4 DC Fast Charger Incentive Program Up to $100k Incentive per project Incentive payments based on completion of project milestones Goal.

3 6 per year over next 5 years Incentive amount may change Recipient of Incentive must sign a contract agreement with SMUD 5 year term Recipient develops, owns and operates the charging station Easily accessible location Co-branding SMUD reviews project plan, site location, etc. 5 DCFC Project: Typical Site Layout Layout plans need to include two DCFC s and one level 2 EVSE All appropriate signs and markings including price and parking limits Current locations: Airport, Amtrak, Elk Grove Nugget Market, Sac Food Coop, Raleys Citrus Heights, SMUD solar parking lot SMUD High Need Low Need Program Steps: 8 Step 1 Contractor works with Commercial Customer to determine which SMUD EV Incentive Charger Program is the best fit.

4 Contractor performs a walk through: inspects service wiring for adequate capacity to supply the charging station, and confirms the panel size and meter socket requirements. Step 2 Contractor notifies Program Staff of the project. For DC Fast Chargers, the project must be approved by SMUD (agreement must be signed). Contractor submits drawings thru SMUD s online portal. SMUD architect comes to the site to review the project and electrical needs BEFORE the project begins. Step 3 Contractor pulls a permit, completes the installation, and calls for inspection. Step 4 Building Inspector approves the installation, SMUD is automatically notified. Contractor requests sub-meter installation (note: must clearly state that only a sub-meter for statistical purposes is needed NOT a new service meter) Step 5 SMUD crew is dispatched to install the sub-meter, and notifies Program Staff that the work is completed.

5 Step 6 Contractor helps customer submit the rebate application. For DC Fast Chargers, Incentive payments are based on completing specific milestones. Resources Program Staff Residential Drive Electric Program John Grindrod 916-732-5279) Workplace & MF EV Charging Ravi Patel 916-732-6263) DC Fast Charging Ralph Trout 916-732-5907) DC Fast Charger Incentive agreement Bill Westerfield 916-732-7107) Program Information Residential program website: Commercial program website: Program fact sheets and rebate application can be found online Technical Information & Services Meter socket requirements: SMUD s Electric Service Requirements- Engineering Specifications T015 Online Portal submit drawings, request inspection Request meter installation Email: Telephone.

6 916-732-5700 Rule 16 application ADA parking space requirements Division of the State Architect: 916-445-8100 9