South Dakota Department of TransportationAverage Unit Prices from Low BidsJanuary 01, 2017 to December 31, 2017 Office of Project Development - Bid LettingSouth Dakota Department of TransportationAverage Unit Price ReportItemNumberDescriptionUnit ofMeasureTotalQuantityTotal CostAverageBid PriceBidCnt004E0020 Construction and Maintenance of Detour(s)LS $859, 15$57, of Traffic Diversion(s)LS $1,327, 45$29, Traffic Diversion(s)LS $2,499, 64$39, $234,119, 725$337, StakingLS $352, 38$9, StakingMile 1, $3,577, 114$3, Centerline StakingMile $552, 27$1, Cross Section SurveyMile $330, 40$ StakingMile 1, $3,997, 132$3, StakingLS $12, 8$1, StakingMile $1,376, 121$2, StakingEach $625, 58$2, SurveyLS $147, 3$49, Elevation SurveyLS $426, 63$6, $685, 22$31, SystemEach $1,958, 10$195.

South Dakota Department of Transportation Average Unit Price Report Item Number Description Unit of Measure Total Quantity Total Cost Average Bid Price

Tags:

  Department, South, Dakota, Transportation, Average, South dakota department of transportation, South dakota department of transportation average

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of South Dakota Department of Transportation …

1 South Dakota Department of TransportationAverage Unit Prices from Low BidsJanuary 01, 2017 to December 31, 2017 Office of Project Development - Bid LettingSouth Dakota Department of TransportationAverage Unit Price ReportItemNumberDescriptionUnit ofMeasureTotalQuantityTotal CostAverageBid PriceBidCnt004E0020 Construction and Maintenance of Detour(s)LS $859, 15$57, of Traffic Diversion(s)LS $1,327, 45$29, Traffic Diversion(s)LS $2,499, 64$39, $234,119, 725$337, StakingLS $352, 38$9, StakingMile 1, $3,577, 114$3, Centerline StakingMile $552, 27$1, Cross Section SurveyMile $330, 40$ StakingMile 1, $3,997, 132$3, StakingLS $12, 8$1, StakingMile $1,376, 121$2, StakingEach $625, 58$2, SurveyLS $147, 3$49, Elevation SurveyLS $426, 63$6, $685, 22$31, SystemEach $1,958, 10$195, Schedule, Category ILS $27, 11$2, Schedule, Category IILS $228, 45$5, Management, Category IILS $721, 33$21, Schedule, Category IIILS $737, 34$21.

2 Management, Category IIILS $3,755, 34$110, Penetrating SealerSqYd 670, $4,018, 70$ ProgramHour 113, $423, 98$ and Grub StumpEach $43, 8$ and Grub TreeEach $30, 20$ $2,458, 162$15, Concrete Bridge Approach SlabSqYd 21, $1,140, 36$ Bridge RailingFt 7, $255, 17$ Concrete Bridge SlabSqYd 4, $691, 6$ Structural Steel Member(s)LS $21, 5$4, WeldIn $12, 5$ Rubberized Asphalt Chip SealSqYd $20, 3$ Concrete Footing(s)LS $283, 40$7, Traffic SignEach 46, $882, 87$ DelineatorEach 1, $9, 19$ Building(s)LS $391, 7$55, Concrete Curb and/or GutterFt 143, $775, 90$ Concrete CurbFt $ 4$ Concrete ChannelSqYd $ 3$ Asphalt Concrete CurbFt $1, 8$ Drop InletEach 1, $345, 72$ Edge DrainsLS $81, 5$16, Drop Inlet Frame and Grate AssemblyEach $7, 22$ ManholeEach $49, 33$ Manhole Frame and LidEach $3, 12$ Pipe CulvertFt 22, $454, 76$ Pipe End SectionEach $155, 66$ Sewer PipeFt 5, $39, 20$ Storm Sewer PipeFt 4, $61, 16$ Cattle GuardEach $3, 4$ Cattle PassFt $4, 2$ Cattle Pass End SectionEach $3, 2$ FenceFt 2,638.

3 $1,461, 110$ Chain Link FenceFt $1, 5$ Interim Crossover ClosureFt 2, $9, 11$ 3 Cable GuardrailFt 229, $481, 59$ High Tension 3 Cable GuardrailFt 32, $134, 5$ High Tension 4 Cable GuardrailFt 2, $6, 6$ Beam GuardrailFt 123, $496, 122$ 3 Cable Guardrail Anchor AssemblyEach 1, $250, 52$ 3:35:51 PMPage 2 of 28 Standard Items with average Bid Price for all accepted bidsSouth Dakota Department of TransportationAverage Unit Price ReportItemNumberDescriptionUnit ofMeasureTotalQuantityTotal CostAverageBid PriceBidCnt110E0745 Remove 3 Cable Guardrail Slip Base Anchor AssemblyEach $85, 37$ High Tension 3 Cable Guardrail Anchor AssemblyEach $46, 5$ High Tension 4 Cable Guardrail Anchor AssemblyEach $3, 6$ Beam Guardrail Trailing End TerminalEach $27, 29$ W Beam Guardrail Breakaway Cable TerminalEach $79.

4 39$ W Beam Guardrail Deformed EndEach $3, 5$ W Beam Guardrail End TerminalEach $81, 50$ RubrailFt 1, $2, 19$ Asphalt Concrete PavementSqYd 2,755, $8,174, 186$ Asphalt Concrete Approach PavementSqYd 21, $48, 10$ Concrete PavementSqYd 2,493, $11,449, 135$ Concrete Approach PavementSqYd 1, $9, 4$ Concrete Median PavementSqYd 18, $117, 14$ Concrete Driveway PavementSqYd 54, $239, 51$ Concrete SidewalkSqYd 83, $589, 79$ Concrete Retaining WallFt 1, $70, 20$ Pavement Marking, 4" or EquivalentFt 4, $1, 4$ Luminaire PoleEach $167, 22$ Luminaire ArmEach $1, 13$ Signal EquipmentLS $50, 15$3, Signal Pole FootingEach $125, 24$ Luminaire Pole FootingEach $292, 42$ RiprapSqYd 1, $10, 4$ Granular MaterialCuYd 1, $12, 8$ SedimentCuYd 1, $65, 188$ Erosion Control WattleFt 44, $35, 62$ Sediment Filter BagFt 146, $95, 58$ Silt FenceFt 403, $254, 200$ Fire HydrantEach $32, 14$ Tree PlanterEach $3, 7$ Contaminated WaterMGal $4, 4$ Valve BoxEach $5, 7$ Gate ValveEach $18.

5 7$ Water MainFt $ 2$ Beam GuardrailFt 9, $34, 14$ W Beam GuardrailFt $4, 3$ W Beam Guardrail Tangent End TerminalEach $1, 2$ DelineatorEach 8, $135, 32$ Traffic SignEach 61, $1,349, 131$ Extruded Panel SignEach $22, 15$ Luminaire PoleEach $103, 19$ LuminaireEach $ 2$ Signal EquipmentLS $238, 24$9, RiprapTon 9, $195, 17$ PipeFt 1, $17, 8$ Pipe End SectionEach $ 5$ Drop Inlet Frame and Grate AssemblyEach $8, 11$ Fire Hydrant with Valve and BoxEach $2, 2$ 3 Cable Guardrail for ResetFt 1, $2, 5$ High Tension 4 Cable Guardrail for ResetFt 12, $50, 10$ 3 Cable Guardrail Anchor Assembly for ResetEach $15, 12$ High Tension 4 Cable Guardrail Anchor Assembly for ResetEach $17, 10$ Double Thrie Beam Guardrail for ResetFt $1, 5$ Thrie Beam Guardrail for ResetFt $1, 6$ W Beam Guardrail for ResetFt 46, $291, 14$ W Beam to Thrie Beam Guardrail Transition for ResetEach $3, 11$ W Beam Guardrail Breakaway Cable Terminal for ResetEach $2, 5$ 3:35.

6 51 PMPage 3 of 28 Standard Items with average Bid Price for all accepted bidsSouth Dakota Department of TransportationAverage Unit Price ReportItemNumberDescriptionUnit ofMeasureTotalQuantityTotal CostAverageBid PriceBidCnt110E6270 Remove W Beam Guardrail Flared End Terminal for ResetEach $56, 5$ W Beam Guardrail Tangent End Terminal for ResetEach $3, 2$ Rubrail for ResetFt $ 2$ Crossover Closure for ResetFt 4, $14, 11$ Interim Crossover Closure for ResetFt 4, $13, 11$ Road Closure Gate for ResetEach $1, 2$ Gate for ResetEach $36, 9$ Sign for ResetEach $26, 33$ Delineator for ResetEach $1, 6$ Pedestrian Crossing Sign for ResetEach $ 2$ Pipe for ResetFt 4, $115, 43$ Pipe End Section for ResetEach $204, 72$ Cattle Guard for ResetEach $23, 6$2, Drop Inlet Frame and Grate Assembly for ResetEach $22, 24$ Manhole Frame and Lid for ResetEach $8, 6$ Chain Link Fence for ResetFt 2, $13, 11$ Fence for ResetFt 17, $15, 15$ ExcavationCuYd 35,211, $126,056, 326$ ExcavationLS $123, 6$20, Unclassified ExcavationCuYd 128.

7 $521, 4$ Subgrade ToppingCuYd 2,248, $13,525, 32$ Furnished Select Subgrade ToppingCuYd 46, $370, 6$ Borrow ExcavationCuYd 16,222, $73,977, 20$ Furnished Borrow ExcavationCuYd 2,077, $14,977, 232$ Material ExcavationCuYd 10, $584, 45$ ExcavationCuYd 163, $887, 20$ ExcavationCuYd $133, 6$ 4,154, $6,201, 84$ EmbankmentCuYd 96, $924, 8$ DitchSta $68, 12$ for Dust ControlMGal $12, 3$ for Granular MaterialMGal 119, $2,460, 171$ for VegetationMGal 16, $221, 20$ RunTon 116, $1,458, 20$ Control ChlorideLb 44, $21, 6$ PreparationMile $555, 20$2, PreparationMile $26, 4$115, ShapingMile $940, 15$5, Roadway ShapingSqYd 25, $49, 3$ Roadway ShapingSqYd 40, $42, 2$ TopsoilCuYd 4,787, $11,191, 208$ Furnished TopsoilCuYd 225, $3,575, 64$ and Replace TopsoilLS $2,196, 92$23, Old RoadSta $160, 14$ WorkLS $1,840, 98$18, Work, GradingLS $5,777, 171$33, Work, StructureLS $15,471, 161$96, 1, $16, 3$ CourseTon 3,867, $61,725, 264$ Course, SalvagedTon 844, $6,864, 76$ Course, Salvaged Asphalt MixTon 14, $348, 25$ Course.

8 Salvaged, State FurnishedTon 127, $1,403, 6$ Course, State FurnishedTon 22, $312, 5$ CushionTon 1,961, $28,705, 109$ Cushion, SalvagedTon 930, $6,722, 47$ Cushion, Salvaged, State FurnishedTon 374, $2,474, 14$ SurfacingTon 77, $1,289, 35$ Surfacing, SalvagedTon 6, $41, 16$ Surfacing, State FurnishedTon 13, $176, 6$ Material, FurnishTon 279, $3,519, 47$ 3:35:51 PMPage 4 of 28 Standard Items with average Bid Price for all accepted bidsSouth Dakota Department of TransportationAverage Unit Price ReportItemNumberDescriptionUnit ofMeasureTotalQuantityTotal CostAverageBid PriceBidCnt260E6010 Granular MaterialTon 79, $1,627, 38$ and Stockpile Asphalt Mix MaterialTon 105, $987, 19$ and Stockpile Asphalt Mix and Granular Base MaterialTon 1,480, $12,544, 65$ Asphalt Mix and Granular Base MaterialTon 33, $179, 4$ and Stockpile Granular MaterialTon 420, $1,374, 55$ , Haul.

9 And Stockpile Granular MaterialTon 260, $1,443, 19$ and Stockpile Granular MaterialTon 80, $696, 11$ and Stockpile Granular MaterialTon 342, $2,025, 32$ Depth ReclamationSqYd 89, $165, 4$ 58-28 Asphalt BinderTon 16, $7,436, 28$ 58-34 Asphalt BinderTo