1 CONSTRUCTION MANUAL STANDARD DRAWINGS AND GENERAL TECHNICAL SPECIFICATIONS irvine ranch water district CONSTRUCTION MANUAL FOR THE CONSTRUCTION OF water , SEWER AND RECYCLED water FACILITIES Kevin L. Burton, Executive Director of Engineering and water Quality JANUARY 2019 TABLE OF CONTENTSS tandard DrawingsNUMBERDESCRIPTIONDATEW-11" Copper ServiceJanuary 2019W-22" Copper ServiceJanuary 2019W-31" or 2" Service Connection for PVC, Steel, ACP and DIPJ anuary 2019W-41" or 2" Service ManifoldJanuary 2019W-53", 4", 6", 8" and 10" Meter AssemblyJanuary 2019W-6 Double Check Backflow Assembly.
2 3" and LargerJanuary 2019W-7 Reduced Pressure Principle Backflow AssemblyJanuary 2019W-8 Fire HydrantJanuary 2019W-9 Recycled water Wharf Head HydrantJanuary 2019W-10 water Sample StationJanuary 2019W-111" or 2" Air Release and Vacuum ReliefJanuary 2019W-12 Temporary Flush-out AssemblyJanuary 2019W-13 Flush-out AssemblyJanuary 2019W-14 Blow off / Bottom Drain AssemblyJanuary 2019W-15 Pressure Regulating Station (PRV)January 2019W-16 Thrust BlockJanuary 2019W-17 water TrenchJanuary 2019W-18<Not Used>W-19 Cut-in Tee for PVC, DIP and ACP MainsJanuary 2019W-20 Mortar Lined and Coated Steel Pipe JointsJanuary 2019W-21 Steel Casing for water PipeJanuary 2019W-22 Valve BoxJanuary 2019W-23 Valve Stem ExtensionJanuary 2019W-24 Pipe SupportJanuary 2019S-1 ManholeJanuary 2019S-2<Not Used>S-3 Sewer LateralJanuary 2019S-4 Cut-in Wye ConnectionJanuary 2019S-5 Terminal CleanoutJanuary 2019S-6 Sewer TrenchJanuary 2019S-7 Steel Casing for Sewer PipeJanuary 2019CP-1 Two Wire Test StationJanuary 2019CP-2<Not Used>CP-3 Casing Test StationJanuary 2019CP-4 Insulator Test StationJanuary 2019CP-5 Cathodic Protection
3 Rectifier and Shunt PanelJanuary 2019CP-6 Test Box, Wiring, and Identification TagsJanuary 2019CP-7 Test Box LocationsJanuary 2019CP-8 Alumino-Thermic (CAD) WeldingJanuary 2019CP-9 Bonding for Pipe Joints and FittingsJanuary 2019CP-10 Insulating JointsJanuary 2019G-1 Removable Guard PostJanuary 2019G-2 Utility MarkerJanuary 2019G-3 Access GateJanuary 2019G-4 Retaining WallJanuary 2019G-5 Vault LadderJanuary 2019G-6 Vault SumpsJanuary 2019G-7 Vault VentJanuary 2019G-82-1/2" < Wall Penetration < 4"January 2019G-9 Wall Penetration 4"January 2019G-10 Concrete Slope AnchorsJanuary 2019 WaterSewerCathodic ProtectionGeneralTABLE OF CONTENTSW ater STANDARD DrawingsNUMBERDESCRIPTIONDATEW-11" Copper ServiceJan 2019W-22" Copper ServiceJan
4 2019W-31" or 2" Service Connection for PVC, Steel, ACP and DIPJan 2019W-41" or 2" Service ManifoldJan 2019W-53", 4", 6", 8" and 10" Meter AssemblyJan 2019W-6 Double Check Backflow Assembly, 3" and LargerJan 2019W-7 Reduced Pressure Principle Backflow AssemblyJan 2019W-8 Fire HydrantJan 2019W-9 Recycled water Wharf Head HydrantJan 2019W-10 water Sample StationJan 2019W-111" or 2" Air Release and Vacuum ReliefJan 2019W-12 Temporary Flush-out AssemblyJan 2019W-13 Flush-out AssemblyJan 2019W-14 Blow off / Bottom Drain AssemblyJan 2019W-15 Pressure Regulating Station (PRV)Jan 2019W-16 Thrust BlockJan 2019W-17 water TrenchJan 2019W-18<Not Used>W-19 Cut-in Tee for PVC.
5 DIP and ACP MainsJan 2019W-20 Mortar Lined and Coated Steel Pipe JointsJan 2019W-21 Steel Casing for water PipeJan 2019W-22 Valve BoxJan 2019W-23 Valve Stem ExtensionJan 2019W-24 Pipe SupportJan 2019 TABLE OF CONTENTSS ewer STANDARD DrawingsNUMBERDESCRIPTIONDATES-1 ManholeJan 2019S-2<Not Used>S-3 Sewer LateralJan 2019S-4 Cut-in Wye ConnectionJan 2019S-5 Terminal CleanoutJan 2019S-6 Sewer TrenchJan 2019S-7 Steel Casing for Sewer PipeJan 2019 TABLE OF CONTENTS Cathodic Protection STANDARD DrawingsNUMBERDESCRIPTIONDATECP-1 Two Wire Test StationJan 2019CP-2<Not Used>CP-3 Casing Test StationJan 2019CP-4 Insulator Test StationJan 2019CP-5 Cathodic Protection Rectifier and Shunt PanelJan 2019CP-6 Test Box, Wiring, and Identification TagsJan 2019CP-7 Test Box LocationsJan 2019CP-8 Alumino-Thermic (CAD)
6 WeldingJan 2019CP-9 Bonding for Pipe Joints and FittingsJan 2019CP-10 Insulating JointsJan 2019 TABLE OF CONTENTS GENERAL STANDARD DrawingsNUMBERDESCRIPTIONDATEG-1 Removable Guard PostJan 2019G-2 Utility MarkerJan 2019G-3 Access GateJan 2019G-4 Retaining WallJan 2019G-5 Vault LadderJan 2019G-6 Vault SumpsJan 2019G-7 Vault VentJan 2019G-82-1/2" < Wall Penetration < 4"Jan 2019G-9 Wall Penetration 4"Jan 2019G-10 Concrete Slope AnchorsJan 2019 TABLE OF CONTENTSG eneral TECHNICAL SpecificationsSECTIONDESCRIPTIONDATE0104 5 Existing Facilities1/2/201702100 Clearing and Preparation4/1/201002201 Earthwork and Grading1/9/201902220 Structure Earthwork4/1/201002223 Trenching, Backfilling, and Compacting6/16/201502315 Jacked Casing1/9/201902316 Open Trench Casing1/9/201902528 Concrete Curbs, Gutters.
7 And Sidewalks4/1/201002578 Pavement Removal and Replacement1/9/201902701 Installation of Gravity Sewer Pipelines1/2/201702710 Vitrified Clay Pipe for Gravity Sewers4/1/201002715 PVC Pipe and Fittings for Gravity Sewers1/9/201903100 Concrete Formwork12/9/200403201 Concrete Reinforcement7/8/200803260 Concrete Joints and Waterstops1/4/201603300 Concrete1/9/201903345 Concrete Finishing, Curing, and Waterproofing1/9/201903461 Precast Concrete Manholes and Bases1/9/201903462 Precast Concrete Vaults and Meter Boxes1/9/201905120 Structural Steel and Miscellaneous Metalwork1/9/201909900 Painting and Coating1/9/201915040 Interior Inspection for Cement-Mortar Lined Steel Pipe1/2/201715041 Chlorination of water Mains.
8 Wells and Reservoirs1/2/201715042 Hydrostatic Testing of Pressure Pipelines1/9/201915043 Leakage and Infiltration Testing1/9/201915051 Installation of Pressure Pipelines1/2/201715053 Carbon Steel Pipe and Fittings1/2/201715056 Ductile-Iron Pipe and Fittings1/9/201915057 Copper Pipe and Fittings1/2/201715064 PVC Pressure Pipe and Fittings1/2/201715076 Cement-Mortar Lined and Coated Steel Pipe1/9/201915089 Combination Air Release and Vacuum Relief Valves1/2/201415100 Manual Valves1/9/201915112 Backflow Preventers1/2/201715120 Hydraulically Controlled Diaphragm-Actuated Valves1/2/201715139 Hydrants1/4/201615150 Meters1/4/2016 Revised 01/09/20191 TABLE OF CONTENTSG eneral TECHNICAL SpecificationsSECTIONDESCRIPTIONDATE1515 1 Facilities Identification1/9/201915162 Flexible Pipe Couplings and Expansion Joints1/9/201916010 GENERAL Electrical Requirements1/4/201616051 Miscellaneous Electrical Devices2/15/200516110 Raceways, Pull Boxes.
9 And Fittings7/23/201216120 Conductors and Cables1/4/201616135 Cabinets and Enclosures12/21/200416140 Switches and Receptacles1/4/201616150 Electric Motors3/5/201216155 Low-Voltage Motor Control1/9/201916160 Panelboards1/4/201616400 Service and Distribution1/24/200516418 Variable Frequency Drives Below 100 HP12/28/200416443 Low-Voltage Switchboards1/9/201916450 Grounding1/4/201616460 Transformers1/4/201616500 Lighting12/21/200416620 Manual Transfer Switch1/21/200516625 Automatic Transfer Switch1/24/200516640 Cathodic Protection and Joint Bonding1/2/201716650 Telemetry Cable System1/24/200516700 Telephone Utility Equipment12/21/200416950 Electrical Testing12/21/200417000 GENERAL Instrumentation Control Requirements1/4/201617110 Identification Tags2/26/200517200 Miscellaneous Instrumentation Equipment1/2/201717300 PLC s and Programmable Operator Interfaces 1/9/201917350 Telemetry and Control Systems Communications Equipment1/9/201917360 Fiber-Optic Data Transmission System2/27/200517500 Uninterruptible Power Supply1/4/2016 Revised 01/09/20192 EXISTING FACILITIES 01045 - 1 Revised 01/02/2017 SECTION 01045.
10 EXISTING FACILITIES PART 1 - GENERAL A. Description This section includes requirements for connection to and abandonment of existing water and sewer facilities. B. Related Work Specified Elsewhere 1. Trenching, Backfilling, and Compacting: 02223 2. Chlorination of water Mains, Wells and Reservoirs: 15041 3. Hydrostatic Testing of Pressure Pipelines: 15042 4. Leakage and Infiltration Testing: 15043 5. Manual Valves: 15100 C. Location The Contractor shall be responsible for determining in advance of constructing the improvements the location of all existing pipelines to which connections are to be made.