Example: bankruptcy

STANDARD SEWER AND WATER MAIN SPECIFICATIONS

Revised: July 1, 2014; Purnima Dharia, William Patalano THE city OF NEW york department OF environmental protection bureau OF WATER AND SEWER OPERATIONS STANDARD SEWER AND WATER main SPECIFICATIONS JULY 1, 2014 Revised: July 1, 2014; Purnima Dharia, William Patalano NO TEXT ON THIS PAGE Revised: July 1, 2014; Purnima Dharia, William Patalano i TABLE OF CONTENTS DIVISION I GENERAL PROVISIONS Section 10 Definitions And General Provisions I-3 Definition Of Terms I-3 Sewers, WATER Mains, Etc., To Be Built As Shown On The Contract Plans I-3 Means And Methods Of Construction I-4 Hours Of Work I-4 Adjusting Existing Pavements, Sidewalks, Etc.

department of environmental protection bureau of water and sewer operations standard sewer and water main specifications ... protection system 60.31 water mains in jacked steel sleeves vi-34 ... the city of new york department of environmental protection bureau of water and sewer operations . revised: july 1, ...

Tags:

  York, Department, Standards, Protection, Water, City, Bureau, Main, Environmental, Sewer, Standard sewer and water main, Department of environmental protection bureau of water, New york department of environmental protection bureau of water

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of STANDARD SEWER AND WATER MAIN SPECIFICATIONS

1 Revised: July 1, 2014; Purnima Dharia, William Patalano THE city OF NEW york department OF environmental protection bureau OF WATER AND SEWER OPERATIONS STANDARD SEWER AND WATER main SPECIFICATIONS JULY 1, 2014 Revised: July 1, 2014; Purnima Dharia, William Patalano NO TEXT ON THIS PAGE Revised: July 1, 2014; Purnima Dharia, William Patalano i TABLE OF CONTENTS DIVISION I GENERAL PROVISIONS Section 10 Definitions And General Provisions I-3 Definition Of Terms I-3 Sewers, WATER Mains, Etc., To Be Built As Shown On The Contract Plans I-3 Means And Methods Of Construction I-4 Hours Of Work I-4 Adjusting Existing Pavements, Sidewalks, Etc.

2 I-5 Tree Preservation, protection , Removal And Replacement I-5 Encumbrances I-6 Disposal Of Excess Excavated Material I-6 Lines And Grades (Contractor s Survey Party) I-6 Preservation Of Points, Stakes, Etc. I-7 Contractor Not To Disturb city Monuments I-7 Right To Construct Sewers, WATER Mains, House Connections, Etc. I-8 Flow Of Sewers And Drains, Etc. Interrupted; Sewers To Be Kept Clean; I-8 Removing And Abandoning Sewers, WATER Mains, Etc. city Not Responsible For Accuracy Of Subsurface Records Or Information I-10 Notice To Utility Companies, Etc., To Remove Structures Occupying I-11 Place Of Sewers, WATER Mains Or Appurtenances Notice To Utility Companies, Etc.

3 , To Support, Protect, Temporarily I-11 Remove And Replace Structures Within Limits Of Ordered Excavation Contractor To Make Or Entertain Offer To Protect, Support, Temporarily I-12 Remove And Replace, Pipes And Other Structures Of Private Companies Or Individuals Contractor To Protect Gas Mains, Conduits, Subways, Steam Pipes, Etc., I-12 Owned By Private Companies Along And Outside Of The Line Of Ordered Excavation Gas Cost Sharing Work (EP-7) I-12 Contractor Approves Drawings And SPECIFICATIONS As Involving I-12 No Damage To city Property Or To Private Buildings Contractor To Notify city Departments I-13 Cost Of Permanent Removal Of city Structures I-13 Contractor Agrees To Protect city Structures Within The Limits Of, Along, I-13 And Outside The Limits Of Ordered Excavation Damaged WATER Service Pipes To Be Repaired By A Licensed Plumber I-14 Contractor To Carry Out Agreement Between city And Railroad Company I-14 Or Property Owner(s)

4 Materials On Private Property I-14 Safe And Healthful Working Conditions I-14 Salvageable Materials I-15 Material On Public Property I-15 Contractor To Provide For Traffic I-15 Contractor To Give Notice To And Cooperate With city Departments And I-15 Utility Companies Photographs I-16 Boring Records I-17 Use Of WATER Mains And Appurtenances I-17 First Class Material And Workmanship I-17 Urgent Repairs I-18 Revised: July 1, 2014; Purnima Dharia, William Patalano ii 11 Surface Restoration Under Maintenance Guarantee I-18 Contractor To Keep Informed Of Condition Of Pavement I-18 Contractor To Make Repairs I-18 Amount Deposited As Guarantee To Be Used For Restoration If Necessary I-18 Remedy Of Defects I-19 Payment Of Amount Deposited I-19 Deductions From Partial Payments I-19 Underground Facilities I-19 Date For Completion Of Surface Restoration For Project I-20 12 Miscellaneous Provisions I-20 Labor I-20 Vendors I-20 Permits I-20 Temporary Use Of city WATER On Construction Projects I-20 Roadway Openings, Use, Storage, Etc.

5 I-21 Processing Of Substantial Or Final Payment I-21 Submittal Of Schedule Log I-21 DIVISION II MATERIALS OF CONSTRUCTION Notice To The Contractor II-3 Section SPECIFICATIONS For Ductile Iron Pipe And Accessories (Section ) II-3 SPECIFICATIONS For Ductile Iron Fittings And Accessories (Section ) II-3 STANDARD SPECIFICATIONS For Butterfly Valves 24-Inch To 72-Inch II-3 With Manual Actuators (Section ) STANDARD SPECIFICATIONS For Pressure Reducing Valves 8-Inch II-3 Through 30-Inch Nominal Pipe Size (Section ) STANDARD SPECIFICATIONS For Resilient-Seated 3-Inch Through 20-Inch II-3 Gate Valves With Various End Connections And 3-Inch Through 12-Inch Tapping Valves (Section ) STANDARD SPECIFICATIONS For Double Disc 3-Inch To 20-Inch Gate Valves II-3 With Various End Connections For WATER Supply System (Section ) STANDARD Specification For Iron Castings (Section ) II-3 STANDARD SPECIFICATIONS For Dry-Barrel Fire Hydrants And Extension Kits II-3 (Section ) STANDARD SPECIFICATIONS For Stainless Steel Tapping Sleeves With Branch II-3 Connections For Flanged Tapping Valve Or Mechanical Joint Tapping Valve (Section )

6 SPECIFICATIONS For Corporation Stops And Quarter Bends (Section ) II-3 SPECIFICATIONS For Trunk main Work II-3 Definitions II-4 Vitrified Clay Pipe II-6 Cast Iron Pipe II-8 Cast Iron Soil Pipe II-9 Precast Reinforced Concrete Pipe II-11 Ductile Iron Pipe II-13 Joint Materials For Pipe II-16 Polymer Concrete Pipe II-17 Iron Castings, Gray And Malleable II-20 Wrought Iron II-21 Galvanizing II-21 Steel Castings II-22 Aluminum Grating II-23 Concrete II-25 Brick II-31 Mortar, Portland Cement II-32 Revised: July 1, 2014; Purnima Dharia, William Patalano iii Grout, Portland Cement II-33 Structural, Reinforcing And Miscellaneous Steel II-34 Timber And Lumber II-36 Granite Slabs II-36 Steel Sheeting II-37 Timber Piles II-37 Wood Preservative And Treatment II-39 House Service Connections II-40 Polyethylene Sleeve II-41 Filter Fabric II-41 Waterstops II-42 Waterproofing II-43 Neoprene Pad II-43 Backfill Material II-44 Riprap; Stone Ballast; Screened Gravel And Screened Broken Stone; II-45 Broken Stone; Slope Pavement.

7 And Crushed Stone DIVISION III INSPECTION OF MATERIALS, SAMPLING AND METHOD OF TEST Section Inspection Of Materials III-3 Sampling III-4 Methods Of Test III-5 Inspection, Sampling And Testing Of WATER main Materials III-9 DIVISION IV GENERAL CONSTRUCTION PROVISIONS Section Scope Of Work IV-3 Trenches-General IV-3 Earth Excavation IV-10 Excavation Of Boulders In Open Cut IV-12 Sheeting And Bracing IV-12 Backfilling IV-18 Construction Of Adjacent Conduits And/Or Pipes In The Same Trench IV-26 Temporary Restoration And Cleaning Up IV-27 Final Restoration Of Pavements IV-29 Project Sign, Project Rendering Sign And Temporary Notification Signs IV-31 Leakage And Leakage Tests For SEWER Lines IV-31 Crushed Stone Bedding For Sewers IV-33 Prices To Cover IV-34 DIVISION V CLASSIFIED SECTIONS OF SEWER WORK Section Reinforced Concrete Sewers V-3 Precast Reinforced Concrete Pipe Sewers V-9 Vitrified Pipe Sewers V-13 Ductile Iron Pipe Sewers V-17 Cast Iron Pipe Sewers V-22 Sewers In Jacked Steel Sleeves V-26 Direct Jacked Precast Concrete Pipe Sewers V-38 Reconstruction Of Existing Sewers Using Approved V-52 Cured-In-Place-Pipe (CIPP)

8 Lining Method Reconstruction Of Existing Sewers Using Shotcrete Method V-59 Reconstruction Of Existing Sewers Using Cement Lining Method V-70 Chambers V-73 Manholes V-77 Revised: July 1, 2014; Purnima Dharia, William Patalano iv Reconstruction of Existing Manholes V-83 Replacement Of Existing Manhole Frame And Cover V-85 Drop-Pipe Manholes V-87 Catch Basins V-93 Incremental Cost Of ( STANDARD Type 3 Or Other Kind And Number) Catch V-99 Basin In Lieu Of ( STANDARD Type 1 Or STANDARD Type 2 Or Other Kind And Number) Catch Basin Precast Seepage Basins V-100 Outfall Structures V-104 Modification Of Existing Structures V-107 Catch Basin Connections V-111 Risers For House Connections V-115 Spurs For House Connections V-117 House Connection Drains V-122 Removal Of Protruding Service Connections V-127 Re-Opening Of Service Connections V-128 Television Inspection And Digital Audio-Visual Recording Of Sewers V-129 SEWER Cleaning V-134 Cleaning Of Drainage Structures V-136 Cleaning Of Existing Ductile Iron Or Cast Iron Sewers V-137 Portland Cement (Type V)

9 - Injection Grouting V-140 Shotcrete For Repair Work V-141 Abandoning Basins And Inlets V-143 DIVISION VI CLASSIFIED SECTIONS OF WATER main WORK Section Furnishing And Delivering Ductile Iron Pipe VI-3 Laying Ductile Iron Pipe And Fittings VI-5 Furnishing And Delivering Ductile Iron Fittings VI-18 Furnishing, Delivering And Laying Steel Pipe And Appurtenances VI-21 Furnishing, Delivering And Laying Straight Steel Pipe VI-21 Furnishing, Delivering And Laying Steel Bends And Reducers VI-22 Furnishing, Delivering And Installing Steel Tees VI-24 Furnishing, Delivering And Installing Steel Bulkheads VI-26 Furnishing, Delivering And Installing Plate Steel Outlets On Steel Pipe VI-27 Furnishing, Delivering And Installing Steel Manifolds VI-28 Furnishing, Delivering And Installing Couplings VI-29 Furnishing, Delivering And Installing Special Appurtenances VI-32 Furnishing, Installing And Testing Corrosion Control And/Or Cathodic VI-33 protection System WATER Mains In Jacked Steel Sleeves VI-34 Furnishing And Delivering Gate Valves VI-45 Setting Gate Valves VI-48 Furnishing, Delivering And Installing Butterfly Valves And Expansion Joints VI-51 Furnishing, Delivering And Installing Pressure Regulator (Reducing)

10 Valves VI-54 Furnishing And Delivering Hydrants VI-56 Setting Hydrants VI-57 Removing Hydrants VI-62 Furnishing, Delivering And Installing Hydrant Fenders VI-63 Furnishing And Delivering Various Castings; Etc. VI-64 Withdrawing And Replacing House Services VI-65 Extending House Service WATER Connections; And, Cutting And Offsetting VI-67 House Service WATER Connections Furnishing, Delivering And Installing Wet Connection Sleeves VI-71 Furnishing, Delivering And Installing Bands, Rods, Washers, Nuts And Bolts VI-72 Furnishing And Placing Polyethylene Sleeve VI-73 Furnishing, Delivering And Placing Filter Fabric VI-75 Revised: July 1, 2014; Purnima Dharia, William Patalano v Furnishing, Delivering And Installing Pipe-To-Wall Penetration Seal VI-76 Furnishing And Placing Concrete VI-78 Furnishing, Delivering And Placing Structural, Reinforcing And VI-80 Miscellaneous Steel Furnishing, Delivering And Placi


Related search queries