Example: barber

Step-by-Step Installation

1/8 5/16 1/4 3/8 3/16 3/8 1/4 9/16 1/4 7/16 5/16 9/16 If desired, Quick-Connect posts may be through drilled at1/4 (5/16 if 1/4 cable) andthen counter-bored with therecommended Quick-Connect drill to countersink the Beveled Washers for stair termination posts with angled holes. Available for Threaded Terminal and Quick-Connect Inset fittings. Always install the Connect Insetfittings in the top stair post to prevent rain water fromrunning down the cable into the CHECKLISTS afety GlassesWork GlovesPencilMeasuring Ta p eElectric DrillDrill BitsHammerCable CuttersVise-Grip Pliers7/16'' WrenchElectric Grinder withGrinding Disk& Cut-off DiskHacksaw or Electric Reciprocating SawCable Lacing NeedleFeeney TensionGaugeMark drill hole locationson posts. To minimize cabledeflection, spacecables no more than 3inches apart and have apost or vertical spacerat least every 3 , straight runs ofcable (no turns/dips)should not exceed 70feet.

tensioning sequence Tension the cables by ... securely bolt or screw to joists or deck surface. Double Corner Posts: If possible use double corner posts to allow the cable to run continuously through the corners without terminating (see single corner post option below).

Tags:

  Bolt, Tensioning

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Step-by-Step Installation

1 1/8 5/16 1/4 3/8 3/16 3/8 1/4 9/16 1/4 7/16 5/16 9/16 If desired, Quick-Connect posts may be through drilled at1/4 (5/16 if 1/4 cable) andthen counter-bored with therecommended Quick-Connect drill to countersink the Beveled Washers for stair termination posts with angled holes. Available for Threaded Terminal and Quick-Connect Inset fittings. Always install the Connect Insetfittings in the top stair post to prevent rain water fromrunning down the cable into the CHECKLISTS afety GlassesWork GlovesPencilMeasuring Ta p eElectric DrillDrill BitsHammerCable CuttersVise-Grip Pliers7/16'' WrenchElectric Grinder withGrinding Disk& Cut-off DiskHacksaw or Electric Reciprocating SawCable Lacing NeedleFeeney TensionGaugeMark drill hole locationson posts. To minimize cabledeflection, spacecables no more than 3inches apart and have apost or vertical spacerat least every 3 , straight runs ofcable (no turns/dips)should not exceed 70feet.

2 Runs with corners(2 bends at most)should not exceed 40feet. See Basic FrameDesign on back page.(Metal posts only)Insert Isolation Bushingsor Grommets (optional),into their correspondingpost : call forspecial drill hole sizes.(Wood posts only)Insert Protector Sleevesat necessary in until flush. Protector Sleevesprevent abrasion atangled transitions onwood posts ( stairtransition posts oroutside faces of double corner posts).Lace the free end ofthe cable through theintermediate postsand Quick-Connect end post. Slide-ona flat washer andQuick-Connect Insetfitting until they restagainst the face of a Lacing Needle if snagging becomes a problem. Drill holes in posts. Holediameter depends oncable size and type offitting. See chart the Quick-Connect Insetfitting with one handand pull the cabletight with the fittingautomatically lockswhen you release the cable.

3 CableRail TensioningTool #6005-pkg maybe cable cutters orelectric grinder withcut-off disk to trim theexcess cable. Grindflush the exposedcable ends with anelectric on end capsover the exposedQuick-Connect Insetfittings and theSnug-Grip Washer Nuts. You re SteelProtect can be applied forlasting protection ofstainless steel cableand can either terminate or run through corner postsWOOD POSTS*SINGLE PIPE*DOUBLE PIPEANGLE IRONDOUBLE FLAT BAR12345678910 TerminatingContinuous*Offset drill holes at least 1/2'' if you choose to have cables terminating at a single wood or pipe Installation 2017 Feeney 2014-682 CInsert the ThreadedTerminal through theTerminal end post andattach a flat washer andSnug-Grip Washer the nut 2 full resistance will befelt as the Snug-Grip threads engage.

4 So hold theTerminal shaft with : Metal assemblieshave Nylon Flat Washersin both white and the color that bestmatches your railing cable tensioning sequence Tension the cables byholding the ThreadedTerminal shaft with Vise-Grip pliers and spinningthe Snug-Grip WasherNuts with a wrench. AFeeney Tension Gaugemay be used to checkuniform tension. See tensioning sequence diagram at hacksaw, reciprocatingsaw, or electric grinderwith cut-off disk to sawoff the excess threads asclose to the Snug-Grip Washer Nut as with electricgrinder. The specialSnug-Grip threadsprevent the nut Note: If using electric or pneumatic tools to tighten the Washer Nuts,spin the nuts very slowly otherwise they will heat up causing the threads to SizeThreaded :Maximum 3inches : Size all intermediateposts as required for top rail supportstrength or for Rail: Always include a strong, rigid toprail that is securely fastened to allposts.

5 Minimum recommendedsize is 2 x 6 wood. Set railingheight per local code. Spacing From Walls: Set end posts 3 to 4 inches away from thehouse/wall face to allow access for attachingcable end Posts: Use minimum end post sizes noted above, andsecurely bolt or screw to joists or deck Corner Posts: If possible use double corner posts to allow the cableto run continuously through the corners withoutterminating (see single corner post option below).Securely bolt or screw posts to joists or deck surfaceand use minimum corner post sizes noted Post Spacing:Space all posts and verticalspacers (see below)a maximumof 3 feet apart to minimize anydeflection that may occur if thecables are ever forced Rails (OPTIONAL):Bottom rails should be spaced nomore than 4 inches above thedeck surface, or as required bylocal code, and should be sizedas needed for support strengthand design Corner Post (OPTIONAL):In most cases with single corner posts cables must be terminated.

6 Exceptionsare angle iron posts or tubular metal posts. When terminating on a single cornerpost, be sure to offset the drill holes at least 1/2'' to allow internal clearance forthe cable fittings. Use minimum end post sizes noted above and securely bolt orscrew to joists or deck 3 FEETMAX. 3 FEETThe Basic Frame DesignAnd Some Other OptionsCableSpacing:Maximum 3inches cables no morethan 3 inches apartSpace posts/verticals nomore than 3 feet apartObserve minimumend/corner post sizesshown aboveSecurely fasten all posts and top railsCarefully plan alltermination and corner posts for properclearance, positioning,and maximum cable run lengthsStraight runs of cable (no turns/dips) should not exceed 70 feet; runs with corner bends (2bends at most) should not exceed 40 feetFrame RequirementsIMPORTANT NOTEFor railings we recommendspacing the cables nomore than 3 inches apartand placing posts orvertical members no morethan 3 feet apart.

7 Please note that sincebuilding codes vary bystate, county and city, our recommendations may not comply with coderequirements in all areas. Always consult with yourlocal building departmentbefore starting your sizes for all corner and end postsAll other posts should be sized as required for cap rail support strength or for codeFLAT BAR2'' wide, 1'' thick ANGLE IRON2'' wide, 1/2'' thickEXTRA STRONG PIPE1-1/2'' ID, 1-7/8'' ODSQUARE TUBE 2'' wide, 1/4'' wall4X4 WOOD3-1/2'' wide, 3-1/2'' thickNote: Softer woods mayrequire larger post sizes,especially for 42 high railings Railing frames need to be designed and built strong enough to support the tension of properly installed cables,which is a load in excess of 300 lbs for each cable. Here are some basic guidelines to help you properly prepareyour railing frames.

8 These guidelines apply whether you are using 1/8'', 3/16'' or 1/4'' cable (1/4'' cable notrecommended for wood frames).Wood Blocking(WOOD FRAMES ONLY):Underneath the toprail attach minimum1 x 4 wood blockingbetween posts toprovide additionallateral reinforcementto the posts so thatthey won t pull out ofplumb when thecables are Spacers (OPTIONAL):Slender spacers may be used instead of some of the larger intermediate posts to achievea more open railing design. These are non-structural members and are only intended tomaintain cable spacing and minimize deflection. Examples are 2 x 2 wood strips, 1 metal tubing, 1/4 flat bar, or Feeney Intermediate Pickets. Attach spacers to the top rail and either the bottom rail, deck surface or joists.


Related search queries