Example: tourism industry

Storm Water Permanent Best Management …

Storm Water Permanent best Management practices manual State of Hawaii Department of Transportation Highways Division March 2007. THIS PAGE INTENTIONALLY LEFT BLANK. Storm Water Permanent best Management practices manual State of Hawaii Department of Transportation Highways Division March 2007. THIS PAGE INTENTIONALLY LEFT BLANK. TABLE OF CONTENTS. TABLE OF CONTENTS .. i DEFINITIONS OF KEY TERMS .. v ACRONYMS .. ix xi CHAPTER 1: ENVIRONMENTAL BACKGROUND AND INTRODUCTION ..1-1. Environmental Introduction to this CHAPTER 2: APPLICABILITY.

Storm Water Permanent Best Management Practices Manual State of Hawaii Department of Transportation Highways Division March 2007

Tags:

  Manual, Practices, Management, Best, Water, Permanent, Water permanent best management, Water permanent best management practices manual

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Storm Water Permanent Best Management …

1 Storm Water Permanent best Management practices manual State of Hawaii Department of Transportation Highways Division March 2007. THIS PAGE INTENTIONALLY LEFT BLANK. Storm Water Permanent best Management practices manual State of Hawaii Department of Transportation Highways Division March 2007. THIS PAGE INTENTIONALLY LEFT BLANK. TABLE OF CONTENTS. TABLE OF CONTENTS .. i DEFINITIONS OF KEY TERMS .. v ACRONYMS .. ix xi CHAPTER 1: ENVIRONMENTAL BACKGROUND AND INTRODUCTION ..1-1. Environmental Introduction to this CHAPTER 2: APPLICABILITY.

2 2-1. Scope ..2-1. Unified Redevelopment ..2-1. Applicable Projects (Statewide) ..2-2. Projects within HDOT's Projects Requiring a Discharge/Connection (to DOT's MS4) Permit ..2-2. Special Conditions ..2-2. Permanent BMP CHAPTER 3: EXEMPTIONS AND VARIANCES ..3-1. Specific Runoff Conditions ..3-1. Utility Other Variances ..3-1. CHAPTER 4: Permanent BMP CONSIDERATION IN PROJECT PLANNING AND. DESIGN PHASE ..4-1. Introduction ..4-1. Storm Water Permanent BMP Concepts in Project Planning Phase ..4-1. Purpose.

3 4-1. When to Develop Concept ..4-1. Concept Development ..4-1. Content of Permanent BMP Planning Concept Report ..4-2. Review and Approval ..4-3. Storm Water Permanent BMP in Project Design Phase ..4-3. Permanent BMP Conceptual Design Content of Permanent BMP Design Review and Approval ..4-4. CHAPTER 5: Storm Water QUANTITY CONTROL ..5-1. HDOT Highways Hydrologic Design Criteria ..5-1. Recurrence Interval ..5-1. State of Hawaii i Department of Transportation Highways Division Storm Water Permanent BMP manual March 2007.

4 Design Drainage Hydraulic Design Criteria ..5-3. Roadway Physical Standards ..5-5. CHAPTER 6: Storm Water QUALITY Water Quality Criteria ..6-1. Objectives of Water Quality Criteria ..6-1. Management practices to Meet Additional Requirements ..6-1. Detention Based Water Quality Control ..6-1. Design Volume ..6-1. Runoff Coefficient ..6-2. Detention Time ..6-3. Short-circuiting ..6-3. Outlet Flow-Through Based Water Quality ..6-3. Runoff Design Storm Size (Hourly Rainfall Intensity) ..6-4. Flow Calculation.

5 6-4. Water Quality Design Standards ..6-4. Detention Based Storm Water Quality Control Facilities ..6-4. Flow-Through Based Storm Water Quality Control Flow-Through Based Treatment Upstream of Detention Based Treatment6-5. CHAPTER 7: Storm Water Permanent BMP OPTIONS ..7-1. Storm Water Quality Treatment ..7-3. Dry Swale ..7-5. Wet Infiltration Infiltration Basin ..7-17. Bioretention ..7-21. Shallow Wetland ..7-25. Pocket Wetland ..7-29. Wet Extended Detention Pond ..7-33. Wet Pond ..7-39. Surface Sand Filter.

6 7-45. Underground Sand Organic Sand Filter ..7-53. Structural , Hydrodynamic and other proprietary Soil Stabilization ..7-59. Preservation of Existing Seeding and Planting ..7-63. Geotextiles and Vegetated Buffer Strips and Storm Water Flow Earth Dikes, Drainage Swales, and Lined State of Hawaii ii Department of Transportation Highways Division Storm Water Permanent BMP manual March 2007. Slope Drains and Subsurface Drains ..7-81. Top and Toe of Slope Diversion Ditches/Berms ..7-83. Outlet Protection and Velocity Dissipation Devices.

7 7-85. Flared Culvert End Slope Roughening, Terracing, and Level Spreader ..7-91. CHAPTER 8: INSPECTION, MAINTENANCE, AND RECORD KEEPING ..8-1. Site Inspection During Construction ..8-1. Vegetative Swales ..8-1. Infiltration Facilities ..8-1. Storm Water Storm Water Filtering Systems ..8-2. Proprietary Hydrodynamic Type BMPs ..8-2. As-Built Certification & Acceptance of Permanent BMPs ..8-2. BMP Inspections After Construction ..8-3. BMP Maintenance ..8-3. Record Keeping ..8-3. State of Hawaii iii Department of Transportation Highways Division Storm Water Permanent BMP manual March 2007.

8 THIS PAGE INTENTIONALLY LEFT BLANK. State of Hawaii iv Department of Transportation Highways Division Storm Water Permanent BMP manual March 2007. DEFINITIONS OF KEY TERMS. 303(d) LIST Under section 303(d) of the Clean Water Act, states are required to compile a list of impaired waters that fail to meet any of their applicable Water quality standards or cannot support their designated or existing uses. This list, called a 303(d). list , is submitted to Congress every two years. States are required to develop a Total Maximum Daily Load (TMDL) for each pollutant causing impairment for Water bodies on the list.

9 best Management PRACTICE (BMP) According to CFR , schedules of activities, prohibitions of practices , maintenance procedures, and other Management practices to prevent or reduce the pollution of 'waters of the Unites States'. CONTRACT PROJECT A construction project, which is designed either by HDOT. Highways personnel or by engineering consultant firms, and is constructed by a private contractor. DETENTION VOLUME The volume of runoff that is held and treated in a BMP. structure. DISCHARGE RATE The rate at which Water is discharged out of the BMP after being stored and treated.

10 DRAINAGE AREA The specific land area that drains Water into a river system or other body of Water . Drainage area also refers to the drainage basin or watershed. ENCROACHMENT PROJECT A construction project undertaken by a non-HDOT. entity ( third party) within the HDOT Highways right-of-way and requires the issuance by HDOT Highways of a Permit to Perform Work upon State Highways. FREEBOARD The vertical distance between the Water surface of the design discharge and a point of interest such as a low chord of a bridge or top of a channel bank.


Related search queries