Example: tourism industry

STORMTECH SC-160LP CHAMBER

STORMTECH SC- 160lp CHAMBER (not to scale)Nominal CHAMBER SpecificationsSize (L x W x H) x 25 x 12 2,170 mm x 635 mm x 305 mmChamber Storage ft3 (.19 m3)Min. Installed Storage* ft3 ( m3)Weight lbs ( kg)Shipping 132 chambers/pallet 144 end caps/pallet 12 pallets/truck*Assumes 6 (150 mm) stone above, 4 (100 mm) below and stone between chambers with 40% stone "(350 mm)MIN*10'( m)MAX6" (150 mm)MIN12" (300 mm) MIN25"(635 mm)12" (300 mm)TYPDEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER 4" (100 mm) MINWITH GEOGRID BX124GG12"(300 mm)*MINIMUM COVER TO BOTTOM OF FLEXIBLE PAVEMENT.

STORMTECH SC-160LP CHAMBER (not to scale) 1ominal Chamber Specifications Size (L x W x H) 85.4 25 12” 2,170 mm 63 mm 30 mm Chamber Storage

Tags:

  Chamber, Stormtech, Stormtech sc 160lp chamber, 160lp

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of STORMTECH SC-160LP CHAMBER

1 STORMTECH SC- 160lp CHAMBER (not to scale)Nominal CHAMBER SpecificationsSize (L x W x H) x 25 x 12 2,170 mm x 635 mm x 305 mmChamber Storage ft3 (.19 m3)Min. Installed Storage* ft3 ( m3)Weight lbs ( kg)Shipping 132 chambers/pallet 144 end caps/pallet 12 pallets/truck*Assumes 6 (150 mm) stone above, 4 (100 mm) below and stone between chambers with 40% stone "(350 mm)MIN*10'( m)MAX6" (150 mm)MIN12" (300 mm) MIN25"(635 mm)12" (300 mm)TYPDEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER 4" (100 mm) MINWITH GEOGRID BX124GG12"(300 mm)*MINIMUM COVER TO BOTTOM OF FLEXIBLE PAVEMENT.

2 FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 20" (510 mm).SC-160 LPEND CAPNO SPACING REQUIREDBETWEEN CHAMBERSSINGLE LAYER OF GEOGRID BX124GG TO BE INSTALLEDBETWEEN NON WOVEN GEOTEXTILE AND BASE STONEPERIMETER STONEEXCAVATION WALL(CAN BE SLOPEDOR VERTICAL)SITE DESIGN ENGINEER IS RESPONSIBLE FORTHE ENSURING THE REQUIRED BEARINGCAPACITY OF SUBGRADE SOILSPAVEMENT LAYER (DESIGNEDBY SITE DESIGN ENGINEER)CHAMBERS SHALL BE BE DESIGNED IN ACCORDANCE WITH ASTM F2787"STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTICCORRUGATED WALL STORMWATER COLLECTION CHAMBERS".

3 GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%FINES, COMPACT IN 6" (150 mm) MAX LIFTS TO 95% PROCTORDENSITY. SEE THE TABLE OF ACCEPTABLE FILL GEOSYTHETICS 601T NON-WOVENGEOTEXTILE ALL AROUND CLEAN, CRUSHED,ANGULAR EMBEDMENT STONECHAMBERS SHALL MEET THE REQUIREMENTS FORASTM F2418 POLYPROPLENE (PP) CHAMBERSOR ASTM F922 POLYETHYLENE (PE) CHAMBERSEMBEDMENT STONE SHALL BE A CLEAN, CRUSHED AND ANGULARSTONE WITH AN AASHTO M43 DESIGNATION BETWEEN #3 AND #57 STORMTECH SC- 160lp CHAMBERD esigned to meet the most stringent industry performance standards for superior structural integrity while providing designers with a cost-effective method to save valuable land and protect water resources.

4 The STORMTECH system is designed primarily to be used under parking lots, thus maximizing land usage for commercial and municipal applications. STORMTECH chambers can also be used in conjunction with Green Infrastructure, thus enhancing the performance and extending the service life of these SC- 160lp CHAMBER was developed for infiltration and detention in shallow cover applications Only 14 (350 mm) required from top of CHAMBER to bottom of pavement Only 12 (300 mm) tallTHE MOST ADVANCED NAME IN WATER MANAGEMENT SOLUTIONS TMAdvanced Drainage Systems, Trueman Blvd.

5 , Hilliard, OH 43026 1-800-821-6710 For more information on the STORMTECH SC- 160lp CHAMBER and other ADS products, please contact our Customer Service Representatives at 1-800-821-6710 ADS Terms and Conditions of Sale are available on the ADS website, ADS logo and the Green Stripe are registered trademarks of Advanced Drainage Systems, Inc. STORMTECH is a registered trademark of STORMTECH , Inc. 2017 Advanced Drainage Systems, Inc. #10992 09/17 CSSC- 160lp CUMULATIVE STORAGE VOLUMES PER CHAMBERA ssumes 40% Stone Porosity. Calculations are Based Upon a 4 (100 mm) Stone Base Under : Add ft3 ( m3) of storage for each additional inch (25 mm) of stone foundation.

6 Depth of Water in System Inches (mm)Cumulative CHAMBER Storage ft3 (m3)Total System Cumulative Storage ft3 (m3)22 (559) ( ) ( )21 (533) ( ) ( )20 (508) ( ) ( )19 (483) ( ) ( )18 (457) ( ) ( )17 (432) ( ) ( )16 (406) ( ) ( )15 (381)6. 8 0 ( 3) 9 ( )14 (356) ( ) ( )13 (330) 8 ( ) ( )12 (305) 4 ( 8) ( )11 (279) 0 ( 3) ( )10 (254) ( 5 ) ( )9 (229) ( ) ( )8 (203) ( ) ( )7 (178) ( ) ( )6 (152) ( ) ( )5 (127) ( ) ( )4 (102)0 (0) ( )3 (76)0 (0) ( )2 (51)0 (0) ( )1 (25)0 (0) ( )Stone FoundationStone CoverENGLISH TONS (yds3)Stone Foundation Depth4 6 8 STORMTECH (0.)

7 8) ( ) ( )METRIC KILOGRAMS (m3)100 mm150 mm200 mmStormTech SC-3160LP952 ( )1,074 ( )1,197 (0. 8)Note: Assumes 6 (150 mm) of stone above and only embedment stone between OF STONE PER CHAMBERS tone Foundation Depth4 (100)8 (200)12 (300) STORMTECH ( ) ( ) ( )Note: Assumes no row separation and 14 (350 mm) of cover. The volume of excavation will vary as depth of cover EXCAVATION PER CHAMBER YD3 (M3)TOOLDESIGNW orking on a project? Visit us at and utilize the STORMTECH Design Tool


Related search queries