StoTherm ci XPS . Facades over Steel Frame Exterior Wall Insulation Systems Detail Booklet Combining innovative design and high-level performance, Series | November 2021 StoTherm ci XPS over steel frame offers a unique approach to wall system design. A highly ef cient and cost-effective solution to bolster an architect's aesthetic vision StoTherm ci XPS wall system provides world class performance through the integration of XPS continuous insulation (ci), innovative water-resis- tant barrier technology, drainage and a variety of architectural surface options. They are easy to install and can be used in almost any residential or commercial setting.

insulation board. A minimum of 1 ½” thickness of XPS board is needed when a reveal is specified. Construct a site built mock-up using materials and sub-trades associated with the project to verify installation, sequencing, detailing, and aesthetics. Fire: Minimum required thickness of XPS foam plastic insulation board is 1” (25mm).

Tags:

  Foam, Xps foam

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of StoTherm ci XPS Booklet - Sto Corp.

1 StoTherm ci XPS . Facades over Steel Frame Exterior Wall Insulation Systems Detail Booklet Combining innovative design and high-level performance, Series | November 2021 StoTherm ci XPS over steel frame offers a unique approach to wall system design. A highly ef cient and cost-effective solution to bolster an architect's aesthetic vision StoTherm ci XPS wall system provides world class performance through the integration of XPS continuous insulation (ci), innovative water-resis- tant barrier technology, drainage and a variety of architectural surface options. They are easy to install and can be used in almost any residential or commercial setting.

2 StoTherm ci XPS. Table of Contents Design Details Components General Notes .. StoGuard Chart .. System Components .. System Components with StoCast Brick .. SCB. System Components with StoCast Wood .. SCW. System Components with Ultra-High Impact Resistance .. Installation at Grade Termination at Grade: Sheathing Flush with Foundation or Slab Edge .. Termination at Grade: Sheathing Overlapping Slab or Foundation .. Installation of Aesthetic Feature Aesthetic Feature Band .. Aesthetic Reveal .. Installation at Windows Receptor-Type Window Sill: Rough Opening Protection .. A1.

3 Receptor-Type Window Sill: Receptor with End Dam .. A2. Receptor-Type Window Sill: Window and Sill Flashing, Cladding, and Perimeter Weather and Air A3. Receptor-Type Window Head: Rough Opening Protection/Flashing .. B1. Receptor-Type Window Head: Receptor and Window .. B2. Receptor-Type Window Head: Cladding, and Perimeter Weather and Air B3. Flanged Window Sill: Rough Opening Protection/Flashing .. A1. Flanged Window Sill: Window and Trim .. A2. Flanged Window Sill: Cladding, and Perimeter Weather and Air A3. Flanged Window Head: Rough Opening Protection/Flashing .. B1.

4 Flanged Window Head: Window and Trim .. B2. Flanged Window Head: Cladding, and Perimeter Weather and Air B3. Installation at Sof t Sof t: Insulated and Unvented .. Sof t: Uninsulated and Vented .. Installation at Joints Floor Line Without De ection .. Floor Line With De ection - Concealed Flashing and Drainage at Floor Line .. Floor Line With De ection - No Drainage at Floor Line .. Installation at Balcony/Abutments Balcony Floor/Wall .. Balcony Ceiling/Wall .. Installation at Dissimilar Cladding Horizontal Termination at Dissimilar Cladding .. Vertical Termination at Dissimilar Cladding.

5 Vertical Termination at Dissimilar Backup Wall (Continued on Page 3). 2. StoTherm ci XPS. Table of Contents Design Details (cont'd). Installation at Joints Vertical Expansion Joint in Back-Up Wall .. Vertical Expansion Joint in Back-Up Wall, StoTherm ci and Dissimilar Cladding .. Installation at Corners Inside Corner with Dissimilar Backup Wall .. Inside and Outside Corner with Common Substrate and StoMesh Corner Bead Reinforcement .. Inside and Outside Corner with Common Substrate and StoMesh Reinforcement .. Installation at Parapets, Gravel Stop, Roo ine Termination at Parapet - Front.

6 Termination at Parapet - Back .. B. Parapet with Cornice Feature .. Diverter Flashing at Roof/Wall Abutment .. Gravel Stop .. Saddle Flashing at Lower/Higher Wall Abutment: Air & Moisture Barrier .. Saddle Flashing at Lower/Higher Wall Abutment: Flashing .. Saddle Flashing at Lower/Higher Wall Abutment: Cladding, Coping and Sealant .. Installation at Penetrations Scupper Penetration .. Pipe Penetration - Precision Cut Sheathing .. Pipe Penetration - Rough Cut Sheathing .. Sign Attachment .. Fixture Attachment .. ATTENTION. Sto Corp. The nal design of any project is the sole responsibility of the Design Professional, with 3800 Camp Creek Pkwy.

7 SW. Bldg. 1400 Suite 120. considerations for compliance with local building and design codes and requirements. Atlanta, GA 30331. Sto Corp. accepts no liability for design, engineering, or workmanship of any Tel: (800) 221-2397. information provided herein is in addition to other technical data provided by Sto Corp. Fax: (404) 346-3119. (System Bulletin, Speci cation, Guide Details, etc). For more information, please visit 3.. StoTherm ci XPS Detail No.: General Notes Date: January 2017. Structural: Design structural wall for maximum allowable deflection, normal to the plane of the wall, of L/240.

8 Ultimate tested wind load resistance: +175 psf ( kPa). Apply appropriate safety factor as required by code. Higher ultimate loads can be achieved with adequate stiffness (and sheathing attachment for frame walls) of supporting construction. Refer to Tech Hotline No. 0894-E. All trim and projecting architectural features must have a minimum 1:2 (27 degree) slope. A minimum of (19mm) XPS insulation board must remain if areveal is cut in the insulation board. A minimum of 1 thickness of XPS board is needed when a reveal is specified. Construct a site built mock-up using materials and sub-trades associated with the project to verify installation, sequencing, detailing, and aesthetics.

9 Fire: Minimum required thickness of XPS foam plastic insulation board is 1 (25mm). Maximum allowable thickness is 6 (152mm) on types I, II, III, or IV. construction. If walls are required to have an hourly fire-resistance rating, the maximum allowable thickness is 2 (51mm) over maximum 2-hour rated nonload bearing frame walls, or 6 over, (concrete or masonry) mass walls. Refer to ICC-ESR 1748 for more information. XPS insulation board has a service temperature limit of 165 F (74 C). The use of dark colors (Light Reflectance Value of less than 20) is not recommended. Moisture Protection: Provide minimum 6 (152mm) clearance above landscaped areas (soil, grass, and other non-paved surfaces), and a minimum of 1 ( ) above finished grade areas, (pavement, patios, ) as required by code.

10 StoTherm ci XPS systems are not intended for use below grade. Direct incidental moisture to the exterior a maximum of every third floor. Weep spacing at window, door, floor line and other similar penetrations are to be determined by the Design Professional. Refer to StoTherm ci XPS Specifications, Product Bulletins, Technical Hotlines, Sto Installation Manuals, and Maintenance Guides for the most complete and current information. See Tech Hotline Nos. 0403 BSc, 0603 BSc for important information on detailing and moisture control in wall assemblies. Joints: Provide minimum (19mm) wide joints in StoTherm ci where they exist in the substrate or supporting construction, where the cladding adjoins dissimilar construction or materials, at changes in building height, at expansion, control, and cold joints in construction, and at floor lines in multi-level wood frame construction.