Table 1: List of ballast water management systems that ...
Table 1 (continued) Name of the system and proposing country Name of manufacturer Date of Basic Approval 15 Hyundai Heavy Industries Co., Ltd.
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
ANNEX LIST OF NATIONAL OPERATIONAL …
www.imo.orgMSC-MEPC.6/Circ.16 Annex, page 2 Changes or Amendments to the LIST OF NATIONAL OPERATIONAL CONTACT POINTS RESPONSIBLE FOR THE RECEIPT, TRANSMISSION AND PROCESSING OF URGENT REPORTS ON
Ref. T4/4.01 MSC.1/Circ.1205 26 May 2006
www.imo.orgi:\circ\msc\01\1205.doc international maritime organization 4 albert embankment london se1 7sr telephone: 020 7587 3152 fax: 020 7587 3210
MEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS
www.imo.orgi:\circ\msc\01\1206.doc international maritime organization 4 albert embankment london se1 7sr telephone: 020 7587 3152 fax: 020 7587 3210
RESOLUTION MEPC.282(70) (Adopted on 28 …
www.imo.orgresolution mepc.282(70) (adopted on 28 october 2016) 2016 guidelines for the development of a ship energy efficiency management plan (seemp)
RESOLUTION MEPC.107(49) Adopted on 18 July …
www.imo.orgresolution mepc.107(49) adopted on 18 july 2003 revised guidelines and specifications for pollution prevention equipment for machinery space bilges of ships
Specification, Prevention, Pollution, Equipment, Mepc, Specifications for pollution prevention equipment for machinery, Machinery
ANNEX LIST OF NATIONAL OPERATIONAL …
www.imo.orgMSC-MEPC.6/Circ.15 Annex, page 2 Changes or Amendments to the LIST OF NATIONAL OPERATIONAL CONTACT POINTS RESPONSIBLE FOR THE RECEIPT, TRANSMISSION AND PROCESSING OF URGENT REPORTS ON
Operational, Responsible, Annex, National, Points, Contact, National operational contact points responsible
LISTING OF CURRENT IMO PUBLICATIONS at 12 …
www.imo.orgLISTING OF CURRENT IMO PUBLICATIONS at 12 June 2018 (cont’d) 3 Guideline for Oil Spill Response in fast currents, 2013 Edition Operational Guidelines on Oil, 2016 Edition
Current, Publication, Listing, Listing of current imo publications at
RESOLUTION MSC.256(84) (adopted on 16 May …
www.imo.orgresolution msc.256(84) (adopted on 16 may 2008) adoption of amendments to the international convention for the safety of life at sea, 1974, as amended
ANNEX LIST OF NATIONAL OPERATIONAL …
www.imo.orgmsc-mepc.6/circ.15 annex, page 1 annex list of national operational contact points responsible for the receipt, transmission and processing of
Operational, Annex, Lists, National, Contact, Annex list of national operational, Annex list of national operational contact
NATIONAL CONTACT POINTS FOR SAFETY AND …
www.imo.orgMSC-MEPC.6/Circ.16 Page 2 I:\CIRC\MSC-MEPC\6\MSC-MEPC.6-CIRC.16.docx 5 The list described in paragraph 2 is issued as the annex to the MSC-MEPC.6 circular
Related documents
Latest Information of Approval of Ballast Water Management ...
www.classnk.or.jpClassNK EQD as of 27 July 2018 BWMS Manufacture BWMS Name Country Process Capacity of Approved BWMS Basic Approval Final Approval 1 Alfa-Laval AB PureBallast Sweden Filtration + UV/TiO2 250 - 3,000㎥/h Approved Approved Approved
Heavy Goods Trailer (O3 and O4) Type Approval Leaflet
www.rsa.ie17/10/12 September 2012 Heavy Goods Trailer (O3 and O4) Type Approval Leaflet From October 29th 2012 APPROVAL REQUIRED AT FIRST LICENSING In order to first license a heavy goods trailer (trailer with a Gross Vehicle Design Weight in excess of
Good, Types, Heavy, Leaflet, Trailer, Approval, Type approval leaflet, Heavy goods trailer, O3 and o4
Type Approval for Automotive Systems and Components
www.vehicle-certification-agency.gov.ukType Approval for Automotive Systems and Components www.vehicle-certification-agency.gov.uk Document Ref: VCA004 3 of 5 Revision 15 There are two other separate framework Regulations; 168/2013, and 167/2013 (as amended),
Standard application format and guidance document for …
ec.europa.euGuidance document RoHS 2 exemptions 1 1 Annex: Standard application format and guidance document for RoHS exemption requests on the basis of Article 5(8) Directive 2011/65/EU
Applications, Standards, Document, Guidance, Format, Standard application format and guidance document
EMA tracking tool: relocation to Amsterdam Main milestones
www.ema.europa.euEMA tracking tool: relocation to Amsterdam Main milestones Nov ec Jan Feb Mar Apr May Jun Jul Aug Sep ct Nov ec Jan Feb Mar Apr May Jun Jul Aug Sep ct Nov ec Jan Feb Mar Apr May Jun
B C1 REGULATION (EC) No 853/2004 OF THE EUROPEAN ...
www.fsai.ie02004r0853 — en — 21.11.2017 — 017.001 — 2 c1 regulation (ec) no 853/2004 of the european parliament and of the council of 29 april 2004