Transcription of TABLE OF CONTENTS
1 Adapted by Ed Archuleta and Arlando Gilbert with the permission of the Georgia Department of Transportation Copyright 2000 Updated March 2007 Basic Surveying - Student Workbook Page 2 of 52 3/15/2007 TABLE OF CONTENTS TABLE OF LIST OF FIGURES ..4 INTRODUCTION ..5 CHAPTER 1: CONSTRUCTION PREPARATION ..5 RESPONSIBILITIES ..5 CHAPTER 2: CONSTRUCTION STAKING ..6 TYPICAL SURVEY STAKES ..6 MINIMUM STAKING REQUIREMENTS ..6 FLAGGING COLOR CHAPTER 3: MEASUREMENT OF DISTANCES ..8 PACING ..8 TAPING PROCEDURES.
2 9 EDM (Electronic Distance Measuring) ..10 ACCURACY AND CHAPTER 4: COMMON MISTAKES IN READING AND RECORDING LINEAR MEASUREMENTS ..12 READING THE WRONG FOOTMARK ..12 TRANSPOSING FIGURES ..12 READING THE TAPE UPSIDE-DOWN ..12 TAPE NOT STRETCHED STRAIGHT ..12 INCORRECT CARELESS TENSION AND SAG ..13 CHAPTER 5: DIFFERENTIAL THE ENGINEER S THE SELF LEVELING LEVEL (Auto Level)..15 THE HAND LEVELING RODS ..16 READING THE HOLDING THE DETERMINING ELEVATIONS - PROCEDURE ..17 NOTE KEEPING.
3 19 CHAPTER 6: COMMON SOURCES OF ERRORS AND MISTAKES IN DIFFERENTIAL LEVELING ..20 INSTRUMENT OUT OF ADJUSTMENT ..20 BUBBLE NOT CENTERED WHEN TAKING ROD READING ..20 ROD NOT HELD TURNING POINTS ..20 ERRONEOUS ROD LENGTH ..20 OTHER MISTAKES AND CARE OF CHAPTER 7: SLOPE MEASUREMENTS ..22 METHOD 1 ..22 Basic Surveying - Student Workbook Page 3 of 52 3/15/2007 METHOD 2 ..23 CONVERTING FROM DEGREES MINUTES SECONDS (DMS) TO DECIMAL DEGREES (DD) ..24 CONVERTING FROM DECIMAL DEGREES (DD) TO DEGREES MINUTES SECONDS (DMS).
4 24 EXERCISES ..24 CHAPTER 8: SLOPE STAKING ..25 SLOPE STAKING PROCEDURES ..25 SLOPE STAKES ..29 STAKING SUBGRADE ..30 CHAPTER 9: GRADE STAKING ..34 BLUE AND RED CHECKING FINISH CHAPTER 10: PIPE LAYOUT ..36 SAMPLE PIPE PROBLEM #1 ..37 SAMPLE PIPE PROBLEM #2 ..38 SAMPLE PIPE PROBLEM #3 ..40 SAMPLE PIPE PROBLEM #4 ..42 CHAPTER 11: AREA AND VOLUME PRACTICE EXERCISES ..44 EARTHWORK VOLUMES ..44 PROCEDURE ..45 SAMPLE EARTHWORK PROBLEM # SAMPLE EARTHWORK PROBLEM # SAMPLE EARTHWORK PROBLEM # SAMPLE PROBLEM #4 (USE CHAPTER 10 & 11).
5 49 CHAPTER 12: MODERN SURVEY TOTAL STATION ..50 GPS (GLOBAL POSITIONING SYSTEM)..50 SUMMARY ..51 CREDITS ..51 ANSWER Basic Surveying - Student Workbook Page 4 of 52 3/15/2007 LIST OF FIGURES Figure 2-1 Typical construction Figure 2-2 CDOT Standard flagging Figure 3-1 Gradations on typical Figure 3-2 Survey chain and modern survey Figure 3-3 Direct distance Figure 3-4 Breaking Figure 3-5 Error in measuring when tape is not Figure 3-6 Accuracy and Figure 4-1 Effect of not stretching the Figure 4-2 Error in measurement from improper alignment of the Figure 4-3 Example of sag in
6 Figure 5-1 Example of engineering Figure 5-2 Example of self leveling Figure 5-3 Examples of hand Figure 5-4 Example of Philadelphia Figure 5-5 Error in reading the rod from being Figure 5-6 Differential Figure 5-7 Typical Figure 5-8 Typical surveying level Figure 7-1 Determining horizontal distance from slope distance and elevation Figure 7-2 Determining horizontal distance from slope distance and slope Figure 8-1 Catch Figure 8-2 Roadway Typical Figure 8-3 Determine an Figure 8-4 Calculate the Grade Figure 8-5 First attempt, try 35.
7 27 Figure 8-6 Reference Offset right Figure 8-7 Reference Offset left Figure 8-8 Second attempt, try 40 ..29 Figure 8-9 Third attempt, try 38 ..29 Figure 8-10 Slope stake set at catch Figure 8-11 10 Offset stake for catch point set higher than catch Figure 8-12 Point of Slope Selection ( )..31 Figure 8-13 Calculating difference in Figure 8-14 Calculating difference in Figure 8-15 Slope stake at Figure 9-1 Example of checking grade using a string Figure 10-1 sample pipe problem # Figure 10-2 Sample pipe problem # Figure 10-3 Sample pipe problem # Figure 10-4 Sample pipe problem #3 field Figure 10-5 Pipe Figure 11-1 Cross Figure 11-2 Cross section equation and Figure 11-3 Sample problem # Basic Surveying - Student Workbook Page 5 of 52 3/15/2007 INTRODUCTION
8 This manual is intended only as a guide for training purposes and is not meant to replace the CDOT Survey Manual and in all cases, the CDOT Survey Manual has precedence over this manual when matters of policy and procedure are of concern. The CDOT survey manual can be found at CHAPTER 1: CONSTRUCTION SURVEYS Construction surveying is the translation of construction plans into physical points on the ground that can be used as a basis for the actual construction. The results of construction surveying are seen in almost any urban, suburban, and rural setting.
9 Almost any roadway, building, or other man-made improvement probably had some amount of construction surveying involved. Construction surveying provides not only the horizontal location of new improvements, but also the vertical information required to ensure that surfaces drain or pipes flow as required. PREPARATION To successfully perform construction staking and layout, preparation is a major part of the operation. Study: Contract plans Special Provisions Standard Specifications Plan Quantities Construction Manual CDOT Surveying Manual Contractor s Proposal Take appropriate measures to protect existing monuments.
10 RESPONSIBILITIES Contractor Surveying - When the bid schedule contains pay item 625, Construction Surveying, the Department will provide control points and bench marks as described in the Contract. The Contractor shall furnish and set construction stakes establishing lines and grades in accordance with the provisions of Section 625. Per Section (a) the Engineer may order additional surveying which will be paid for at the rate established by the contract. Department Surveying - When the bid schedule does not contain pay item 625, Construction Surveying, the Engineer will furnish one set of construction stakes and marks establishing lines and grades as described below for proper prosecution of the work.