TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, …
ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1st April, 2021 General 1. The tariff figures indicated in this tariff schedule are the tariff rates payable by the consumers of Distribution Licensees viz. DGVCL, MGVCL, PGVCL and UGVCL. 2.
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
GUJARAT ELECTRICITY REGULATORY …
www.pgvcl.compage 1 of 23 gujarat electricity regulatory commission (gerc) licensee’s power to recover expenditure incurred in providing supply and other miscellaneous charges
Commission, Regulatory, Electricity, Gujarat, Licensee, Gujarat electricity regulatory, Gujarat electricity regulatory commission, Gerc
PASCHIM GUJARAT VIJ CO. LTD INVITES - pgvcl.com
www.pgvcl.comcriteria, his / her candidature / selection / appointment shall liable to be cancelled. 3. For the payment of Nonrefundable application fees, the bank charges shall be
(Form A-2) PASCHIM GUJARAT VIJ COMPANY …
www.pgvcl.com(Form A-2) PASCHIM GUJARAT VIJ COMPANY LIMITED Application form- New connection/ Load enhancement/ Load reduction/ Change of name (High Tension/ Extra High Tension Service)
Form, Limited, Company, Gujarat, Paschim, Form a 2, Paschim gujarat vij company, Paschim gujarat vij company limited
PGVCL Corporate Office Rajkot
www.pgvcl.comSr.No. Name Designation Contact No 1 Shri Bhavin Pandya Managing Director (0281) 2380425/27 2 Shri J J Gandhi Chief Engineer(Tech) (0281) 2380425/27
THE ELECTRICITY ACT, 2003
www.pgvcl.comestablishment of Appellate Tribunal and for matters connected therewith and incidental thereto. The Electricity (Amendment) Act of 1959 enlarged the scope of facilities available to the consumers of electricity, extended the same facilities to consumers served by government electricity department as are engaged by consumers of private
2003, Electricity, Tribunals, Appellate, The electricity act, Appellate tribunal
PASCHIM GUJARAT VIJ CO. LTD
www.pgvcl.com5. In case of Widow Applicant, copy of marriage certificate and death certificate of the deceased husband should be attached. 6. NOC from present employer (If applicable). 7. Domicile certificate (for Gujarat state candidates) 8. Identification Proof …
PASCHIM GUJARAT VIJ COMPANY LIMITED
www.pgvcl.comRegistered & Corporate Office, “PaschimGujaratVijSevaSadan” Off. Nana Mava Main Road, Laxminagar, Rajkot – 360 004 CIN U40102GJ2003SGC042908 Phone No.: (0281) 2380423-25-27, 2370916 Fax. No.: (0281) 2377518 www.pgvcl.com Paschim Gujarat Vij Company Limitedis a Power Distribution Company of erstwhile Gujarat
PASCHIM GUJARAT VIJ CO. LTD
www.pgvcl.comPASCHIM GUJARAT VIJ CO. LTD PGVCL is a Power Distribution Company of erstwhile Gujarat Electricity Board having Offices at different locations in Gujarat State. PGVCL offers a challenging and rewarding career to young and dynamic candidates. ... on the application form. 2. Attested copy of
Related documents
II - Low Tension Supply
www.tangedco.gov.inI - High Tension supply TARIFF FIXED BY TNERC TARIFF PAYABLE BY THE CONSUMER For Handlooms in residence, 0 to 200 units bimonthly is free. (Above 200 units bi-monthly, the corresponding slab in the domestic tariff is applicable) *I-B #II-C III-A(1) 40/kW 40/kW #I-A 2.50 30/service 20/service 2.50 40/service 30/service 50/service 50/service
Welfare Effects of a Tariff: Large Country
edc.gov.bzdomestic supply by SFT and imports by the difference DFT - SFT (the blue line in the figure). When a specific tariff is implemented by a small country it will raise the domestic price by the full value of the tariff. Suppose the price in the importing country rises to because of the tariff. In this case the tariff rate would be , equal to the
Supply, Welfare, Effect, Tariffs, Welfare effects of a tariff
SCHEDULE 1 SUPPLY OF ELECTRICITY PART I: ENERGY, …
www.tshwane.gov.zaand the tariff is only applicable to existing two-phase connections.) The scale will apply to the premises of the following groups of consumers: A pumping plant where the water pumped is used exclusively for domestic purposes on premises receiving a supply under this scale of the tariff A building or separate section of a building comprising a ...
ELECTRICITY TARIFF SCHEDULE FOR FY 2020-21 BRPL, BYPL ...
derc.gov.inELECTRICITY TARIFF SCHEDULE FOR FY 2020-21 – BRPL, BYPL, TPDDL & NDMC Delhi Electricity Regulatory Commission Page 4 DISCOMs. 12. The Single Point Delivery Supplier availing supply at HT & above shall charge the tariff to its LT consumers and in addition shall be entitled to charge an extra upto 5% of the bill
ELECTRICITY GENERATION AND DISTRIBUTION
resource.capetown.gov.za2021/2022 v 1.2 Page 4 of 4 Application Form - New or modified electricity supply services 2021-2022 - v 1.2.docx Commercial and industrial: *3 Greyed-out tariffs only available once approved by Nersa. *4 These tariffs are only available to qualifying customers as stipulated in terms of the City's Investment Incentives Policy. *5 These tariffs will only be available once the rules and ...
Price Discrimination and Two Part Tariff
ocw.mit.eduto calculate each individual’s Consumer Surplus, because this is the optimal Tariff that needs to be applied. This surplus is equal to the area below the demand curve and above the supply curve (or the marginal cost curve). 2 Second, we need to calculate how many units of output each consumer will demand
TARIFF SCHEDULE FOR SUPPLY OF ELECTRICITY
www.ugvcl.comANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1st April, 2020 General 1. The tariff figures indicated in this tariff schedule are the tariff rates payable by the consumers of Distribution Licensees viz. DGVCL, MGVCL, PGVCL and UGVCL. 2.
Schedule, Supply, Electricity, Tariffs, Tariff schedule for supply of electricity
Network Tariff Guide 2020-2021 - Energex
www.energex.com.auEnergex’s 2020-21 Network Tariff Guide 5 2. Assigning and reassigning customers to network tariff classes and tariffs This chapter sets out Energex’s procedures for assigning new customers2 to a default network tariff and for reassigning existing …
Tariff Booklet - Tenaga Nasional
www.tnb.com.mytariff in line with its strategy to enable Tenaga Nasional Berhad (TNB) to continue providing a reliable and high quality electricity supply to all Malaysians. The new tariff structure is effective from 1st June 2006. The review is inevitable, given the rising cost of supplying electricity borne by TNB. However, Malaysians continue to
Before the MAHARASHTRA ELECTRICITY REGULATORY …
www.mahadiscom.inTruing-up of ARR for FY 2019-20 and ARR and Tariff for Multi Year Tariff (MYT) 4th Control Period from FY 2020-21 to FY 2024-25. The Petition has been submitted in accordance with the MERC (Multi Year Tariff) Regulations 2015 (“MYT Regulations, 2015”), for Truing-up of ARR for FY 2017-18, FY 2018-19 ,