SpecificationDoc uncontrolled when printed Page:1of 153 date:1/08/2022 Technical specification Civil Technical specification Civil Doc uncontrolled when printed Page:2of 153 date:1/08/2022 Table of Contents Revision details .. 8 Introduction .. 13 Copyright .. 13 Acronyms .. 13 General terms & definitions .. regulations .. and codes .. items .. and reused materials .. services .. records .. points .. documents .. of ground conditions .. preparation for earthworks .. or fill material .. preparation .. restoration .. points .. documents .. for concrete .. of concrete mixes .. and delivery of concrete .. concrete .. to unformed surfaces .. to formed surfaces .. of concrete .. and testing of concrete .. in concrete .. 50 Technical specification Civil Doc uncontrolled when printed Page:3of 153 date:1/08 .. reinforcement .. and holding down bolts .. to concrete .. concrete box culverts and open channels.

C3.5.7 Concrete aggregates not to contain asbestos. C8.5 Road base and sub-base materials not to contain asbestos. 5 C1.5 Recycled and Reuse Material clause amended. Table 3-1 Cement type for N class concrete amended. C3.11.2 Table 3-4 Concrete Curing Time inserted, and clause amended.

Tags:

  Specification, Concrete

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Technical Specification- Civil

1 SpecificationDoc uncontrolled when printed Page:1of 153 date:1/08/2022 Technical specification Civil Technical specification Civil Doc uncontrolled when printed Page:2of 153 date:1/08/2022 Table of Contents Revision details .. 8 Introduction .. 13 Copyright .. 13 Acronyms .. 13 General terms & definitions .. regulations .. and codes .. items .. and reused materials .. services .. records .. points .. documents .. of ground conditions .. preparation for earthworks .. or fill material .. preparation .. restoration .. points .. documents .. for concrete .. of concrete mixes .. and delivery of concrete .. concrete .. to unformed surfaces .. to formed surfaces .. of concrete .. and testing of concrete .. in concrete .. 50 Technical specification Civil Doc uncontrolled when printed Page:3of 153 date:1/08 .. reinforcement .. and holding down bolts .. to concrete .. concrete box culverts and open channels.

2 Testing of liquid retaining structures .. points .. laying .. documents .. materials .. , fittings, ancillary structures and appurtenances .. laying and tolerance .. procedure .. and storage .. pipes .. to existing pipelines .. built into structures .. embedment and concrete encasement .. fill materials and compaction .. of pipes .. protection of pipes and fittings .. of pipes and fittings .. block installation .. holes, valves chambers and ancillary structures .. boring .. directional drilling .. of sewer and maintenance holes .. of water and pressure mains .. steel and aluminium works .. documents .. of subcontractors .. coating .. , erection and testing of circular liquid retaining steel tanks .. points .. Work .. documents .. 102 Technical specification Civil Doc uncontrolled when printed Page:4of 153 date:1/08 samples for facework .. cement .. thickener .. mortar .. mortar .. grout.

3 Material .. proof courses and flashing in buildings .. joint material .. ties .. joints .. in buildings .. for timber shrinkage .. joints .. wall construction .. masonry .. bracing under construction .. loading .. loading .. of construction .. in masonry work .. masonry .. render .. repairs and remedial tying .. points .. documents .. of demolition .. of demolished material .. up .. on methodology .. points .. documents .. of topsoil .. preparation .. base and sub-base materials .. and transport of road base and sub-base and compacting road base and sub-base materials .. 118 Technical specification Civil Doc uncontrolled when printed Page:5of 153 date:1/08 concrete wearing surface .. and transport of asphaltic concrete .. coat .. and compaction of asphaltic concrete .. carriageway .. and gutter .. safety barrier systems .. documents .. verification during construction .. of pile foundations.

4 Piles .. cast in-situ concrete piles .. piles .. piles .. piles .. pile types .. requirements .. documents .. investigations .. drainage design .. coating systems .. , walkways, open flooring, stairways and handrails .. loads .. structures .. liquid retaining steel tanks .. stop boards and logs .. and grates .. design .. retaining wall design .. anchorages .. of dams .. 152 Ownership .. 153 Ownership .. 153 Change history .. 153 Technical specification Civil Doc uncontrolled when printed Page:6of 153 date:1/08/2022 TablesTable 2-1 Properties of select fill material .. 28 Table 2-2 Minimum compaction standard for filling areas .. 30 Table 2-3 Summary of hold points for earthworks .. 32 Table 3-1 Limits for impurities in recycled water .. 38 Table 3-2 concrete mix design requirements .. 39 Figure 3-1 Thermal test block layout .. 40 Table 3-3 Aggregate grading for no fines concrete .. 41 Table 3-4 Elapsed delivery time.

5 42 Table 3-5 Minimum curing time .. 47 Table 3-6 Permissible tolerances on slump .. 48 Table 3-7 Minimum time for stripping of formwork .. 52 Table 3-8 Maximum construction tolerances .. 58 Table 3-9 Summary of hold points for concrete 59 Table 4-1 Minimum compaction standard for pipe embedment materials .. 65 Table 5-1 Selection of material .. 82 Table 5-2 Summary of hold points for structural steel and aluminium works .. 101 Table 6-1 Sand grading requirements .. 104 Table 6-2 Minimum clearance required for timer shrinkage .. 106 Table 6-3 Summary of hold points for concrete 111 Table 7-1 Summary of hold points for demolition works .. 115 Table 8-1 Asphaltic concrete surface .. 118 Table 10-1 Deflection limits of beams supporting platforms and walkways .. 137 Table 10-2 Minimum design imposed loads .. 139 Table 10-3 Importance levels for structures .. 140 Table 10-4 Minimum durability requirements for typical exposure classifications to AS 3735 for 50 year design life.

6 144 Table 10-5 Minimum durability requirements for typical exposure classifications to AS 3735 for 100 year design life .. 145 Table 10-6 Road vehicle load .. 151 Technical specification Civil Doc uncontrolled when printed Page:7of 153 date:1/08/2022 Figures Figure 2-1 Fill around structures .. 27 Figure 3-1 Thermal test block layout .. 40 Technical specification Civil Doc uncontrolled when printed Page:8of 153 date:1/08/2022 Revision details Version No. Clause Description of revision All sections Minor edits and amendments, including revised page numbering. Incorporated Amendment No. 1 to Version 21/01/2020. & Clarity in definitions of competent geotechnical engineer, trafficable/paved areas, engineering control for temporary excavations, relative compaction & density index. Updated term, excavation support to engineering control. Updated requirements for design of engineering control for temporary excavation and related hold point EPH2 in Table 2-3.

7 Max. allowable free swell index of 3% replaced with CBR swell of max. Compaction requirement for unpaved/non-trafficable areas, referred to Table 2-2 and footnote. Laboratory test requirements clarified with relevant Australian standard reference. Updated reference documents list. Included manufactured pozzolan in the definition of supplementary cementitious materials. Updated fly ash grades in accordance with AS Added clause to cover requirements for manufactured pozzolans. Introduced requirements for recycled water. Updated concrete mix design requirements. Introduced sustainability requirement maximum embodied greenhouse gas footprint to facilitate implementation of Sydney Water s Nez Zero Carbon Emissions Plan 2030. Revised clause to provide clarity on requirements for a concrete mix submission. Updated maximum drop height for all concrete placements to m. Relaxed requirements for a certificate of conformity for slabs on ground and minor structures.

8 Updated requirements for sampling frequency for concrete supplies 4 m3. Updated requirements for waterstops. Updated limits for a maximum crack width and requirements for crack mapping and remediation methods and procedures submission. Relaxed requirements for a certificate of conformity for slabs on ground and minor structures. Updated requirements for a minimum time for stripping of formwork. Updated requirements for patch repairs. Included the thermal test block results in hold point CHP1. Updated referenced documents list. Added stainless steel (SS) pipes. Clarified requirements for debeading of PE pipes Added requirements for SS pipes. Removed pipeline grading requirement from and added to Removed requirement for inspection by Sydney Water. Removed stabilised material requirements from Added new Clause Added welding requirements for SS pipes. Removed reference to WPIMS 5027 and added reference to D0001669. Removed reference to WPIMS 5021 and added reference to D0001667.

9 Updated referenced documents list. Added requirements for fabrication of steelwork. Technical specification Civil Doc uncontrolled when printed Page:9of 153 date:1/08/2022 Version No. Clause Description of revision Updated weld inspections and testing requirements. Deleted Table 5-2. Added requirements for connections of new steelwork to existing galvanised steelwork. Updated requirements for a grout mix submission. Added Sydney Water reference document. Added requirements regarding management of asbestos and other hazardous building materials. and sub clauses Added durability design to the list of required design calculations. Updated referenced documents list. General revision and incorporated requirements from Technical specification Mechanical (BMIS0209 Version ) Updated requirements. Removed note 3 in Tables 10-4 and 10-5. Lowering exposure classification is not permitted. Deleted the clause. Updated requirements for butted precast post-tensioned tanks.

10 Deleted the clause. Deleted sub-clauses and referred to D0001963. Removed pipeline grading requirement from and added to Added requirement for hydraulic design of pressure pipes to AMQ0562 and non-pressure sewer pipes to D0000666. All Sections Minor amendments, including revised page numbering. Referenced documents updated. Added requirements for polypropylene pipe. Added new requirements for pipe materials. Added requirement for basement installations. Revised requirements for cement stabilised sand material. Added new clause for polyethylene pipe joints. Added new corrosion protection requirements. Removed tolerance requirement. Added requirement for use of spacers and tracer wire. Added requirement for use of tracer wire. Various amendments to align with WSA 02 (Sydney Water Edition). Added requirements for minimum design life. Revised requirements for PE design factors. Revised dead and live design loads. Added requirements for adjacent parallel pipelines.