TECHNICAL SPECIFICATION Construction of 33/11 …

TECHNICAL SPECIFICATION Construction of 33/11 KV Primary Sub-Stations. 1 GENERAL Scope of work A. Supply In the package materials have been classified as under i. Owner s supply materials (OSM) 33/11 KV Power Transformers, Station 33 KV Transformers , VCB, kiosk, CT, PT, CR panels, LA,33KV Isolator,11KV AB Switch & HG Fuse, Battery with Charger, ABCD, SDB, Light Fittings, Control Cable ,Structures, Hardware etc. ii. Contractor s scope All other material except the items shown above such as cements, different type of aggregate, bricks, Heat shrink type end connector (for all level), earthing materials, Foundation Materials, all Civil works Materials and other consumable required to complete the job. B. Construction of 33 / 11 KV Sub-Stations Sl. No. Name of the Sub Station Location (Name of the division) 1 Dhamdhada JTED, Jajpur Town 2 Brahmabarada KuED, Kuakhia Prior to the commencement of the supply / work all relevant drawings, designs must be got approved from GM (P&EMS), NESCO C.

a) Substation site selection b) Land acquisition Limit of contract The scope of work shall also include all work incidentals for successful operation and

Tags:

  Specification, Site, Construction, Technical, Selection, Substations, Technical specification construction of 33, Substation site selection

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of TECHNICAL SPECIFICATION Construction of 33/11 …

1 TECHNICAL SPECIFICATION Construction of 33/11 KV Primary Sub-Stations. 1 GENERAL Scope of work A. Supply In the package materials have been classified as under i. Owner s supply materials (OSM) 33/11 KV Power Transformers, Station 33 KV Transformers , VCB, kiosk, CT, PT, CR panels, LA,33KV Isolator,11KV AB Switch & HG Fuse, Battery with Charger, ABCD, SDB, Light Fittings, Control Cable ,Structures, Hardware etc. ii. Contractor s scope All other material except the items shown above such as cements, different type of aggregate, bricks, Heat shrink type end connector (for all level), earthing materials, Foundation Materials, all Civil works Materials and other consumable required to complete the job. B. Construction of 33 / 11 KV Sub-Stations Sl. No. Name of the Sub Station Location (Name of the division) 1 Dhamdhada JTED, Jajpur Town 2 Brahmabarada KuED, Kuakhia Prior to the commencement of the supply / work all relevant drawings, designs must be got approved from GM (P&EMS), NESCO C.

2 The scope of the proposal for the balance materials to be supplied by the bidder to complete the job shall be on the basis of a single Bidder s responsibility, completely covering supply and erection of all the equipment specified under the accompanying TECHNICAL Specifications including other services. It will include the following (i) Detailed investigation of substation and preparation of BOQ to be done by the bidder. (ii) Complete manufacture, including shops testing & supply of materials from the approved vendor (materials which are to be supplied by the bidder) (iii) Providing Engineering drawings related to foundation details, structural details of Sub-station work, equipments data, operational manual, etc for the Owner s approval; (iv) Packing and transportation from the NESCO Store to the site .

3 (v) Receipt, storage, preservation and conservation of equipment at the site . (vi) Pre-assembly, if any, erection testing and commissioning of all the equipments; (vii) Reliability tests and performance and guarantee tests on completion of commissioning (viii) Loading, unloading and transportation as required, (ix) Erection of installations of specified voltages, (x) Testing, Commissioning of installations of the Sub-Station inclusive of all related Civil works. (xi) Storing before erection (xii) Getting the Sub-Stations inspected and certified by Electrical Inspection after completion of work. Transportation of all above required materials from NESCO store to site and all other required materials (to be supplied by bidder) from supplier s premises to work site , Construction of new electrical/civil structures, safe custody of the items and return of unused NESCO supplied materials to the NESCO stores.

4 GENERAL CONDITIONS OF CONTRACT Responsibility of the Contractor The Contractor shall be responsible for the complete design and engineering, overall co- ordination with internal and external agencies, project management, loading, unloading, storage at site , inventory management including OSM materials at site during Construction , installations as per Engineer. in charge s advice, handling, moving to final destination, obtaining statutory clearances for successful erection, testing and commissioning of the substation. Specific exclusions: The following items of work are specifically excluded from the Contractors scope of work unless otherwise specifically brought out. a) Substation site selection b) Land acquisition Limit of contract The scope of work shall also include all work incidentals for successful operation and commissioning and handing over of works whether specifically mentioned or not.

5 In general, works are to be carried out by the Contractor in accordance with the stipulations in Conditions of Contract. Quantity variation The Employer reserves the right to order and delete such works which may be necessary for him within the quantity variation option laid down in the conditions of the contract. This shall include but not limited to the manufacture, supply, testing, and delivery to site , erection and commissioning as may be required in accordance with the Conditions of Contract at the prices stated in the Schedules. The Employer shall also be at liberty to delete Any Items from the Contractor s scope of supply at any time before commencement of supply of works under the detailed scope of work. GENERAL PARTICULARS OF SYSTEM System description The following are the general particulars governing the design and working of the complete system of which the Contract Works will eventually form a part: The system is three phase, 50 Hz and power is to be distributed to consumers under NESCO at appropriate voltage level via distribution sub-stations, which operate at 33/ 11kV, 33/ KV or 11 KV.

6 SYSTEM DATA Sl. No Description of TECHNICAL Parameter Unit Data 1 Nominal system voltage kVrms 33kV 2 Maximum system voltage kVrms 3 Power frequency with stand kVrms 70kV voltage 4 Lightning impulse withstand voltage a) Line to earth b) Across isolating gap KV p (for 170kVp 195kVp 5 One minute power frequency withstand value Dry Wet kVrms kVrms 70 80 6 System frequency Hz 50 7 Variation in frequency % 8 Continuous current rating 800A 9 Symmetrical short circuit current kA 25 10 Duration of short circuit fault current Second 3 11 Dynamic short circuit current rating kAp 12 Air clearances Phase to ground Phase to phase meters meters 13 Conductor spacing for AIS layouts Phase to ground Phase to phase meters meters 14 Design ambient temperatures oC 50 15 Pollution level as per IEC-815 and 71 III 16 Creepage distance mm 900 17 Maximum fault clearing time ms not exceeding ms 18 Safety clearances 1.

7 Section clearance 3) Ground clearances( between ground and bottom most part of energised object) 4) Horizontal clearance between the fence and energised object 5) Horizontal clearance between the road centre line and energised part of the nearby equipment metres metres metres metres 4 4 As per Rules As per Rules 19 Bay width metres 20 Height of bus equipment interconnection from ground metres 4 21 Height of strung busbar metres DATA METEROLOGICAL Description Data Annual mean of maximum monthly average temperature. 50 Annual mean of minimum monthly temperature in oC 5 Average rain fall in mm 1500 Average thunder storms days per year 77days Design ambient temperature in oC 50 Maximum wind velocity in meter/sec. 50 Maximum relative humidity in % 100 Average relative humidity in % 85 Seismic co-efficient Horizontal Vertical Sub station Philosophy NESCO has adopted the philosophy of installing open terminal air insulated substations .

8 The bus bars may be of either rigid type or flexible strain type depending upon the choice of the designer considering the overall suitability and economy of the substation to be installed. a) Layout arrangement The Contractor shall finalize the layout arrangements in case of new substations in line with this SPECIFICATION with the approval of the Engg- In-charge which shall be meeting at least the basic minimum electrical clearances as specified in the schedules. a) Location and site description The Bidder shall make necessary visit to the substation sites and fully appraise himself before bidding. Deviations on account of inadequate data for substation works shall not be acceptable and the Bid shall not be considered for evaluation in such cases. b) Completeness and accuracy of information The Contractor shall note that the information provided above and in the relevant schedules may not be complete or fully accurate at the time of bidding.

9 For his own interest the Contractor is advised to make site visits and fully satisfy himself regarding site conditions in all respects, and shall be fully responsible for the complete design and engineering of the substations . GUARANTEDTECHNICAL PARTICULARS The Contract Works shall comply with the guaranteed TECHNICAL particulars specified or quoted in the bid. All plant and apparatus supplied under this Contract shall be to the approval of the Engg In-charge. Use of electrical energy The Contractor shall arrange at his own cost and expense, any site supplies of electrical energy which he may require for supplying power for heavy erection plant, welding plant or other tools, lighting and testing purposes. All wiring for such tackle and for lighting from the point of supply shall be provided by the Contractor and all such installations shall comply with all appropriate statutory regulations.

10 Wiring shall be of the best quality double insulated flexible cable, suitably fixed, protected and maintained. All necessary precautions shall be taken to ensure the safety of every person employed or working on the site and this shall include routine inspection of all temporary installations and portable equipment. The Engg In-charge or his authorised representative may require the disconnection or alteration of any parts which he may consider dangerous. As soon as any part or the whole of the Contractor s installation is no longer required for the carrying out of the works, the Contractor shall disconnect and remove the same to the satisfaction of the Engg In-charge or his authorised representative. SUPERVISION AND CHECKING OF WORK ON site All work on site included in the contractor s scope of works shall be supervised by sufficient number of qualified representatives of the Contractor.