Example: stock market

TRANSMISSION SPECIFICATION REFERENCE REV TRMSCAAC1 …

Note: Concerns queries and comments on this document should be referred to the compilerTRANSMISSIONSPECIFICATIONREFEREN CEREVTRMSCAAC13 TITLE: TRANSMISSION LINE TOWERSDATE:MARCH 2001 AND LINE CONSTRUCTIONPAGE1OF57 REVISION DATE:MARCH 2004 COMPILED BYFUNCTIONAL AppleyardEskom Enterprises (Pty.)Ltd. Line MohabirTx. Network OperationalEngineering MachinjikeTransmissionEngineering ManagerDATE:..DATE:..DATE:..This document has been seen and accepted by:NameDesignationTRANSMISSION LINE TOWERSREFERENCEREVAND LINE CONSTRUCTIONTRMSCAAC1 within the and of beacons at bend by the by the acceptance of phase and earth of ARevision LINE TOWERSREFERENCEREVAND LINE CONSTRUCTIONTRMSCAAC1 SPECIFICATION details the requirements for the design, detailing, fabrication, testing, supply,delivery and erect

TRANSMISSION LINE TOWERS REFERENCE REV AND LINE CONSTRUCTION TRMSCAAC1 3 PAGE 5 OF 57 4. Environmental 4.1 General 4.1.1 Supervision The Contractor shall give or provide all necessary superintendence during the execution of the works.The Contractor or a competent and authorised appointee approved of in writing by the Project Manager (which approval may at any time be …

Tags:

  Reference

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of TRANSMISSION SPECIFICATION REFERENCE REV TRMSCAAC1 …

1 Note: Concerns queries and comments on this document should be referred to the compilerTRANSMISSIONSPECIFICATIONREFEREN CEREVTRMSCAAC13 TITLE: TRANSMISSION LINE TOWERSDATE:MARCH 2001 AND LINE CONSTRUCTIONPAGE1OF57 REVISION DATE:MARCH 2004 COMPILED BYFUNCTIONAL AppleyardEskom Enterprises (Pty.)Ltd. Line MohabirTx. Network OperationalEngineering MachinjikeTransmissionEngineering ManagerDATE:..DATE:..DATE:..This document has been seen and accepted by:NameDesignationTRANSMISSION LINE TOWERSREFERENCEREVAND LINE CONSTRUCTIONTRMSCAAC1 within the and of beacons at bend by the by the acceptance of phase and earth of ARevision LINE TOWERSREFERENCEREVAND LINE CONSTRUCTIONTRMSCAAC1 SPECIFICATION details the requirements for the design, detailing, fabrication, testing, supply,delivery and erection of TRANSMISSION line towers and foundations, together with the erection of allconductors and associated line hardware and )

2 The Employer is the party for whom the works are to be executed and in this SPECIFICATION meansEskom and where applicable, includes Eskom s successor in title but not, except with the writtencontent of the Contractor, any assignee of ) The Contractor is the party appointed by the Employer to Provide the Works .c) The Project Manager is the person appointed by the Employer from time to time to act in thecapacity and notified, by name and in writing by the Employer to the Contractor, as required in TheNEC Engineering and Construction Contract.

3 D) The Supervisor is the person appointed by the Employer from time to time to act in the capacityand notified, by name and in writing by the Employer to the Contractor, as required in The NECE ngineering and Construction Contract . referencesThe following documents are to be read in conjunction with this SPECIFICATION . In cases of conflict, theprovisions of this SPECIFICATION shall take precedence. Unless otherwise stated, the latest revision,edition and amendments shall Manual No. 52 Guide for design of steel TRANSMISSION towersBS 183:1972 SPECIFICATION for general purpose galvanised steel wire 443:1982 SPECIFICATION for testing zinc coatings on steel wire and for 970 SPECIFICATION for wrought steels for mechanical and allied EN 287-1:1992 Approval testing of welders for fusion welding.

4 Part 1: Essential variables,range of approval examination and testing, acceptance requirements, re-tests, period of validity. Annexes on steel groups, welders test certificate,procedure SPECIFICATION and job EN 288-3:1992 SPECIFICATION and approval of welding procedures for metallic 3: Welding procedure tests for the arc welding of for angles in lattice TRANSMISSION towers, No. 82:1975 Bending dimensions of bars for concrete 135:1991 ISO metric bolts, screws and nuts (hexagon and square) (coarse threadfree fit series).SABS 182-5:1979 Zinc-coated steel wires for conductors and 471:1971 Portland cement (ordinary, rapid-hardening and sulphate-resisting).

5 SABS 626:1971 Portland blast furnace 675:1993 Zinc-coated fencing 471:1971 Hot-dip (galvanised) zinc coatings (other than on continuously zinc-coatedsheet and wire). (Appendix C to apply).SABS 831:1971 Portland cement 15 (ordinary and rapid hardening). TRANSMISSION LINE TOWERSREFERENCEREVAND LINE CONSTRUCTIONTRMSCAAC1 3 PAGE4OF57 SABS 920:1985 Steel bars for concrete 1083:1976 Aggregates from natural 1200-GE:1984 Precast concrete (structural).SABS 1431:1987 Weldable structural 1491-1:1989 Portland cement extenders, Part 1: Ground granulated blast furnace 1491-2:1989 Portland cement extenders, Part 2: Fly 1491-3:1989 Portland cement extenders, Part 3: Condensed silica 1466:1988 Portland fly ash 0100-1:1992 The structural use of concrete.

6 Part 1: 0100-2:1992 The structural use of concrete, Part 2: Materials and execution of 0144:1978 Detailing of steel reinforcement for 0162-1:1993 The structural use of steel, Part 1: Limit-states design of 0162-2:1993 The structural use of steel, Part 2: Limit-states design of 0162-3:1993 The structural use of steel, Part 3: Allowable stress design Method 862 Slump of freshly-mixed Method 863 Compressive strength of concrete (including making and curing of the testcubes).ESKCAAB4 Zinc coated earth conductor, guy and stay wire for TRANSMISSION linesESKASABG3 Bush clearance and maintenanace within overhead powerline , manufacturing and installation SPECIFICATION for TRANSMISSION of TRANSMISSION for the installation of overhead ground wire with optical fibre(OPGW)NWS 1074 Guy strand grips for TRANSMISSION 3402 Powerlines in the vicinity of aerodromes and hazards to of Agriculture Bulletin No.

7 399 ISBN0621082589, A primer on soil Conservation Act No. 73 of Act No 31 of , South African steel construction LINE TOWERSREFERENCEREVAND LINE CONSTRUCTIONTRMSCAAC1 Contractor shall give or provide all necessary superintendence during the execution of theworks. The Contractor or a competent and authorised appointee approved of in writing by theProject Manager (which approval may at any time be withdrawn) shall be on the works at all timeswhen work is being performed or when the Employer shall reasonably require it.

8 The Contractorshall employ only such persons that are competent, efficient and suitably qualified with relatedexperience in the environmental field. The Employer shall be at liberty to object to and require theContractor to remove from the works any person, who in the Project Manager s opinion,misconduct s himself or is incompetent in the proper performances of his against damagea) In accordance with applicable legislation, the Contractor shall take all reasonable precautions for theprotection of life and property on, or about, or in connection with the ) The Contractor shall comply strictly with the Special Conditions stipulated by the landowners in thenegotiated )

9 The Contractor shall comply with all the conditions specified in the Environmental Management Plan(EMP) during construction. In general, soil disturbance should be kept to a minimum. Thedisturbance of land contour banks or other erosion control structures shall be ) No damage shall be caused to any crops unless both the landowner and the Supervisor, prior to thework commencing agree upon the extent of the intended ) There shall be no littering of the veld. The Contractor shall provide suitable containers for any ) No fires shall be allowed on site under any ) The Contractor shall be held liable for all damage arising from actions or negligence on the part of hisworkforce and any such damage shall be repaired ) Any additional agreement concluded between the Contractor and a landowner not relating toProviding the Works, must be in writing and a copy made available to the Supervisor within 48 hoursof such an agreement being )

10 Any environmental incident as specified in the EMP, or accident during construction of the worksshall be immediately reported to the Contractor is to provide portable toilet facilities for the use of his workforce at all work no circumstances shall use of the veld be permitted. To prevent the occurrence of measlesin cattle, employees may require to be examined for tapeworm and treated, or treated irrespectiveof whether they are infested or not. Proof of such treatment is to be supplied to the drug Niclosamide (Yomesan, Bayer) is freely available and highly effective againsttapeworms in humans.


Related search queries