ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMANDAir-to-Ground Missile System (AGMS) Representative: Ashley MathisRank/Title of Presenter: JAMS Assoc. DirectorOrganization: Joint Attack Munition Systems (JAMS)5 Dec 2018 AMTC Collaboration Event, Day 2 19-02 Requirements PresentationsAMTC 19-02 Requirements #: GM 001 Distribution Statement A: Approved for Public Release3 AMTC 19-02 REQUIREMENT#: GM 19-001(U) GM-19-001:(U) Prototype:Software and Simulation Source, ENGINEERING White Papers, Technical Data Package. Theexpected prototype deliverables are the missiles and any additional hardware integrated within the weaponsystem. The feasibility of the prototype ( Target Discriminator) will be demonstrated/testedby both the Government and the Contractor. The expected prototype deliverable quantity is four (4) toinclude an advanced target decimation system module for air-to-ground missile insertion.

4 AIR-TO-GROUNDMISSILESYSTEM(AGMS) - The Government is looking for advancements in the dissemination, and command and control of sensor, weapons and communication interfaces that improve the ability to find, fix, finish, exploit,

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING …

1 ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMANDAir-to-Ground Missile System (AGMS) Representative: Ashley MathisRank/Title of Presenter: JAMS Assoc. DirectorOrganization: Joint Attack Munition Systems (JAMS)5 Dec 2018 AMTC Collaboration Event, Day 2 19-02 Requirements PresentationsAMTC 19-02 Requirements #: GM 001 Distribution Statement A: Approved for Public Release3 AMTC 19-02 REQUIREMENT#: GM 19-001(U) GM-19-001:(U) Prototype:Software and Simulation Source, ENGINEERING White Papers, Technical Data Package. Theexpected prototype deliverables are the missiles and any additional hardware integrated within the weaponsystem. The feasibility of the prototype ( Target Discriminator) will be demonstrated/testedby both the Government and the Contractor. The expected prototype deliverable quantity is four (4) toinclude an advanced target decimation system module for air-to-ground missile insertion.

2 (U) Requirement: The Government is seeking proposals for the DEVELOPMENT , integration, and demonstration of state-of-the-art hardware and software (HW/SW) for air/ground/sea missile applications that advance component, subsystem, system technologies for the Air-to-Ground Missile System (AGMS) to engage priority targets in complex environments. The desired outcome is a technical readiness level (TRL) 7+.(U) POC:Ashley Mathis, (256) 842-2538, POC: MAJA ndrew Rieck, (256) 876-2478, Funding: $10M; CL-34 AIR-TO-GROUNDMISSILESYSTEM(AGMS)- The Government is looking for advancements in the dissemination, and command and control of sensor, weapons and communication interfaces that improve the ability to find, fix, finish, exploit, and analyze target information. - DEVELOPMENT tasks for the prototype include, but are not limited to component and system level numerical simulations; algorithm and software DEVELOPMENT ; prototype hardware DEVELOPMENT ; performance verification testing over relevant environments; and integrated Hardware-In-the-Loop (HWIL), captive-carry, field, and flight Key advanced areas of interest are: Autonomous Systems Machine Learning Multiple Simultaneous Engagement Targeting Advanced Target Discrimination Novel non-GPS guidance systems5 KEYAGMS CHALLENGES- The AGMS requires mature technologies (component, subsystems, and software concepts).

3 - Evaluation criteria includes leveraging existing HW/SW, C4 ISR, platform infrastructure, and ICD. Performance should meet MIL STD for soldier safety and use. - Prior experience with other air-to-ground systems is critical to mitigate technical and program Potential Program Agreement Holders should identify any capabilities that are lacking or needed in order to accomplish their submission. - The number of deliverables may change based on testing, evaluation, and progress. - Looking at minimum starting TRL/MRL 5 with and ending TRL/MRL 7+ ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMANDAir-to-Ground Missile System (AGMS) Representative: Ashley MathisRank/Title of Presenter: JAMS Assoc. DirectorOrganization: Joint Attack Munition Systems (JAMS)5 Dec 2018 AMTC Collaboration Event, Day 2 19-02 Requirements PresentationsAMTC 19-02 Requirements #: GM 002 Distribution Statement A: Approved for Public Release7 AMTC 19-02 REQUIREMENT#: GM 19-002(U) GM-19-002:(U) Prototype:The prototype to be developed is a weapon management system hardware, software, andtechnical data package to evaluate the technical feasibility, manufacturing feasibility, and military utility forrapid retrieval and dissemination within the kill chain throughout DEVELOPMENT , testing, and operation useof the AGMS.

4 The expected prototype deliverable quantity is four (4) to include ground based (safetymanagement system). The feasibility of the prototype ( Flight Termination System) will bedemonstrated/tested by both the Government and the Project Agreement Holder. The prototype is applicableto ground/air/sea platforms.(U) Requirement: The Government is seeking proposals for the DEVELOPMENT of Weapon Management System (WSM) for air/ground/sea missile applications that advance component, subsystem, system technologies to increase the control, communications, and safety air-to-ground missiles. Advancements will improve the effectiveness and efficiency of future air-to-ground missile enhancements while reducing the DEVELOPMENT , testing, and operational system costs. The desired outcome is a system readiness level (TRL) 7+(U) POC:Ashley Mathis, (256) 842-2538, POC: MAJA ndrew Rieck, (256) 876-2478, Funding: $10M; CL-38- The Government is looking for the most cost effective digital flight termination system (DFTS) to test, evaluate, and train with advanced systems employed in complex environments while engaging multiple targets DEVELOPMENT tasks for the prototype include, but are not limited to, component and system level numerical simulations; algorithm and software DEVELOPMENT ; prototype hardware DEVELOPMENT ; performance verification testing over relevant environments.

5 And integrated Hardware-In-the-Loop (HWIL), captive-carry, field, and flight (AGMS)9 KEYAGMS CHALLENGES- The AGMS requires mature technologies (component, subsystems, and software concepts). - Evaluation criteria includes leveraging existing HW/SW, C4 ISR, platform infrastructure, and ICD. Performance should meet MIL STD for soldier safety and use. - Prior experience with other air-to-ground systems is critical to mitigate technical and program Potential Program Agreement Holders should identify any capabilities that are lacking or needed in order to accomplish their submission. - The number of deliverables may change based on testing, evaluation, and progress. - Looking at minimum starting TRL/MRL 5 with and ending TRL/MRL 7+ Providing the Warfighter s EdgeCapt Johnathan Rohde, PM, Positioning, Navigation & TimingAFLCMC/WNYDSN: Collaboration Event, Day 2 19-02 Requirements PresentationsAMTC 19-02 Requirements #: AV-002 DISTRIBUTION A.

6 Approved for public release: distribution unlimited. Providing the Warfighter s EdgeR-EGI Framework AF PNT Government Reference Architecture (GRA) & R-EGI PrototypesDegraded / Denied GPSAlt-Nav Resiliency Tailored to MissionINS + ClockDisciplined by GPS Assured Targeting Quality Nav( Vision Nav)BLUF: R-EGI is more that just a box, it is the Environment, LRU, and Architecturethat enables resilient PNT fusion engine w/multiple enroute Alt-Nav inputs- Celestial - Terrestrial- Magnetics -Atmospherics - Autonomous - CollaborativeMateriel & Non-Materiel Solutions Enabling Resilient Proactive CapabilitySolutions Developed, Verified, Validated & IntegratedPNT to Meet Mission Needs as the Threat EvolvesR-EGI Capability PipelineR-EGI DEVELOPMENT Environment(RDE) Modular Open LRUT echnology PNT Open Platform ArchitectureNew Threat EmergedNew Capability to SupportFlexibility through Open Standards & Software Defined Radios (SDR)

7 Digital ENGINEERING in Cloud-based developmentFlight SafetyCyber SecurityStandardsR-EGILRUM ission ComputerRadarGPSD isplayLegacy Data BusAlt PNT Future Growth Data Bus Connections (Government Reference Architecture)CameraLink Providing the Warfighter s Edge(U) AMTC-19-02:(U) Prototype:The expected prototype deliverable(s) are to be material(s) that deliverEmbedded GlobalPosition/Inertial Navigation (EGI) system performance. Materials delivered should include Inertial MeasurementUnit (IMU), Global Positioning System (GPS) receiver, processors, housing unit, backplane/sufficient data transfercapability, and software that drives Position, Navigation, and Timing (PNT) solutions.(U) Requirement: The Government is seeking proposals for a single system design agent. The system design agent will be referred as the Project Agreement Holder (PAH) throughout this document.

8 The PAH will be required to solicit, evaluate and manage a specific extent of diverse expert design teams from Government, Industry and Academia. The teams will participate in the DEVELOPMENT of an Open Architecture (OA), for a Positioning, Navigation & Timing (PNT) prototype that maximizes the ability to incorporate new technology and/or alternative PNT solutions in a timely and affordable fashion to defeat evolving PNT threats. This prototype will be considered for the Resilient Embedded Global Positioning/Inertial Navigation (GPS/INS) (R-EGI) System Program. The effort will be targeted at demonstrating and evolving the PNT architecture through instantiation in a Line Replaceable Unit (LRU) based on the EGI and EGI-Modernized (EGI-M) systems designed to support a Joint Armed Forces program. This ORD covers a 12 month period of performance for generation of a Government Reference Architecture (GRA) and proof-of-concept prototypes utilizing a Best of Breed competitive process.

9 (U) POC: Capt Johnathan Rohde, POC: Mr. Terrence May, $35,000,000;CL-1 AMTC 19-02 REQUIREMENT# Providing the Warfighter s EdgeKEYCHALLENGES ANDADDITIONALGUIDANCE-EGIs are typically closed off by the owning vendor making it very difficult to introduce new technology in a timely is more software drive than hardware driven now. This prototyping effort should evaluate/use open system architectures to the largest possible that allow for quick insertion of technology should be developed to either speed or eliminate certification process later procedures that allow for the protection of intellectual property and data rights while still allowing for quick adaptation and third party DEVELOPMENT in the Data Packages should be detailed enough that a separate entity could reproduce the prototype with no oversight from the original developer.

10 -Proposers should identify any capabilities that are lacking or needed in order to accomplish their submission. -Proposers need to be able to have flexibility to provide deliverables needed. Government has suggested a number of deliverables but that can change based on progress. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMANDMr. Jim Buford/Mr. Mark UmanskyS3I DirectorateApproved for Public Release. 30 Nov 18DD MMM YYYYAMTC Collaboration Event, Day 2 19-02 Requirements PresentationsAMTC 19-02 Requirement #: GM-004:Missile Defense Model & Simulation and Hardware in the Loop16(U) GM 19-04:(U) Prototype: S3I is seeking ideas/prototype deliverable(s) for Model and Simulations (M&S), prototype hypersonic HWIL, sensor/signal processing algorithms for analysis and assessment of offense and defense hypersonic capabilities for GFE emerging threats and intelligence situational awareness.