FormworkSince it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Spanhas grown to become one of the major players in the scaffolding and Formwork industry in South is today one of the biggest scaffolding suppliers in the country and has, in Investec Bank, a financial partner thatunderstands the scaffolding business and is committed to making capital available to increase capacity as demand and above its supply of Formwork and scaffolding to various contractors across diverse building sites, the companyis also involved in some of the country s key infrastructure and industrial development projects. Uni-Span is supplyingmain contractors and subcontractors providing insulation, cladding and painting services to the refineries, mines and powergeneration has its own design office and in-house engineering expertise and has the ability to design standard support, Formwork and access systems to the client s particular requirements.

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and formwork industry in South Africa.

Tags:

  Formwork

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Uni-Span Formwork ELEC1

1 FormworkSince it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Spanhas grown to become one of the major players in the scaffolding and Formwork industry in South is today one of the biggest scaffolding suppliers in the country and has, in Investec Bank, a financial partner thatunderstands the scaffolding business and is committed to making capital available to increase capacity as demand and above its supply of Formwork and scaffolding to various contractors across diverse building sites, the companyis also involved in some of the country s key infrastructure and industrial development projects. Uni-Span is supplyingmain contractors and subcontractors providing insulation, cladding and painting services to the refineries, mines and powergeneration has its own design office and in-house engineering expertise and has the ability to design standard support, Formwork and access systems to the client s particular requirements.

2 The design team calculates specific quantities andloadings of scaffolding and Formwork for each contract using the latest CAD WALL SYSTEMThe Uni-Span system consists of all steel economy panels. These areavailable in a combination of sizes from 75mm to 600mm wide and900mm to 3000mm long. Special sizes can also be made to panels are joined by wedge sets which are inserted through slotsin the punched flat which forms the edge of the panels are aligned by either tube or channel walers which areclamped to the panels with B or C heavy duty concrete work, form soldiers are used. The panels arethen gangformed and crane panels are tied together to form parallel faces using tie versatile panel system can be used to construct: walls , columnsbeams, culverts, bridges and pile panel system consists of 6 basic elements: Steel economy panels,tubular or channel walers, wedge sets, tie systems, push-pull propsor plumbing brackets and access PANELE conomy panels are an advanced multi-purpose Formwork systembecause.

3 -Stiffeners are built into the panel, therefore only two scaffoldtube or channel walers are required for clamps are required-Rapid assembly with wedge sets-Can easily be erected by unskilled labour-Accommodates any tie system-Durable steel face plate cannot be damaged by vibrators orpenetrated by the reinforcing steel-The automatic precision on assembly, results in 100%dimensional accuracy of the finished concrete-Multi use - walls and deckingLengthmmWidthmmMasskgLengthmmWidt hmmMasskgLengthmmWidthmmMasskgLengthmmWi dthmmMasskgThe economy panel s main application is for vertical can also be used for horizontal beam soffits and for slabswhere an off the shutter finish is - 300mm wideClip & Wedge SetMass panels Duty Wedge SetMass panels AssemblyMass column boxes and uniform C ClampConnects channel to economy panel.

4 B ClampMass rapid connection of tube to panels foraccurate alignment. C ClampMass rapid connection of channel to panelsfor accurate Panel ClampMass form soldiers to Waler ClampMass tube to form Waler ClampMass channel to form CORNER PANELICP s come in the full range of EF Panel lengths forming 150 x 150mm internalcorners. They can be used for the internal corner between a drop beam andslab soffit as well as vertical (mm) Mass (kg)3 000 x 150 x 700 x 150 x 400 x 150 x 100 x 150 x 800 x 150 x 500 x 150 x 200 x 150 x 900 x 150 x PLATEF iller plates fill in gaps when using non-standardmodules and facilitate stripping in confined CORNER ANGLEECA s have a fixed size of 50mm x 50mm and are used toconnect the panels at a 90o angle on walls or PANELD esigned to obtain 135o corners.

5 Two of these panelsmay be used in conjunction with a small timber strip toobtain different face SPLAY PANELSize (mm) Mass (kg)1 200 x 200 x 100 x 135o External 900 x 200 x 100 x 135o External SPLAY PANELSize (mm) Mass (kg)1 200 x 200 x 100 x 135o Internal 900 x 200 x 100 x 135o Internal (mm) Mass (kg)3 000 x 700 x 400 x 100 x 800 x 200 500 x 200 200 x 200 900 x 200 (mm) Mass (kg)3 000 x 50 x 700 x 50 x 400 x 50 x 50 100 x 50 x 50 800 x 50 x 50 500 x 50 x 50 200 x 50 x 50 900 x 50 x 50 SYSTEM - ERECTION PROCEDUREFor Crane Handled Gangform System1. The panels are laid out on a flat surface and joined with wedge Tubes and/or channels are attached to the panels with B or C The assembled wall is lifted into position either manually or with Ties are inserted through the tie holes.

6 The plastic tube having beencut to the correct length in accordance with the width of the concretewall to be Push-pull props are secured to the ground and to the gangform andare adjusted to achieve accurate vertical wall plan showing a panel layout of economy panels and internalcorner panels using aligning channels with ties through the panel ontotwin channel faced economy panels and single channel aligning walers includingform soldiers complete with plumbing and access bracket of external and internal wall systemFORM SOLDIERSThe form soldier is used for gangform wall shutters wherecrane handling is available. The shutter becomes a precisionunit ideal for perfect off the shutter finishes. Structural web system enables ties and anchors to bepositioned anywhere in its height.

7 Ideally suited for climbing Formwork . Can be used as bearers for heavy soldiers have plan dimensions of 300m deep x of major axis:Moment of inertia 3 598cm4 Section modulus 240cm3 Allowable tie load 85kN at any soldier I = 3598cm4 Z = 240cm3 Size (mm) Mass (kg)3 BOTTOM PLATEP anel clamp for connectinghorizontal steel panels directly tothe face of the form plate facilitates fixing orlifting. This bolts directly to thebottom of the form soldier kgForm soldier gangform assemblyAn assembled gangform shutter with economypanels. Vertically assembled. Horizontal 100x 50 channel walers are C clamped to thepanels and fastened to the form soldiers withchannel waler assembled gangform shutter with economypanels.

8 Vertically assembled. Standard scaffoldtube is B clamped to the panels and fastenedto the form soldiers with tube waler are assembled horizontally and fastenedto the form soldier with form panel and bottom aligning channels are usedon the form soldier to give strength to the PROPThe push-pull prop has a double collar, which enablesthe walls and columns to be accurately plumbed. Usedon walls and column boxes for speedy erection andease of (mm)Mass (kg)No 11 676 - 3 21 981 - 3 32 590 - 3 43 200 - 4 Swivel Foot Assembly : Alignment channel at back ofform soldiers for aligning gangformsWall systemFLEXFORM PANELSF lexform panels are used for the construction of curved walls witha radius of between 3 and 20 tube is radiused to the required diameter and then the flexformpanel is fastened to the tube to create the circular shutter required.

9 Filler panels are used on the external shutter to accommodatethe difference in the outside panel has a 2mm steel face plate and is attached to theradiused tube with B (mm) Mass (kg)1 500 x 500 x 200 x 200 x 900 x 900 x WALL TIE ASSEMBLYAll items are recoverable after casting, except forthe plastic of safety (mm)kg/mLoad 40 FERRULE TIE SYSTEMAll components fully recoverable except for the ferrule BAR TIEP ositive stop-in cone gives accurate wall bar ties are similar to crimp ties except that the barsare made of 12, 20 or 24mm mild steel bars. (Also availableas water ties).WATER BAR TIEFERRULE TIGHTENER JACKTo tension rods prior to tightening the ferrule grub systemANCHOR SCREWSR ecoverable anchor screws are used for fixing brackets and Formwork to TOOLThe anchor screws are cast in and areeasily removed using an extractor screw bolted onto standardeconomy loading capacities are based on a loadfactor of :1 on ultimate pull-out :Although graph is based on actual tests, it isgiven as a general guide only.

10 Where warranteda greater safety factor should be CORNER FILLET50mm lip of plastic corner with slots to attach to economypanels with wedge sets, and wedge assemblies for attachingto columns. When dismantling Formwork , plastic cornerscome off automatically and are ready for (mm)b (mm)c (mm)101014151517181825202028252535 PLASTIC SHUTTER BUTTONUsed for closing ferrule tie holes in steel ortimber shutters. Available for different sizeholes. Inexpensive and self-adhesive polyurethane foam sealingstrip which prevents grout loss through jointsin FERRULE TUBINGP lastic tubing replaces more expensive materials. Used to facilitate recoveryof thru ties. Supplied in up to 3m PLASTIC CONETo be attached to each end of ferrule tubing.