MIL-STD-881D 9 April 2018 superseding MIL-STD-881C 3 October 2011 DEPARTMENT OF DEFENSE STANDARD PRACTICE WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL ITEMS AMSC 9915 AREA MISC NOT MEASUREMENT SENSITIVE MIL-STD-881D (THIS PAGE LEFT INTENTIONALLY BLANK) MIL-STD-881D iii FOREWORD 1. This Standard is approved for use by all Departments and Agencies of the Department of DEFENSE (DoD). It is for direction and should be included as a contract requirement. 2. This Standard addresses mandatory procedures for all programs subject to DoD Instruction 3. This military standard is applicable to all DEFENSE MATERIEL items (or major modifications) (a) established as an integral program element of the Future Years DEFENSE Program (FYDP), or (b) otherwise designated by the DoD Component or the Under Secretary of DEFENSE (Acquisition).

Apr 09, 2018 · mil-std-881d. 9 april 2018. superseding mil-std-881c . 3 october 2011 . department of defense standard practice . work breakdown structures for defense materiel items . amsc 9915 area misc . not measurement sensitive

Tags:

  Superseding, Superseding mil std

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL …

1 MIL-STD-881D 9 April 2018 superseding MIL-STD-881C 3 October 2011 DEPARTMENT OF DEFENSE STANDARD PRACTICE WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL ITEMS AMSC 9915 AREA MISC NOT MEASUREMENT SENSITIVE MIL-STD-881D (THIS PAGE LEFT INTENTIONALLY BLANK) MIL-STD-881D iii FOREWORD 1. This Standard is approved for use by all Departments and Agencies of the Department of DEFENSE (DoD). It is for direction and should be included as a contract requirement. 2. This Standard addresses mandatory procedures for all programs subject to DoD Instruction 3. This military standard is applicable to all DEFENSE MATERIEL items (or major modifications) (a) established as an integral program element of the Future Years DEFENSE Program (FYDP), or (b) otherwise designated by the DoD Component or the Under Secretary of DEFENSE (Acquisition).

2 This Standard is mandatory for all Acquisition Category (ACAT) programs. This revision has resulted in many changes being incorporated into MIL-STD-881D, but the most significant ones include the following: a. Appendix A - Aircraft Systems and Appendix H - Unmanned Aircraft Systems have been merged into a new Appendix A - Aircraft Systems, since unmanned aircraft are considered Aircraft Systems. b. Appendix C Missile Systems and Appendix D Ordnance Systems have been merged into a new Appendix C Missile/Ordnance Systems which focuses on tactical missiles and munitions due to their commonality in structure and intent. c. Appendix D is now Strategic Missiles Systems which focuses on Intercontinental Ballistic Missiles (ICBM) and strategic missiles used by Missile DEFENSE Agency.

3 Previously strategic missiles were part of Appendix C Missiles Systems. d. New and revised definitions have been incorporated into Appendix F Space Systems to improve clarity and understanding of application. e. Changed the title of Appendix G from Surface Vehicle Systems to Ground Vehicle Systems to reflect the common terminology for land and amphibious systems. f. Changed the WBS in Appendix G Ground Vehicle Systems to reflect the approach to buying family of systems vehicles ( , variants). g. Changed the title of Automated Information Systems (now Appendix J) to Information Systems/ DEFENSE Business Systems to reflect DoDI : Business Systems Requirements and Acquisition.

4 H. Added a Sustainment Structure for Information Systems/ DEFENSE Business Systems (Appendix J) to recognize the overlap of acquisition and sustainment activities on the acquisition contract. For IS/DBS, this structure MIL-STD-881D iv should be used to appropriately reflect sustainment activities on IS/DBS programs. i. Added and defined in the Common Elements Appendix (Appendix K) required reporting elements under Systems Engineering, Program Management, and System Test and Evaluation related to Integrated Logistics Support, Software Engineering and Management, and Cybersecurity. j. Required Rate Tooling to be separately identified within Integration, Assembly, Test, and Checkout at the appropriate level.

5 K. Further defined Peculiar Support Equipment and Common Support Equipment (Appendix K) to a lower level which identifies the subassembly the equipment supports, ( , Airframe/Hull/Vehicle, etc.). l. Added Contractor Logistics Support (CLS) (Appendix K) to reflect that contractor sustainment support may be completed at the depot during the acquisition phase. m. Added Data Rights under Data (Appendix K) to reflect the Government purchase of contractor data rights. n. Included the Cost Assessment Program Evaluation (CAPE) Sustainment Cost Reporting Structure (CRS) (Appendix L) to provide a description of the transition between the Work BREAKDOWN Structure (WBS) to the CRS during a program.

6 4. A Work BREAKDOWN Structure (WBS) provides a consistent and visible framework for DEFENSE MATERIEL items and contracts within a program. This Standard offers uniformity in definition and consistency of approach for developing all levels of the WBS. Generating and applying uniform work BREAKDOWN STRUCTURES improves communication in the acquisition process. It also provides direction to industry in extending contract work BREAKDOWN STRUCTURES . 5. This Standard supersedes MIL-STD-881C, dated 3 October 2011, titled Work BREAKDOWN STRUCTURES for DEFENSE MATERIEL Items. MIL-STD-881D is based on the cooperative efforts of the military services with assistance from industrial associations.

7 Changes to the Standard specifically address advances in technology and modifications of the acquisition process, and incorporates new MATERIEL items, development concepts, and approaches. 6. Comments (such as recommendations, additions, or deletions) and any pertinent information, which may be useful in improving this document, should be addressed to the Office of the Performance Assessment and Root Cause Analysis (PARCA), 3620 DEFENSE Pentagon, Rm 3C889A, Washington DC 20301-3620. Since contact information can change, you may want to verify the currency of this address information using the ASSIST online database at MIL-STD-881D v (THIS PAGE LEFT INTENTIONALLY BLANK) MIL-STD-881D vi CONTENTS PARAGRAPH PAGE FOREWORD.

8 I 1. GENERAL INFORMATION Standard Purpose and 1 Support Documentation .. 1 What Does a WBS Accomplish? .. 2 Applications .. 2 Benefits .. 3 Challenges .. 3 How is the WBS Related to Other Contract Requirements? .. 3 Definitions .. 3 Program Element (PE).. 4 DEFENSE MATERIEL Item .. 4 Work BREAKDOWN Structure (WBS) .. 4 Common Elements .. 4 Level Identification .. 5 Program WBS .. 6 Contract WBS .. 6 Subcontract WBS .. 6 WBS Evolution .. 6 2. GOVERNMENT PROGRAM MANAGEMENT INSTRUCTIONS Program WBS 8 Preparing a Program WBS .. 8 Developing and Documenting a Program WBS .. 8 Selecting Program WBS Elements.

9 9 Determining Levels of Program 9 Creating the WBS Dictionary .. 12 Avoiding Pitfalls in Constructing a 13 Requirement for WBS Element Exclusions .. 13 Additional Considerations .. 14 Solicitation and Proposal .. 14 Contractor Management Control System .. 14 Acquisition Logistics .. 14 Planning, Programming, Budgeting, and Execution (PPBE) System .. 14 Life Cycle 14 Procurement .. 15 Reporting .. 15 Contract Statement of Work (SOW) .. 15 MIL-STD-881D vii PARAGRAPH PAGE Request for Proposals (RFP) .. 15 Preparing a Preliminary Contract WBS .. 15 RFP Solicitation Requirements .. 15 Extended Contract WBS.

10 15 Integrated Cost, Schedule, and Technical Performance and Risk Management .. 15 3. CONTRACTOR INSTRUCTIONS Developing the Contract WBS .. 16 Relationship of Program WBS to Contract WBS .. 16 Subcontractors .. 16 Contractor s Organizational Structure .. 17 Control Account Level .. 17 Programmatic Issues in WBS Development .. 18 System of Systems (SoS) .. 18 Family of Systems .. 18 Cybersecurity .. 19 Software and Software Intensive Systems .. 19 Information Systems (IS)/ DEFENSE Business Systems (DBS) .. 19 Software Operating on Specific Equipment .. 19 Visibility into Software Development Processes .. 19 Integrated Master Plan and Integrated Master Schedule (IMP/IMS).