Example: bachelor of science

Work Write Up / Specification of Repairs

work Write Up / Specification of RepairsSignature of 203(k) No.: / /FHA Loan of HUD Telephone Phone Completion MonthsJOHN TAYLOR(703) 754-3766 ACQUIRED HOME SERVICES , 4 NUMBER ONE GOOD ROADMETRO, VA 20000 GREAT CLIENTS ignature ClientDate:Date:Toll Free 1-877-932-7177 Paperport 2000 official estimating report DIVISIONC oncrete for footer and block installedfor foundation walls. 3000 $ $ $ 203(K) DIVISION 1$ DIVISIONI nstall composite special lap siding onexterior wall for weather protection.

Work Write Up / Specification of Repairs Signature of 203(k) Consultant. Appraiser. Telephone No.: / / FHA Loan No. Name of HUD Consultant. Consultant Telephone No.

Tags:

  Specification, Repair, Work, Write, Work write up specification of repairs

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Work Write Up / Specification of Repairs

1 work Write Up / Specification of RepairsSignature of 203(k) No.: / /FHA Loan of HUD Telephone Phone Completion MonthsJOHN TAYLOR(703) 754-3766 ACQUIRED HOME SERVICES , 4 NUMBER ONE GOOD ROADMETRO, VA 20000 GREAT CLIENTS ignature ClientDate:Date:Toll Free 1-877-932-7177 Paperport 2000 official estimating report DIVISIONC oncrete for footer and block installedfor foundation walls. 3000 $ $ $ 203(K) DIVISION 1$ DIVISIONI nstall composite special lap siding onexterior wall for weather protection.

2 1500 $ $ $ 203(K) DIVISION 2$ & DIVISIONI nstall gutter and downspouts alongfascia. 150 $ $ $ 203(K) DIVISION 3 $ DIVISIONI nstall aluminum coil stock flashing atroof locations. 50 $ $ $ wood truss for roofstructures. 27 $ $ $ new 5/8" plywood roof sheathing. 1000 $ $ $ felt is attached to roofingsubstrate to stop moisture seepage. 1000 $ $ $ new upgrade shingles on roofsubstrate. 1000 $ $ $ metal drip edge flashings at roofedges. 100 $ $ $ 203(K) DIVISION 4$ DIVISIONI nstall new wood shutters at existingwindow units.

3 9 $ $ $ 203(K) DIVISION 5 $ DIVISIONI nstall exterior deck structure, at groundlevel for walk down stair with rail fromnew exterior door. 50 $ $ $ new exterior grade plywood soffitbeneath overhangs. 35 $ $ $ 1x6" wood trim for rake boards ongable ends. 60 $ $ $ new wood fascia board on roofedges. 35 $ $ $ 203(K) DIVISION 6 $ DIVISION 0 $ $ $ 203(K) DIVISION 7 $ DIVISION 0 $ $ $ 203(K) DIVISION 8 $ DIVISIONP aint exterior trim, with acrylic paint, forweather protection.

4 500 $ $ $ of exterior surfaces forrepainting. 500 $ $ $ 203(K) DIVISION 9 $ DIVISIONC aulk interior joints in order to preventwater penetration. 125 $ $ $ exterior joints in order to preventwater penetration. 125 $ $ $ 203(K) DIVISION 10 $ DIVISION 0 $ $ $ 203(K) DIVISION 11 $ DIVISIONE xcavation w/ machine forfootings/foundation. 1000 $ $ $ 203(K) DIVISION 12 $ DIVISIONI nstall wood/vinyl double hung windowswith light window above as allowed byhistoric regulations.

5 9 $ $ $ 203(K) DIVISION 13 $ DIVISIONW eatherstrip door in order to prevent airpenetration. 1 $ $ $ 203(K) DIVISION 14 $ (EXTERIOR)UNIT/QTYMATERIALTOTAL15 LABORHUD DIVISIONI nstall lighted door in exterior wall. 1 $ $ $ 203(K) DIVISION 15 $ (INTERIOR)UNIT/QTYMATERIALTOTAL16 LABORHUD DIVISIONI nstall new interior hollow core pre-hungdoor. 5 $ $ $ 203(K) DIVISION 16 $ WALLSUNIT/QTYMATERIALTOTAL17 LABORHUD DIVISIONCut opening in exterior wall to installnew opening. 160 $ $ $ new interior stud wall framing withwood 2x4s.

6 2100 $ $ $ new 1/2" plywood wall sheathing. 1600 $ $ $ treated 2x8" installed onfoundation for sill plate. 100 $ $ $ 203(K) DIVISION 17 $ & DRYWALLUNIT/QTYMATERIALTOTAL18 LABORHUD DIVISIONI nstall new 1/2" gypsum board drywall. 2400 $ $ $ new ceiling drywall. 1400 $ $ $ 203(K) DIVISION 18 $ DIVISIONP aint finished surface of interior wallsand /or ceiling. 3800 $ $ $ interior trim with semi-gloss paint,for finish and desired color. 300 $ $ $ interior of windows, includingframes, jambs & casings.

7 9 $ $ $ interior of door, frame, jamb andcasing. 4 $ $ $ of interior surfaces forrepainting. 3800 $ $ $ 203(K) DIVISION 19 $ TRIMUNIT/QTYMATERIALTOTAL20 LABORHUD DIVISIONI nstall base trim work to cover bottom ofdrywall at floors. 400 $ $ $ 203(K) DIVISION 20 $ DIVISION 0 $ $ $ 203(K) DIVISION 21 $ DIVISIONI nstall new prefab metal shelf system. 30 $ $ $ 203(K) DIVISION 22 $ FLOORSUNIT/QTYMATERIALTOTAL23 LABORHUD DIVISIONI nstall new 5/8" plywood subfloor. 1500 $ $ $ new 2x12" floor joist.

8 1500 $ $ $ 203(K) DIVISION 23$ FLOORSUNIT/QTYMATERIALTOTAL24 LABORHUD DIVISIONI nstall new plush grade carpet with newpadding. 900 $ $ $ new wood strip flooring. 900 $ $ $ 203(K) DIVISION 24$ TILEUNIT/QTYMATERIALTOTAL25 LABORHUD DIVISIONI nstall new ceramic wall tile. 200 $ $ $ new ceramic tile flooring overlevel subfloor. 200 $ $ $ 203(K) DIVISION 25 $ ACCESSORIESUNIT/QTYMATERIALTOTAL26 LABORHUD DIVISIONI nstall medicine cabinet, flush to wall. 2 $ $ $ 203(K) DIVISION 26 $ DIVISIONP lumbing Repairs : 1 hr of labor forplumbing Repairs .

9 3 $ $ $ new faucet for kitchen sink. 1 $ $ $ gray box for clothes washer waterdrain line. 1 $ $ $ new lavatory sink faucet. 2 $ $ $ new stainless double kitchen sink. 1 $ $ $ bathroom pedestal sink andhardware. 2 $ $ $ new built in tile walled showerstall with bench tile. 2 $ $ $ new toilet in bathroom. 2 $ $ $ new complete bath/showerfixture. 2 $ $ $ new copper water supply lines forfixtures. 30 $ $ $ schedule 40 PVC waste line andvent stack for fixtures.

10 35 $ $ $ soaking tub installed inbathroom. 2 $ $ $ new exterior hose bib on existingplumbing system. 1 $ $ $ 203(K) DIVISION 27$ DIVISIONI nstall new exhaust fan for ventilation. 2 $ $ $ new ceiling mountedincandescent light fixture. 16 $ $ $ light fixture for exterior lighting. 1 $ $ $ new hard wired ceiling mountedsmoke detector. 2 $ $ $ light fixture installed on ceilingsurface. 2 $ $ $ thermostat for heating and coolingof interior space. 1 $ $ $ new 200 amp service and meter.


Related search queries