Example: dental hygienist

YOUR SOURCE FOR COMPLETE LIGHT GAUGE STEEL TRUSS …

YOUR SOURCE FOR COMPLETE LIGHT GAUGE STEEL TRUSS SYSTEMSQ uality products and service based onyears of experience in the building component SOURCE for LIGHT GAUGE STEEL TRUSS today s demanding architectural designs, intricate roof lines, and aggressiveschedules, LIGHT GAUGE STEEL trusses have become a popular product for architects, engineers, builders and , Inc. can design an engineered, pre-fabricated LIGHT gaugesteel TRUSS system specifically for your project, incorporatingmost any design, including gables, hips, valleys, dormers,retail canopy fronts, and much TRUSS systems are pre-fabricated in a controlledatmosphere in our plant, and shipped to yourjobsite, ready for us at any time to discuss designpossibilities for your next , INC.

When specifying and purchasing light gauge steel trusses for your next commercial/institutional project, be sure to insist on the most comprehensive system available today. The Ultra-Span® System from Aegis Metal Framing offers building designers and contractors real peace of mind. They know all the key elements of a

Tags:

  Steel, Light, Gauge, Farming, Rust, Light gauge steel truss

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of YOUR SOURCE FOR COMPLETE LIGHT GAUGE STEEL TRUSS …

1 YOUR SOURCE FOR COMPLETE LIGHT GAUGE STEEL TRUSS SYSTEMSQ uality products and service based onyears of experience in the building component SOURCE for LIGHT GAUGE STEEL TRUSS today s demanding architectural designs, intricate roof lines, and aggressiveschedules, LIGHT GAUGE STEEL trusses have become a popular product for architects, engineers, builders and , Inc. can design an engineered, pre-fabricated LIGHT gaugesteel TRUSS system specifically for your project, incorporatingmost any design, including gables, hips, valleys, dormers,retail canopy fronts, and much TRUSS systems are pre-fabricated in a controlledatmosphere in our plant, and shipped to yourjobsite, ready for us at any time to discuss designpossibilities for your next , INC.

2 NReliable and cost-effective way for developing large or small scale commercial, institutional or SYSTEMSnUnlimited possibilities for commercialroof Pre-fabricated LIGHT GAUGE STEEL TrussSystemsengineered for your specific specifying and purchasing LIGHT GAUGE STEEL trusses for your nextcommercial/institutional project, be sure to insist on the most comprehensive systemavailable today. The Ultra-Span System from Aegis Metal Framing offers buildingdesigners and contractors real peace of mind. They know all the key elements of aproperly functioning structural system are designed and you select All-Span to design and manufacture your pre-fabricated TRUSS sys-tem, you are selecting an experienced TRUSS specialist. Utilizing state-of-the-art lightgauge design software, All-Span can efficiently and accurately bid a COMPLETE trusssystem that can include all of the following items: All trusses, including girders, valleys, and specials TRUSS -to- TRUSS and TRUSS -to-bearing connections Special connections TRUSS spacing and installation bracing products Permanent bracing Hip, ridge, and valley platesAll designed and manufactured to work together as the industry s only true system!

3 Computer designed for precision and factory built for quality and consistency, pre-fabricated Ultra-Span trusses are the ideal, cost-effective alternative to structuralsteel, bar joist, fire-treated wood, and site-assembled cold formed metal All-Span for more information on the comprehensive Ultra-Span system!THE ULTRA-SPAN SYSTEMVERSATILEnCOST EFFECTIVEnCOMPREHENSIVENON-COMBUSTIBLE2 ENGINEERED BRACING LAYOUTST hese layouts specify location of all permanent lateral bracing requiredfor each specific job. The bracing is then drawn on the layout in easy toread format. Details are provided for attachment of bracing to the layout is stamped by a professional engineer registered in the statethat the job is located. This product is especially important for jobs thathave intricate TRUSS AND SPECIAL CONNECTION DETAILSAre provided to ensure ease of construction34 ALL-SPAN, INC.

4 PROJECT PROFILEH oward T. Ennis School,Georgetown, DEAll-Span, , DEFABRICATORPROJECTThe obvious solution to theseretrofit challenges was a slopedroof with a built-in mechanicalspace. Although the traditionalapproach would have been to utilizea structural post and purlin system,the architect wanted to ensure suffi-cient area for the new air handling units, as well as minimize the number of pene-trations in the existing roof membrane. All-Span, brought in to helpdesign an optimal re-roof system to provide an attractive, low maintenance slopedroof while minimizing installation time and classroom minimize the number of trusses (and the installation time required), wedesigned two mono trusses spaced 6 feet on center to cover the 82' x 305' mainschool building.

5 A short pony wall was built up along the exterior bearing wallsand a row of stub posts spaced 6' were installed along the center of the exist-ing roof. With only one center bearing, the number of roof penetrations wasreduced from several hundred for a traditional post and purlin system to only 50 or so for the Ultra-Span installation andmaintenance access for thenew rooftop units was easilyaccomplished by designingand building a large mechan-ical room into the trussescovering those areas wherethe units would be the assistance of the precise layout, connection, and engineered bracing dia-grams (an Ultra-Span system exclusive!) that All-Spanprovided, the TRUSS installerwas able to retrofit the Ennis school in just two weeks!

6 And, by working evenings andweekends, no class time was lost (great news for the parents and educators, badnews for the kids!) The Howard T. Ennis re-roof is a perfect example of how we can helpcompress construction cycles andreduce total cost through the speedand efficiency of pre-engineered, factory-built Ultra-Span TRUSS systems are most commonlyused in new construction, this project is an outstandingexample of how Ultra-Span can be incorporated in aretrofit Howard T. Ennis School was like so many other educational facilities builtduring the 1960 s. The one-story brick structure was designed with a flat hot tarand gravel roof system. As with most such roofs of this vintage, water leakage and seepage had become a major problem, creating a costly, repetitive mainte-nance nightmare.

7 In addition, the school district wanted to install new rooftopmechanical units for each classroom that could be hidden from :The 40+ year oldflat hot tar/gravel roof wasbeginning to :A great-looking new roof. 5 OTHER ALL-SPAN, INC. PROJECTSV ariousAll-Span, , DEFABRICATORPROJECTT ight radius TRUSS design creates a striking roofline for a 7-floor building In addition to its traditional roof shapes, this building employs a tight-radiuscurve as the building s signature design element. This TRUSS profile employs both a radius top,and built-in gutter and soffit returns can be applied inour plant on most Tie-In TRUSS Reaction (lbs.) (full BCdepth) Attach to girderbottom chord at 12" or10" oc with #10 screws 4 into " or 10" between (full length of TRUSS )Attach to USW18 w/3 -#10 screws ( )Attach USKW to USGP w/4 -#10 screws USKW Connector - Attachto TRUSS between end vertical and bottom chordw/ #10 screws as requiredfor the tie-in TRUSS reactionand bottom chord gaugeAllowable Tie-In TRUSS Reaction (lbs.)

8 USW Spacing (In)Tie-in trussbottom chd.#10 s2 AEGIS USKW CONNECTION DETAILHip Jack to Back Face of GirderAttach USKW to USGP-Xw/4 #10 screws45 to 135 USGP-X (full length of TRUSS ).Attach to top flange andlower web w/ #10 screws at 5" ocUSKW ConnectorAttach to TRUSS between end vertical and bot-tom chord w/ #10 screws as required for thetie-in TRUSS reaction and bottom chord w/ " USKW35 USC035 35 USC046 35 USC0574970160016006160049701670190061450 190081900#10 sTie-in TRUSS Bottom USTCC TOP CHORD CONNECTORF actory installed and USTCC to top chordof Hip Girder with (1) #8 or#10 low profile SDS. Bend tothe required angle and attachto Common Jack with (2) #8or #10 low profile USTCC to attach topchord of Common Jack totop chord of Hip Girder5 AEGIS USCJC HIP CORNER JACK CONNECTORUse USCJC to attach topchord of Corner Jack totop chord of Corner GirderAttach USCJC to top chordof Corner Girder with (1) #8 or #10 low profile wings to the requiredangle and attach to CornerJack with (2) #8 or #10 lowprofile HAT CHANNELT emporary & Permanent Bracing Member3-1/8"1-1/2"45 to 135 TRUSS TO GIRDER CONNECTION DETAILAlsoHip Jack to Front Face of Girder(using the USKW and USGP System)6 ULTRA-SPAN Maximum Uplift Capacity7 ULTRA-SPAN TRUSS UPLIFT CONNECTION TO I-BEAM w/423HD141) Web or heel stiffener attached with (4) #10 )

9 Minimum screw spacing = 9/16".3)Uplift values include increase for wind or seismic. No furtherincrease is permitted. For uplifts not resulting from wind or seismic,reduce capacities to 75% of values ) Minimum STEEL thickness = 3/8".See Fastener Manufacturer s recommendation for )Fill holes in GAUGE #10 SDSU plift (lbs.)035412000463120005721200#10 Self-drilling Screws(2) Hilti X-ZF PAF (or equivalent)423HD14 Min. edge distance = 1"#10 Self-drilling Screws(2) Hilti X-ZF PAF (or equivalent)423HD14 Min. edge distance = 1"Maximum Uplift Capacity6 ULTRA-SPAN TRUSS UPLIFT CONNECTION TO I-BEAM w/ 426HD141) Web or heel stiffener attached with (8) #10 ) Minimum screw spacing = 9/16".3) Uplift values include increase for wind or seismic.

10 No furtherincrease is permitted. For uplifts not resulting from wind or seismic,reduce capacities to 75% of values )Minimum STEEL thickness = 3/8".See Fastener Manufacturer s recommendation for ) Fill holes in GAUGE #10 SDSU plift (lbs.)035619400465240005742400#10 Self-drilling Screws(4) Hilti X-ZF PAF (or equivalent)426HD14 Min. edge distance = 1"#10 Self-drilling Screws(4) Hilti X-ZF PAF (or equivalent)426HD14 Min. edge distance = 1"7 ULTRA-SPAN 1) When permitted by building code and job specification, uplift values may be increased by Uplift must be the direct result ofwind or seismic loading. In no case shall the uplift exceed 1200 ) TSB attachment to USWD can be reduced to (4) - #10 sds withUSWD ) Minimum screw spacing and edge distance = 9/16".


Related search queries