A. Introduction - NERC
Standard Transmission and Generation Protection System Maintenance and testing Page 1 of 6 A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and testing 2. Number: 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested. 4. Applicability Transmission Owner. Generator Owner. Distribution Provider that owns a transmission Protection System. 5. Effective Date: In those jurisdictions where regulatory approval is required, all requirements become effective upon approval.
Standard PRC-005-1.1b — Transmission and Generation Protection System Maintenance and Testing Page 3 of 6 protection of radially connected transformers 1a February 17,
Download A. Introduction - NERC
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
ADVANCED RUBBER TESTING TECHNOLOGIES, Testing, CARBURETOR POP-OFF PRESSURE TESTER, CARBURETOR POP-OFF PRESSURE TESTER INSTRUCTIONS, Line, Testing Medical Device and Package Integrity, Electrical Safety Testing, Leak Testing and Special Application for assembly, SOFTLINES TESTING QUALITY ASSURANCE, SOFTLINES TESTING QUALITY ASSURANCE MANUAL TravelSmith, Guide to ATP Hygiene MonitoringEditedTOO, Quality Control Quality Assurance Manual, California Department of Transportation, Production, Hypothesis testing