Transcription of A. Introduction - NERC
{{id}} {{{paragraph}}}
Standard Transmission and Generation Protection System Maintenance and testing Page 1 of 6 A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and testing 2. Number: 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested. 4. Applicability Transmission Owner. Generator Owner. Distribution Provider that owns a transmission Protection System. 5. Effective Date: In those jurisdictions where regulatory approval is required, all requirements become effective upon approval.
Standard PRC-005-1.1b — Transmission and Generation Protection System Maintenance and Testing Page 3 of 6 protection of radially connected transformers 1a February 17,
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
SOFTLINES TESTING QUALITY ASSURANCE, SOFTLINES TESTING QUALITY ASSURANCE MANUAL TravelSmith, Leak Testing and Special Application for assembly, Testing, Line, ADVANCED RUBBER TESTING TECHNOLOGIES, CARBURETOR POP-OFF PRESSURE TESTER, CARBURETOR POP-OFF PRESSURE TESTER INSTRUCTIONS, Hypothesis testing, Electrical Safety Testing, Guide to ATP Hygiene MonitoringEditedTOO, Quality Control Quality Assurance Manual, California Department of Transportation, Production, Testing Medical Device and Package Integrity