A. Introduction - nerc.com
Standard IRO-010-2 reliability Coordinator Data Specification and Collection A. Introduction 1. Title: reliability Coordinator Data Specification and Collection 2. Number: IRO-010-2 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact reliability , by ensuring the reliability Coordinator has the data it needs to monitor and assess the operation of its reliability Coordinator Area. 4. Applicability reliability Coordinator. Balancing Authority. Generator Owner. Generator Operator. Load-Serving Entity.
R2. The Reliability Coordinator shall distribute its data specification to entities that have data required by the Reliability Coordinator’s Operational Planning Analyses, Real-
Download A. Introduction - nerc.com
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Reliability Toolkit: Commercial Practices Edition, Reliability analysis, Fault tree analysis, Defense Technical Information Center, Reliability-Centered, RELIABILITY ANALYSIS METHODS FOR CALIBRATION, Sample maintenance audit report, Reliability, Fundamentals of Vibration Measurement and Analysis, Reliability Prediction edited, Oil Analysis Tables, Analysis