AMPLUS LTD. METHOD STATEMENT - TRIAL PITS. METHOD OF EXCAVATION - machine . project NO: 1 GENERAL. TRIAL pits will be marked out and their locations agreed with the Engineer. No instruction will be given for each individual pit unless specific technical variation from the specification adopted for the works is required. 1. Positions and access routes will be agreed with the Engineer/Client. 2. Underground Services location plans made available by the Client/Engineer will be viewed, pits will be located to avoid such services. A Cable Avoidance Tool (CAT) will be used to identify the location of underground services. 3. Each location would be fenced using 'Heras' or similar fencing to protect the general public/vehicles, suitably screened where splashing is considered a problem. 4. A permit to dig will be issued by the Engineer before excavating. machine Excavated Pits 5. Mechanical excavator provided by sub-contractor with suitably qualified operator.

AMPLUS LTD METHOD STATEMENT - TRIAL PITS METHOD OF EXCAVATION - MACHINE PROJECT NO: 1 GENERAL Trial pits will be marked out and their locations agreed with the Engineer.

  Project, Methods, Machine, Tips, Testament, Trail, Excavations, Method statement trial pits method, Method statement trial pits method of excavation machine project

Download AMPLUS LTD METHOD STATEMENT - TRIAL PITS METHOD …


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries