Appendix B – Technical Constraints
Appendix B Technical Constraints Contents Appendix B Technical Constraints 1. Introduction 4. 1 Regulation and legislation on high speed components 5. UIC standards 5. Interoperability European Directive 5. Particular features on the British network 6. 2 Operations and Constraints 7. Dedicated passenger high speed traffic 7. Integrated or segregated network 7. Double track or single track 7. Links between speed, signalling and headway 8. Bi-directional signalling and consequent equipment 9. Journey times and capacity of a high speed line 9. Timetabling 13. Stations and operations 13. 3 Design of a new line 16. Topographic Constraints 16. Track standards 17. 4 Superstructure 20. Track bed 20. Resistance of track to lateral forces (cross wind) 20. Tunnels 20. Environmental impacts 21. 5 Track laying 23. Type of track support 23. Rail equipment 23. 6 Depots and maintenance workshops 25. Five types of maintenance 25.
Page 7 of 33 2 Operations and constraints 2.1 Dedicated passenger high speed traffic Building railway lines that are able to operate both …
Download Appendix B – Technical Constraints
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Programme Control Board, Railway, Traffic Management, Railway Systems Business Unit Business Strategy, Hitachi Outline, Safety, Railway Safety, OECD OECD, OECD, Management, Traffic, University of Birmingham and Network, Acronyms and Abbreviations for Railways, European Railway, Incident Response Planning & Management