Transcription of Appendix B – Technical Constraints
{{id}} {{{paragraph}}}
Appendix B Technical Constraints Contents Appendix B Technical Constraints 1. Introduction 4. 1 Regulation and legislation on high speed components 5. UIC standards 5. Interoperability European Directive 5. Particular features on the British network 6. 2 Operations and Constraints 7. Dedicated passenger high speed traffic 7. Integrated or segregated network 7. Double track or single track 7. Links between speed, signalling and headway 8. Bi-directional signalling and consequent equipment 9. Journey times and capacity of a high speed line 9. Timetabling 13. Stations and operations 13. 3 Design of a new line 16. Topographic Constraints 16. Track standards 17. 4 Superstructure 20. Track bed 20. Resistance of track to lateral forces (cross wind) 20. Tunnels 20. Environmental impacts 21. 5 Track laying 23. Type of track support 23. Rail equipment 23. 6 Depots and maintenance workshops 25. Five types of maintenance 25.
Page 7 of 33 2 Operations and constraints 2.1 Dedicated passenger high speed traffic Building railway lines that are able to operate both …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Programme Control Board, Railway, Traffic Management, Incident Response Planning & Management, OECD OECD, OECD, Management, Traffic, University of Birmingham and Network, European Railway, Safety, Railway Safety, Hitachi Outline, Acronyms and Abbreviations for Railways, Railway Systems Business Unit Business Strategy