Appendix B: Work Breakdown Structure (WBS)
NASA cost Estimating handbook Version Appendix B work Breakdown Structure (WBS) B-1 February 2015 Appendix B: work Breakdown Structure (WBS) Introduction The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. In accordance with NASA directives NPR ( NASA Space Flight Program and Project Management Requirements ), NPR ( NASA Information Technology and Institutional Infrastructure Program and Project Requirements ), and NPR ( NASA Research and Technology Program and Project Management Requirements ), the WBS and WBS Dictionary are mandatory elements of a project s management baseline.
NASA Cost Estimating Handbook Version 4.0 Appendix B Work Breakdown Structure (WBS) B-1 February 2015 ... Cost Analysis Data Requirement (CADRe) database. The development of a WBS with those ... When performing a full Life Cycle Cost (LCC) estimate, the analyst must consider the temporal aspects of the WBS. Ideally, all elements of the WBS will ...
Download Appendix B: Work Breakdown Structure (WBS)
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: