BOP PRESSURE TESTING PROCEDURE - Contract …
Romfor International Ltd. STEP SUB PROCEDURE REMARKSBOP PRESSURE TESTING PROCEDURE1Discuss Operator BOP requirementsWITH RIG that all Romfor's BOP equipment is tested consistentwith Romfor's policy. This may require Nabors to incur thecost for the TESTING subcontractor as well as provide rigtime to the Operator for the Requirements - Hard Hat, Safety Glasses, WorkGloves, Steel Toe Shoes, Back Support, and Anti-FallProtection. Fit for Duty check on all JSA for PRESSURE TESTING Manager to discuss procedures with pressuretesters. This is to include: -Stack design (Class II, IV, etc.) -The proper size and type of test plug to fit the casinghead. -Position, size and PRESSURE rating of choke manifold andvalves. -Wellhead rated working PRESSURE . -The drill pipe grade and operating PRESSURE of the drillpipe.
STEP SUB PROCEDURE REMARKS Romfor International Ltd. BOP PRESSURE TESTING PROCEDURE.2-Cellar covers are to be reinstalled as soon as practical.
Download BOP PRESSURE TESTING PROCEDURE - Contract …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Leak Testing Methodologies, Pressure, Pressure Test, Test pressure, Test, HYDROSTATIC PRESSURE TESTING, CARBURETOR POP-OFF PRESSURE TESTER, CARBURETOR POP-OFF PRESSURE TESTER INSTRUCTIONS, Engineering Pressure Testing & Technical with, Pressure testing, Safety requirements for pressure testing, Testing Medical Device and Package Integrity, Hydrostatic Testing