CONSTRUCTION SPECIFICATION FOR …
Page 1 Rev. Date: 11/2014 OPSS 407 ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS SCOPE REFERENCES DEFINITIONS DESIGN AND SUBMISSION REQUIREMENTS MATERIALS EQUIPMENT - Not Used CONSTRUCTION QUALITY ASSURANCE - Not Used MEASUREMENT FOR PAYMENT BASIS OF PAYMENT APPENDICES 407-A Commentary SCOPE This SPECIFICATION covers the requirements for the installation of maintenance holes, catch basins, ditch inlets, and valve chambers.
page 1 rev. date: 11/2014 opss 407 ontario provincial standard specification metric opss 407 november 2014 construction specification for
Download CONSTRUCTION SPECIFICATION FOR …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
General specifications for electrical works, Works, Construction works specifications cover page, Construction works specifications, Construction works, Specifications and Details for Public Works, Specifications and Details for Public Works Construction, Specifications, CONQUAS 21, Page, CONSTRUCTION, Rock Manual, Standard Construction Specifications PIPE EXCAVATION, BEDDING, Guidance Note on the, Guidance Note on the Construction, Approved Large Meter & Water Construction