CONSTRUCTION SPECIFICATION FOR …
Page 1 Rev. Date: 11/2014 OPSS 407 ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS SCOPE REFERENCES DEFINITIONS DESIGN AND SUBMISSION REQUIREMENTS MATERIALS EQUIPMENT - Not Used CONSTRUCTION QUALITY ASSURANCE - Not Used MEASUREMENT FOR PAYMENT BASIS OF PAYMENT APPENDICES 407-A Commentary SCOPE This SPECIFICATION covers the requirements for the installation of maintenance holes, catch basins, ditch inlets, and valve chambers. SPECIFICATION Significance and Use This SPECIFICATION has been developed for use in provincial and municipal-oriented Contracts. The administration, testing, and payment policies, procedures, and practices reflected in this SPECIFICATION correspond to those used by many municipalities and the Ontario Ministry of Transportation.
page 1 rev. date: 11/2014 opss 407 ontario provincial standard specification metric opss 407 november 2014 construction specification for
Download CONSTRUCTION SPECIFICATION FOR …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
SECTION 047200 – ARCHITECTURAL CAST STONE, Handling, Handling of Nanomaterials in Research Laboratories, MBB2147RC MBB2073RC HARD DISK DRIVES, Mbb2147rc mbb2073rc hard disk drives product, Belts Product Specification HIC, Belts Product Specification HIC Manufactured UNIVERSAL, 3000 HANDLING ASBESTOS CEMENT PIPE, San Antonio Water System, Section 13210 COMPOSITE ELEVATED WATER, Section 13210 COMPOSITE ELEVATED WATER STORAGE, Ballast Paver Spec, Transporting