DETAIL DESIGN DRAWINGS
CONSTRUCTION OF GANGCHITPO BAILEY BRIDGE ON SILAMBI-NAGORGC ROAD, LINGMITHANG REGIONAL OFFICEOCTOBER., 2017 DATEDS 80 DETAIL DESIGN DRAWINGSSPANCARRIAGE WAYSHEET CONTENTS :DRAWING LISTREVISIONDATEDRAWING :NAME & SIGNATURE(as Sheet A3 size)NTSGB-DL-01FIRST ISSUEOct., 2017DESIGN DRAWN CHECKED APPROVED ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlementDepartment of Roads, Bridge DivisionThimphu, BhutanBAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE[DS 80 FT SPAN & m CARRIAGEWAY]On Silambi-Nagor GC Roadunder Lingmithang Regional OfficeKARMA WANGDI (CE)RINCHEN KHANDU (EE)TSHEWANG RINZIN (E)TSHEWANG RINZIN (E)REVISED REBAR CODES & SHAPE DETAILSGB-GN-0276543GB-DL-01DRAWING LIST2COVER PAGE1DRAWING NUMBERDESCRIPTION SLGENERAL NOTES DRAWING LIST8GENERAL ELEVATION 01141312111091516GENERAL PLAN 01GENERAL PLAN 02REINFORCEMENT SECTION & REINFORCEMENT SIDE VIEW OF LEFT ABUTMENT 17REINFORCEMENT PLAN OF RETURN WALLBAR BENDING SCHEDULE OF LEFT ABUTMENT GENERAL ELEVATION 02SIDE ELEVATION & FRONT ELEVATION OF LEFT ABUTMENTSECTIONAL ELEVATION & REINFORCEMENT VIEW "1-1-" OF LEFT ABUTMENTREINFORCEMENT DETAILS OF LEFT ABUTMENTFRONT REINFORCEMENT VIEW & SECTION "E-E" OF LEFT ABUMENTSPACER PLAN & SECTION OF LEFT ABUTMENTGB-RCSD-03GB-GP01-04GB-GP02-05GB -GE01-06GB-GE02-07GB-ABT-08GB-ABT-09GB-A BT-10GB-ABT-11GB-ABT-12GB-ABT-13GB-ABT-1 4GB-ABT-15GB-ABT-1618192021BAR BENDING SCHEDULE OF LEFT RETURN WALLSIDE ELEVATION & FRONT ELEVATION OF RIGHT ABUTMENTFOOTING & BEARING
00 a 11 b Total Length : a a Total Length : r a b d c 51 Total Length : 2(a+b)+16d 21 b a c Total Length : a+b+c-r-2d SHAPE CODE AS PER ISO 4066 : 2000 LEGEND : r = BENDING RADIUS AS PER TABLE 4 d = DIAMETER OF BAR a/b/c/d = AS SHOWN a+b - ½r-d NOTES A. GENERAL ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED. …
Download DETAIL DESIGN DRAWINGS
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: